Tubing Flow
Cased Hole Completion
No Artificial lift
Vertical Well
PVT parameters:
Rs= 1215 scf/bbl, 31 Deg API, 0.72 sp. gr. of gas
Reservoir parameters:
Pr = 6203 psi, Tr = 283 deg F, PI = 0.5
Down-hole equipment:
Tubing ID: 2.2 inch upto 4548 m
Casing ID: 6 inch upto 4550 m
Geothermal gradient input as a table:
At surface Temp is 23 deg C and at bottom-hole 120 deg C
Sensitivities
Water Cut
Liquid Rate
Productivity Index
Base Case (Liquid Rate = 150 bbl/day)
Cases: Conclusion:
Liquid Rate =150 STB/day In this case with low fluid rate the temperature of the fluid drops
Top Node Pressure: 150 psi significantly below the pour point temperature of 33 deg C.
Sensitivity Analysis
Water Cut & Liquid rate sensitivites
39
36
Well Head Temp (Deg C)
33
30
27
0 10 25 50 70
24
21
0 100 200 300 400 500 600 700 800 900 1000 1100 1200
Cases: Conclusion:
WCUT : 0 - 70 % For WCUT above 50 % the min Liquid rate is 850 stb/day
Liquid Rate : 150-1100 bbl/day and below 50 % the min Liquid rate is 1050 stb/day
Cases:
WCUT : 0 - 90 %
THP : 50 – 1100 psi
Conclusion:
The Top node pressure needs to be in the range of 50 – 425 psi and the WCUT in the
range of 0-70 % for the WHT to be above 33 deg C
Cases: Conclusion:
THP : 150 - 425 psi Min PI required 0.38 with THP = 150 psi and Min PI
PI : 0.1 – 0.6 required 0.53 for THP = 425 psi
Shut-In Case
Case: Conclusion:
Liquid Rate = 0 STB/day (Shut-In condition) In case of Shut-in conditions the temperature of
Top Node Pressure: 150 psi the fluid drops significantly below the pour
point temperature of 33 deg C.
Conclusion
For the base case of 150 bbl/day the well does not flow to the surface as
the WHT falls much below 33 deg C
Min PI required is 0.38 with THP = 150 psi and Min PI required 0.53 for THP
= 425 psi
During Shut-in conditions the WHT falls much below 33 deg C in the top
500m section. So during reopening of the well, we will need some treatment
(Hot oil circulation or Hot water circulation) ready for flowing the well
Back-up slides
39
36
Well Head Temp (Deg C)
33
30
27
24
21
0 10 20 30 40 50 60 70 80 90 100
Cases: Conclusion:
WCUT : 0 - 90 % For WCUT above 70 % the min Liquid rate is
Liquid Rate : 150-1100 bbl/day 850
Cases: Conclusion:
THP : 50 -1100 psi The Top node pressure needs to be less than 400 psi
Cases: Conclusion:
WCUT : 0 - 90 % System with WCUT above 75% does not flow
Top Node Pressure: 500 psi