Sei sulla pagina 1di 2

Bill Sample

• Elemental Cross checking Method


•  Excavation Quantity = Filling Quantity + Disposal Quantity
•  Ground floor Concrete Bed Quantity = DPM area x Concrete bed thickness
•  Anti - termite treatment area = GI Mesh for Ground floor Concrete Bed
•  Anti termite treatment < Topsoil Excavation
•  If DPC thickness = 300 mm,
• Excavation Quantity = DPC Qty x Foundation Width x Foundation height
•  Reinforcement Quantity (Kg) = Concrete Volume (m
• ) x Factor (Kg/m3)
•  Beam – 175 -200 Kg/m

•  Column – 110 -125 Kg/m


•3

•  Ground floor Slab – 35 – 40Kg/ m


•3

•  Lintel – 50 x 60 Kg/ m

•  Floor slab – 80 – 110 Kg/m


•3


•3
•3
•3