•Improving heat transfer in the system.
•Enhancing efficiency of the power plant.
•Minimizing under-deposit corrosion of the metal surface
•Minimizing plant outage due to boiler tube failures.
THE OBJECTIVE IS ACHIEVED BY:
STEP 3- PASSIVATION:
To develop uniform and adherent Magnetite layer.
Evaporator System
Economizer
Down comers
Water Walls
4. Ammonia solution (20% Min as NH3, sp gr:0.91) as per IS 799 / 1990 800 Liters
6. Bhelmax 450 kg
EDTA Cleaning:
EDTA Pickling & Passivation
Treated DM Water Rinsing
Inspection.
Alkali Flushing -Purpose
Alkali Flushing
–Removes organic materials such as oil, grease
etc. from the metal surface.
–Alkali reacts with polar organic materials to form
soluble glycerol's and salts.
–Loose deposits, dust etc. are also removed.
–TSP and DSP is used as alkali.
Alkali Flushing:
Alkali solution made by adding TSP(0.1%) & DSP (0.05%)
with DM water.
1.EDTA Ammoniated(40%) : 3- 4%
2.BHEL MAX (inhibitor): 0.15-0.2% w/v
3.BHEL SOL (inhibitor): 0.15-0.2% v/v
4.Hydrazine hydrate: 1000 ppm.
5.Ammonia: for setting pH as 9.5-9.8