Lecture 4:

4:
Software Process Management

Dr Valentina Plekhanova
University of Sunderland, UK

http://www.cet.sunderland.ac.uk/~cs0vpl/SE--Com185.htm
http://www.cet.sunderland.ac.uk/~cs0vpl/SE
Process Models «
¦ ˜ isting process models represent various
projects goal(s) and this defines an
ordering of project (tasks) activities.

Lecture 4 Valentina Plekhanova 2


Project Management
¦ n contrast with software process models, — 
 
  deals with resources.
¦ „oreover, it is used as a means to provide
planning, organisation, direction and control of
resources in order to meet an organisation¶s
objectives by a specific date and within a well-
defined budget.
¦ Project management involves the application of
limited resources to the completion of tasks in the
most effective and efficient manner.
Lecture 4 Valentina Plekhanova 3
Project Scheduling
¦ 0 pivotal problem of project management
is to find the best trade-offs among
resources.
¦ Support for the co-ordination of people,
tasks, equipment, products, time and
money is provided by —   
 
  
.
  

Lecture 4 Valentina Plekhanova 4


Planning Phase:
Estimating Duration & Cost
¦ ï ???
Duration ï
º 0nother important part is estimating the
duration of the project.
project
º Ñowever, in estimating these issues a large
number of variables are involved,
principally the human factor.

Lecture 4 Valentina Plekhanova 5


Cost Estimation
¦ 0n accurate cost estimation is an integral part of
any software project management plan.
¦ 0 number of approaches can be used for cost
estimation. These include:
¦ ˜ pert judgement by analogy: consultation
between a number of e perts to devise a cost
structure based on previous similar projects
he/she has worked on Bottom-up approach:
breaking the target product into smaller units.
Lecture 4 Valentina Plekhanova 6
COCOMO
¦ 0 number of algorithmic models have been
devised.
¦ The major one is Boehm¶s Constructive
Cost Model (COCO„O).

Lecture 4 Valentina Plekhanova 7


ÿraining Requirements
¦ Staff must be trained in new software
development methods; operating systems,
documentation preparation and hardware.
¦ 0 training plan must then be incorporated
into the SP„P.

Lecture 4 Valentina Plekhanova 8


Project Management: „etrics
¦ „etrics can be used to measure the size of
a product.
¦ These include:
º Lines of code (?!)
º Thousand delivered source instructions (?!)
º «?

Lecture 4 Valentina Plekhanova 9


Project Management: „etrics
¦ Ñowever, the above metrics are dependent
on the language used, whether e ecutable
or comments should be counted and not all
source code is delivered to the client.

Lecture 4 Valentina Plekhanova 10


Project Management ÿools
¦ Îell-known management tools are Critical Path
Method (CP„) and Program Evaluation
Report technique (P˜T).
¦ These tools are used to assist in the planning
phase.
¦ This can determine which activities are critical
and may delay the project if not completed on
time.

Lecture 4 Valentina Plekhanova 11


asic Project Management Scheduling
ÿechniques
¦ There are different types of schedules.
¦ Some of the basic ones are åantt charts
charts,
CPM and PERÿ types.

Lecture 4 Valentina Plekhanova 12


åantt Charts
¦ å    is the typical method of
scheduling construction projects.
¦ The primary limitation of this technique, as
is outlined in literature is its inability to
direct attention to the interrelationships and
interdependencies among the activities.

Lecture 4 Valentina Plekhanova 13


åantt Charts

Lecture 4 Valentina Plekhanova 14


Critical Path Method
¦ CPM  is based on the Critical Path „ethod.
¦ This type looks for the schedule with
minimum cost in a definite period of time
in the case where the cost is associated
with each activity.
¦ Time is a resource.
¦ The resource allocation problem is to
allocate time among project tasks.

Lecture 4 Valentina Plekhanova 15


Critical Path Method «& SE ..??!
..??!
10 E
 10
10 5
20 5
A V
D
15 C 15
10 F 10

0B˜V 30 ACDFV 50
0CDV 30 0DFV 45
0D˜V 35

Lecture 4 Valentina Plekhanova 16


Program Evaluation Review ÿechniques
¦  which is based on the Program
PERT  ,
˜valuation eview Techniques, looks for
the schedule, which minimises the
objective function such as project time
(total elapsed time).
¦ That is, it determines the start and
completion times of each activity.

Lecture 4 Valentina Plekhanova 17


CPM & PERÿ
¦ Both techniques CPM and PERÿ use network
methods to assist in project management and to
overcome the interrelationship limitation in Gantt
charts.
¦ Both these techniques CPM & PERÿ identify a
—  — whose activities could not be
delayed, and also indicate  that
could be somewhat delayed without lengthening
the project completion time.

Lecture 4 Valentina Plekhanova 18


CPM & PERÿ
PERÿ:: Difference
¦ CP„ and P˜T have the underlying
difference. From its origin viewpoint, the
CPM technique was developed for
   projects, while PERÿ was
elaborated for      — 
projects.

Lecture 4 Valentina Plekhanova 19


CPM
¦ n the       , prior
e perience with similar projects can be
used to predict time estimates for projects
within a relatively tight range.
¦ n the CP„ method the e pected activity
time is a 
—   that assumes
certainty: each activity is considered of
e act fi ed length. That is, CP„ assumes
that time is predictable or deterministic.
deterministic

Lecture 4 Valentina Plekhanova 20


PERÿ
¦ Ñowever, with    and — 
—  ,
 a great deal of uncertainty is
associated with time estimates because no
previous similar e perience e ists and
precise time estimates are not available.
¦ P˜T assumes the time estimate for an
activity lies within the range of earliest
time and latest time.
Lecture 4 Valentina Plekhanova 21
PERÿ [Gray, 1981]
¦ P˜T uses    (optimistic,
most likely, and pessimistic) to compute
the average or e pected time.
¦ P˜T offers a way of dealing with
random variation and considers each
activity stochastic in that variability is
allowed in each activity.

Lecture 4 Valentina Plekhanova 22


PERÿ [Plekhanova, 1998; Plekhanova 2000]
¦ t should be pointed out, that P˜T was
developed for    and — 
—  ,
 which consist of 
 

  .
¦ Ñowever, P˜T is not concerned with the
specific character of cognitive tasks.

Lecture 4 Valentina Plekhanova 23


CPM & PERÿ
¦ PERÿ&CPM have been found to be
useful in project management to provide
efficient resource scheduling. n particular,
P˜T&CP„ identify the critical jobs,
which control the project completion date.
¦ „oreover, the application of these tools
reduces the degree of scheduling errors
and, hence, increases the cost savings.
Lecture 4 Valentina Plekhanova 24
CPM & PERÿ
¦ Ñowever, as mentioned in project
management literature, the actual savings
derived from using P˜T&CP„ methods
are difficult to identify and measure
precisely.

Lecture 4 Valentina Plekhanova 25


*ote that [Plekhanova 2000]«
X e isting project management scheduling
tools are concerned with a problem of
resource availability and utilisation,
utilisation not
with capability and compatibility of project
resources.
X There is, therefore, an assumption that the
quality of project resources does not have
an impact on project scheduling and task
performance.
Lecture 4 Valentina Plekhanova 26
Paradox !!!! [Plekhanova 2000]
¦ Î —      
 —  —  
 
——      
       
—  —  [Gray, 1981]
      —
  — 

Lecture 4 Valentina Plekhanova 27


Management is a human activity !
¦ t is important to notice that although there
are many project management (scheduling)
tools, use of them does not guarantee
success.
¦ „anagement is a human activity and
project success depends on the competence
of management.

Lecture 4 Valentina Plekhanova 28