System formwork for

in-situ concrete
construction

• Group 4 – Growers
• Supervisor : Lars Hyldedal

1
Basement
plan
Structure dimensions:
• Strip foundations - 0.6m x 0.6 m
• Pad foundations - 2 rows 1.3 x 1.3 x 0.6 m, in total 34 units
• Columns - 0.4 x 0.4 x 3.0 m
• Basement wall 0.3 m – width and 3.0 m – height over strip
foundation
• Reinforced slab - 250 mm thick with drop beam 500 mm

2
Assumptions

• Concrete delivery - 12m3/h.


• Concrete curing time
 Foundations, columns and walls – 2 days.
 Slab + beam construction – 3 days.

• Assembling and disassembling time for


different types of formworks.
• Transverse walls and columns are adjusted to
fit the drop beam. Column height is reduced to
2.5 meters and walls have two holes of 500 mm
3
Workers
Two teams of four workers each, who have experience working with
Doka system formworks.

4
Foundations
(framed formwork Framax
Xlife)

• Framax Xlife panels can be


used for strip and pad
foundations.
• Advantageous because we
intend to continue forming
(for example: the walls)
using the same panels.
• Foundations can quickly be
formed with any of the
panels, placed either
vertical or horizontal.

5
Walls
(framed formwork Framax
Xlife)

Framax Xlife is chosen because


of the:
• 135 width.
• Panels of 330 cm height.
• High number of re-use
cycles of formskin.

6
Slab
(Dokaflex 30 tec)

a = 1180 mm
b = 2580 mm
c = 625 mm

• Fewer floor props for big


constructions, because they can be
extended.
• Allows easy forming of drop beams.
• 80% more load bearing capacity
compared to other slab formworks.

7
Drop beam in slab construction

8
Beam Foundation Column
9
16
19
15
1813
14
24
20 12
11thth
th
th
th
th
thth
day
and
day
thday
day
dayday
day –
-17
-
– –-–first
– second
second
the day
concrete
theth
second
concrete
first second–
second
half
half half
days
half
of
half
of of
half
of
slab
of
half
wall
Casting progress off
of
wall
+
9
78
10
1
wall
46
2
3
th
th
slab
wall
ofis 5
beam
pouring
st
th
slab
th
nd
th
is
cured
poured
strip
day
day
th
rdday
is
dayday
day
daypoured
cured
+ is
formwork
+ -


beam
forbeam
and
first
–-– the
–second
34
theday
day
half
first
cured
theand
first
in 8 hours
foundation
in
half
is
off
first
pad 8
second
off
of
half
is
of wall
half
half
hours
strip
formwork
half
and
builtof
cured
second
disassembled
from of
of
of
foundations
half
strip
in
by 622nd
th 6
is
of
isbystrip
foundations
are 2
strip
disassembled
built
foundation
disassembled
slab
hours
and by foundation
workers.
ready,
foundation
by4
disassembled 8 in
formwork
workers
workers is
in
in 5
ndcured
4
4 from
is
hours
in
hours
in 9
3 removed
poured
and
6 in
half
in 4
workers,
day of
hoursslab
isiscured +,
nd2
2 and beam
row rowof by
of 4
column
day
hourshours
Half
in
hours3.5 2of
in 7 hours cured
+
the
hours
disassembled
hours. slab
and
+ and +
3.51
in
stwall
beam
3row
hours
hours of to be
workers
columns
formwork
disassembled in is 9 hours
cured
is built
built
in 3 and
by
hours6 in 6
Theformwork
3
formwork
columnhours
concrete
used basementforformworkis
concrete
is built
pouring
the by
second
is on 6 it
is built
half in 75
in
disassembled
workers in 6 inready
hours 3 hours
+ 1
hours
pouring
workers
hours
hours + in18hour hours of concrete
hour concrete pouring
pouring

11
Thank you for your attention!
Any questions?
Ask google.

11