Sei sulla pagina 1di 19

14 Januari 2019

WAY FORWARD
TO OBTAIN N-219 TYPE CERTIFICATION
This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
0. Introduction – Certification Basis N219 (1/2)
 CERT BASIS : DGCA TP PM01, Stage 3, date 4 Agustus 2016
 CERT PLAN : N219 CERTIFICATION PLAN / DOC. NO. :D991ND01001, Rev. D, 27 April 2018
 COMPLIANCE CHECK LIST : N219 COMPLIANCE CHECK LIST / DOC. NO. : D991ND02001, Rev D, 9 Mei 2018

Means of Compliance (MOC)


PANEL 0. 1. 2. 3. 4. 5. 6. 7. 8. 9.
State- Descrip- Analysis Safety Lab. Ground Flight Inspeksi Simulasi Kualifikasi Total %
ment tion Analysis Test Test Test

0 RMS & Certification - 1/1 1/3 24/31 - - - - - 0/1 26/36 72%


Mgnt
1 Flight - 0/1 - - - - 0/2 - - - 0/3 0%
2 Aero & Staibility Control - - - - - - 1/3 - - - 1/3 33%
3 Structure - 9/10 59/93 - 23/71 2/3 2/5 - - - 102/182 56%
4 Mechanical System - 4/4 0/1 - - 6/9 3/6 - - 2/4 15/24 63%
5 Electrical - 2/4 6/7 - 10/11 15/24 1/4 - - 1/1 35/51 69%
6 Avionic - - 5/5 - - 3/13 0/8 - - - 8/26 31%
7 Power Plant - 2/2 3/3 - - 4/6 3/6 - - - 12/17 71%
8 Cabin Safety & Flight - 6/6 4/4 1/1 3/3 13/21 - 1/1 - - 26/38 68%
Deck
Total - 24/28 78/116 25/32 43/85 43/76 10/34 1/1 - 3/6 225/380 59%
PROSENTASE - 86% 67% 78% 51% 57% 29% 100% - 50% 59%

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
0. Introduction – Certification Basis N219 (2/2)

Certification Basis
N219
Certification Plan
CERT. PROGAM
Conpliance Check List

TECH. DOC
PROTOTYPE &
(DESC. & LAB TEST GROUND TEST FLIGHT TEST OTHERS
CONFORMITY
ANALYSIS)

 PANEL-0  PANEL-3  PANEL-3  PANEL-2  PANEL-0  PANEL-4


 PANEL-1  PANEL-4  PANEL-5  PANEL-3  PANEL-1  PANEL-5
 PANEL-2  PANEL-5  PANEL-8  PANEL-4  PANEL-2  PANEL-6
 PANEL-3  PANEL-6  PANEL-5  PANEL-3  PANEL-7
 PANEL-4  PANEL-7  PANEL-6  PANEL-4
 PANEL-5  PANEL-8  PANEL-7  PANEL-5
 PANEL-6  PANEL-6
 PANEL-7  PANEL-7
 PANEL-8

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
1. Description/Analysis Document’s for TC

N219 Description/Analysis
Document :
• TOTAL TD : 176 TD
• DGCA ACC : 127 TD (72 %)
• REVISE : 12 TD (7 %)
• READY FOR REVIEW : 2 TD (1%)
• NOT FINISH YET : 49 TD (28 %)

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
1. Description/Analysis Document’s for TC

Dokumen Ground Test Procedure Complete


1/24/2019

Dokumen Structure Test Requirement


Complete
2/28/2019

Dokumen Analisis Complete


4/26/2019 Dokumen Flight TRA
Complete
Dokumen Ground Test Req Complete Dokumen Structure Test Plan Complete 9/13/2019
1/24/2019 4/26/2019
Dokumen TRA
Dokumen Ground TRA Complete Dokumen Structure TRA Complete Complete
5/10/2019 7/13/2019 9/13/2019

Jan Feb Mar Apr May Jun Jul Aug Sep 2019
Today

Timeline Compliance Document N219


This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
2. N219 Conformity Inspection Status (1/2)

STATUS CONFORMITY DGCA


REF CIP H (D000ND0002_H) DAN DGCA RFC
No. 202/P3/N219/V/18
Status : 08 Januari 2019

PD1 (PK-XDT) PD2 (PK-XDP)


Grand LEVEL H SAT UNSAT IN PROC Grand
LEVEL H SAT UNSAT IN PROC Total Total

ASSY 734 33 215 982 ASSY 742 15 215 972

DPM 638 9 15 662 DPM 639 7 12 658

Grand Total 1372 42 230 1644 Grand Total 1381 22 227 1630

% 83% 3% 14% 100% % 85% 1% 14% 100%

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
2. N219 Conformity Inspection Status (2/2)

Tail TD1 Conform


1/15/2019
Rudder TD1
Conform
2/1/2019

Fuselage TD1 Conform Conformity Complete


2/15/2019 6/20/2019

PD2 Conform Flap TD1 Conform Aileron TD1 Conform TD2 Conform
2/4/2019 2/22/2019 3/27/2019 6/20/2019

