Interview and drive test tips
Dedicate channel
GSM/WCDMA
Speech quality
Downlink Dedicate
channel BLER%
Active Set- Currently serving Cell
Measured neighbor- Defined Neighbor
Detected Neighbor- Undefined strong detected server
UARFCN DL- UMTS Absolute radio frequency channel number
Ranges for Radio Parameter
• 1. CPICH EC/No- 0 to -34 dB.
• 2. CPICH RSCP - -15 dBm to -140 dBm for each rake finger.
• 3.Ms TX power – -44 dBm to 60 dBm
• 4. UTRA Carrier RSSI - -20 dBm to -140 dBm for each rake finger.
• 5. SQI MOS - 1 to 5
• 6. SQI - -20dBQ to 30 dBQ
• 7 . SIR - -30 t0 20 db (signal interfere ratio measured on DPCCH )
• 12.2 Kbit/s: 30 dBQ
10.2 Kbit/s: 28 dBQ
7.95 kbit/s: 28 dBQ
7.40 kbit/s: 27 dBQ
6.70 kbit/s: 27 dBQ
5.90 kbit/s: 24 dBQ
5.15 kbit/s: 21 dBQ
4.75 kbit/s: 19 dBQ
Drive Test KPI
• Parameter-
• RSSI – In Between -75 to -85 dbm
• RSCP – In Between -75 to -85 dbm
• Ec /Io – In Between -8 to -10 db
• FER – 1% or 2%
• Ms TX Power - Between -5 to -10
• Soft Handoff – 35% of total time
Use full Plots
• Pilot Pollution –
RSCP >= -85dBm & Ec /Io =< -10 dB
Coverage Limited –
RSCP <= -85dBm & Ec /Io => -10 dB
Poor Radio Condition-
RSCP <= -85dBm & Ec /Io =< -10 dB
Good Coverage –
RSCP >= -85dBm & Ec /Io => -10 dB
3G –voice call testing
SCFT-Single Cell Functional Test
• Before the single site verification, we should only ensure the following
conditions have been met.
– Alarm Check
– Cell Status Check
– Parameter Check
• Alarm Check / Cell Status Check
– The product support engineer will be responsible for checking and resolving
all the alarms. It is important for the optimization engineer prior to any field
test to check with product support engineer regarding any alarms especially
intermittent alarms.
• Parameter Check
– The optimization engineer need to ensure the radio part parameters
configuration list has been achieved. In the list the radio part parameters
includes: the scrambling code, power setting, neighbor cell list, handover
parameter etc.
3G –voice call testing
Test Process
Items: Antenna swapping test
Purpose: Verify the Rx feeder installation is right.
Method: Switch the transmitter from one feeder to another, check the
RSCP changed or not. If no change happened, it means that the feeder
is correct.
Notes: Check the RSCP from scanner
Problem and Solution
Channel quality
index
Modulation
technique
As 64 QAM is
utilized so
less HSDPA
throughput is
less.
Case-2 with high throughput