Civil Engineering Construction

& Graphics
CEC&G
Course Code CE-205
TEACHERS
(Session 2018)

Theory Lab/Practical work


Engr. Sehrish Khan Engr. Sehrish Khan Manual
Drawing

Engr. Intezar Hussain AutoCAD


Marks Distribution
Theory = 100
Practical = 100 THEORY
Total = 100

30 Marks 10 Marks 10 Marks 40 Marks


10 Marks
Mid Term CEP+ Quiz-II Final Term
Quiz-I
Examination Assignments 10 Minutes Examination
10 Minutes
1 Hours (Theory) 1.5 Hours
Term duration
• Starting Date = 20-01-2020
• Ending Date =

16 Weeks
SYLLABUS
• Introduction: Site selection, orientation and setting out for civil engineering projects.
• Masonry Construction: Types of stone, brick and block masonry. Bonds in brick
masonry.
• Dampness in Buildings: causes and remedial measures.
• Floor Finishes : various types of floor finishes, interior and exterior finishes.
• Scaffolding and formwork
• Building Joints: Expansion and construction joints, factors affecting their location.
• Concrete Construction: Batching, mixing, transportation and compaction of concrete.
Pre-cast concrete, concrete construction. Quality control in concrete construction.
• Woodwork in building construction:
• Defects in building construction. Principal defects, diagnosis, causes and remedial
measures.
• Concrete Machinery: Stone crushers. Machines for cleaning and grading of
aggregates. Concrete mixers, vibrators and pneumatic tools.
• Types of Civil Engineering drawing. Preparation of plans, elevations and sections.
Working drawings of a residential building. Computer graphics. Application of
architectural planning and rendering in Civil Engineering projects.
Recommended Books
• Building Construction
By Huntington
• Building Construction
By W.B. Mc. Kay
• Building Construction
By N.L. Arora & B.R. Gupta
• Building Construction Class Notes & Presentations
CLOs & PLOs
WEEK # 1

– Introduction
– Site Selection
– Orientation & setting out of Civil Engineering
Projects
INTRODUCTION
• CEC&G deals with the construction techniques
& materials adopted/used for different civil
engineering projects to ensure
– Systematic
– Safe and
– Economical completion of projects
• Graphical tools like AutoCAD (Software)
(computer-aided drafting) provides the facility to
draw the detailed drawings of projects.
• Civil engineering projects can be broadly
classified in to the followings categories.
– Buildings(All types)
– Roads, Railways, Airports & Bridges
– Dams, Reservoirs & Canals.
– Underground structures (Tunnels)
• Civil engineering projects works can be
divided in to three parts
1. Architectural works
2. Structural design works
3. Execution works
1. Architectural works
Architectural works involves Planning, orientation
and aesthetics of the Projects.
2. Structural design works
Structural design work involves design of horizontal
and vertical components of Projects.
Horizontal components are … Floors, Beams, Slabs
etc.
Vertical components are …. Columns, walls, piles
3. Execution works
It involves the Physical execution of work at site by
using the drawings and specifications.
Site Selection
• It means selection of best site for the
project which provide
– Safety
– Economy
• It is a project specific job.
• It depends on the
1. Requirements of user/client
2. Use of Project
3. Finance available
General Rules for site selection
• It should provide minimum disturbance to the
residents of the area.
• Site should be selected that it provides good
drainage.
• Site should be easily accessible.
• Construction material should be easily available.
• Transportation of construction material is easy.
• The benefit cost ratio (BCR) of the project
should be greater than 1.
Orientation of Buildings & setting
out of Civil engineering Projects
• What is Orientation of buildings?
– It is defined as the art of placing a building in such a
position that its front faces a particular direction.
• Objective of Orientation of Buildings
– To place the building so as to suit its surroundings.
– To provide natural comfort to users.
– To provide privacy to inmates.
– To protect residents from dust and noise pollution.
– To place the building in such direction that its
minimum portion comes in contact with direct rain
showers so as to avoid dampness in building.
Factors effecting Orientation of
Buildings
Following factors are important for deciding the
Orientation of Buildings.
1. Surroundings of the Site
The building should be so oriented that it suits surrounding of
the site.
2. Approach to road or street
Approach to nearby road means a good orientation.
3. Sun Movement.
Sun path and sun rays are important in deciding the placement
of different rooms in a building.
Sun Movement.
• Sun is the important source of energy,
natural light and Temperature.
• If sunrays are properly falling on the
building then it will provide a good living
conditions in the buildings.
Arrangement of Different rooms in
a Residential Building w.r.t Sun
Movement
• Drawing or Living rooms SE-W
• Dining rooms SE-SW
• Bed rooms SE-NW
• Verandah S-W
• Kitchen NE-SE
• Stairs, Stairs case & stores NE-NW
Useful links
• Brick Masonry
– http://www.bia.org/html/frmset_thnt.htm
• CAD TUTOR
• Commands
– http://www.cadtutor.net/tutorials/

Potrebbero piacerti anche