Elevator TD1 Conform PD1 Conform Wing TD1 Conform TD1 Conform Fuselage TD2 Conform Wing TD2 Conform
1/18/2019 2/17/2019 3/6/2019 3/30/2019 5/13/2019 6/20/2019

Jan Feb Mar Apr May Jun 2019


Today

Timeline Conformity N219


This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
3. Laboratorium Test (MOC 4) (1/2)
Wing Static Test
14%|92%|20 %

Engine Mount Static Test


100%|100|30 %
Elevator Static Test
50%|53%|0 %
Tail Static Test
Laboratory Test

100%|93%|0 %
Rudder Static Test
50%|91%/0 %
Control Surface Ready
DGCA Not
To
Flap Static Test PANEL Revision Finish TOTAL
50%|79%|0%
ACC Revie Yet
Fuselage Static Test w
33%|90%|0% Panel #3 30 9 2 30 71
Aileron Static Test
50%|70%|0%
Fatigue Test Panel #5 10 0 0 1 11
43 %|96%|0%
Panel #8 3 0 0 0 3
Windshield Bird Impact
0 %|0 %|0 % TOTAL 43 9 2 31 85

Flammability Test
100%|90%|80%

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
3. Laboratorium Test (MOC 4) (2/2)

Engine Mount Complete


1/25/2019 Control Surface Complete
5/6/2019
Fuselage Fatigue
Wing Static Complete 9/13/2019
5/24/2019
Wing Fatigue
Static Test Complete 9/19/2019
Bird Impact Complete 6/26/2019
3/4/2019 Fatigue Test
Tail Complete Fuselage Static Complete Complete
6/13/2019 9/26/2019
3/19/2019

Jan Feb Mar Apr May Jun Jul Aug Sep 2019
Today

Timeline Structure Test N219


This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
4. Certification Ground Test [MOC 5] (1/5)
Ready Not
PANEL DGCA Revision To Finish TOTAL
ACC Review Yet
Panel #3 2 0 1 0 3
Ground Test “MOC 5” status
based on N219 Certification Panel #4 6 0 0 3 9
Compliance Check List” Doc
Panel #5 15 1 0 8 24
No. D991ND02001, Rev. D,
dated 09 Mei 2018 Pane #6 3 3 0 7 13
• TOTAL TD : 76 TD Panel #7 4 0 0 2 6
• DGCA ACC : 41 TD (53%)
• REVISE : 7 TD (9,2 %) Panel #8 11 3 0 7 21
• READY FOR REVIEW : 1 TD (1,2 %) TOTAL 41 7 1 27 76
• NOT FINISH YET : 27 TD (35%)

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
4. Certification Ground Test [MOC 5] (2/5)

Ground Vibration Test Flight Control System


50 %|84 %|0 % 100%|0%|0% Ground Vibration Test

Hydraulic System
Mechanical System
100%|0%|0% Mechanical System EBGR
100%|0%|0%
Ground Test

Ground Test
Electrical System
Landing Gear System
100%|0%|0% Electrical System EPGDS 100%|100%|
100%

Avionic
Avionic Lighting 95%|30%|
30%

Power Plant
Power Plant

Cabin Safety & Flight Deck


Cabin Safety & Flight Deck

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
4. Certification Ground Test [MOC 5] (3/5)

Ground Vibration Test Ground Vibration Test

Mechanical System Mechanical System

Electrical System
Communication Electrical System
Ground Test

Ground Test
60%|0%|0 %

Avionic
Indicating & Recording Avionic
90%|29%|29 %
Fuel 100%|
20%.|20%
Power Plant
Navigation Power Plant
50%|0%|0 %
Propulsion 100%|
0%|0%
Cabin Safety & Flight Cabin Safety & Flight
Deck Deck

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
4. Certification Ground Test [MOC 5] (4/5)
Ground Vibration
Test

Mechanical System

Ground Test
Electrical System
Environmental Control
System
100%|10%|10%
Avionic
Fire Protection
50%|50%|0%
Power Plant
Flight Deck
50%|10%|0%
Cabin Safety & Flight
Deck
Ice & Rain Protection
50%|30%|30%

Interior
100%|84%|0%

Oxygen
100&|0%|0%

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
Panel 7 Complete
3/22/2019

Fuel
3/22/2019

ENP Fire Protection Panel 6 Complete


1/11/2019 2/22/2019 3/22/2019 System Ground Test Complete
4/6/2019
EPGDS Ice&Rain Protection Lighting
1/11/2019 3/1/2019 3/29/2019

EBGR Hydraulic Flight Director Panel 5 Complete


1/18/2019 2/22/2019 3/15/2019 3/30/2019

Continuity Propulsion Landing Gear System Comunication Panel 8 Complete


1/18/2019 2/15/2019 3/1/2019 3/22/2019 4/6/2019

Jan Feb Mar Apr 2019


Today
Flight Control System
3/8/2019

Panel 4 Complete
3/8/2019
Flight Deck
3/15/2019

Navigation
3/15/2019

Indicating&Recording
3/15/2019
Interior
3/22/2019

Timeline System Ground Test N219 Oxygen


3/22/2019
This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
5. Certification Flight Test [MOC 6] (1/2)

PANEL DGCA ACC Revision Ready To Not Finish TOTAL


Review Yet

Panel #1 0 0 0 2 2
Flight Test “MOC 6” status
based on N219 Certification Panel #2 1 0 0 2 3
Compliance Check List” Doc
No. D991ND02001, Rev. D, Panel #3 2 0 1 2 5
dated 09 Mei 2018 Panel #4 3 0 0 3 6

• TOTAL TD : 36 TD Panel #5 1 0 0 3 4
• DGCA ACC : 10 TD (27%) Panel #6 0 0 0 8 8
• REVISE : 0 TD (0 %)
• READY FOR REVIEW :1TD (2,7 %)
Panel #7 3 0 0 3 6
• NOT FINISH YET : 25 TD (58 %) Panel #8 0 0 0 2 2
TOTAL 10 0 1 25 36

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
Install Garmin Nxi PD1
2/21/2019

MLG Install PD2 Flight Control closed


1/17/2019 2/28/2019
NLG Install PD1
Install Garmin Nxi PD2 3/5/2019 NLG Install PD2 TIA (DGCA on Board)
1/17/2019 PD1 ke Nusawiru 5/22/2019 7/23/2019
3/14/2019

Nov Des 2019 Feb Mar Apr Mei Jun Jul Agu Sep 2019
Today 3/8/2019
Conformity
PD1/PD2
PD1 Flight Development
11/28/2018 1/17/2019
PD1 Block-2A 25FH
Envelope Expansion, Flt Physic & Propulsion
2/1/2019 2/20/2019 (Light Weight, Low-Medium Speed)
Flight Physic & Flight Load (Heavy Weight,
3/14/2019 PD1 Block-2 40FH 4/26/2019 Low-Medium Speed)
Field Performance, Brakes &
PD2 Initial Flight 5/6/2019 PD1 Blok-3 80FH Flutter Test 8/7/2019 Water Ingestion (paved
runway)
12/20/2018 1/16/2019 Performance; System Test; Equipment & Furnishing PD1 Blok-5 30FH
8/15/2019 9/13/2019
2/14/2019 PD2 Blok-2 80FH 5/15/2019
PD2 Blok-3 10 FH
Noise; Minimum Crew; Cooling Test 5/23/2019 6/10/2019
PD2 Blok-4 25FH
Cross Wind Operation 6/18/2019 7/15/2019
PD2 Blok-5 20FH
DGCA 7/23/2019 8/14/2019
Flight
PD2 Blok-6 20FH
Flutter Test 8/22/2019 9/13/2019
Final TCB
TIMELINE CERTIFICATION FLIGHT TEST 9/16/2019 9/30/2019

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
6. Equipment Qualification
Status : 21 November 2018
Qualification Status – PTDI Status Qualification – DGCA

No. Catagory Total


Closed Open
Closed Open NYR
(Rev Form 345)

1 TSO 65 65 0 65 0 0

By Development 43 43 0 43 0 0
In
2 Conjunction
with TC DGCA TC 29 29 0 29 0 0

In Other Maner (Vendor Data


3
Analysis/ QTP-QTR/DDP/QSAR) 52 52 0 52 0 0

0 TOTAL 189 189 0 189 0 0

Ref. Terhadap dokumen CIP H (D000ND0002_H) DAN DGCA RFC No. 202/P3/N219/V/18, 96
Vendor Part telah dilaksanakan DGCA conformity dan dinyatakan “Satisfactory”

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
MASTER SCHEDULE TC N219
Flight Test Complete
9/13/2019
Dokumen Analisis Complete Fatigue Test
4/26/2019 1,000 FC
Conformity TD2
9/13/2019
6/20/2019
Dokumen TRA Complete
Static Test Completed 9/13/2019
6/13/2019
TC Basic
Conformity TD1 Award
3/30/2019 9/30/2019

Nov Des 2019 Feb Mar Apr Mei Jun Jul Agu Sep 2019
Today 3/8/2019 4/26/2019
Conformity
Ground Test
PD1/PD2
2/28/2019
Complete Configuration

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved
Thank You

This document and its commercial and technical data attached hereto are proprietary and confidential to PT. Dirgantara Indonesia (Persero) and constitute trade secrets for the purposes. No disclosure to others, either in Indonesia or abroad, or
reproduction of any part of the information supplied is to be made, and no manufacture, sale or use of any invention or discovery disclosed herein shall be made, except by written authorization of PT. Dirgantara Indonesia (Persero).
This notice will not operate to nullify or limit rights granted by contract, COPYRIGHT NOTICE©2011, PT. DIRGANTARA INDONESIA (PERSERO), Unpublished – All Rights Reserved 19

Potrebbero piacerti anche