PREPAREDNESS IN PAKISTAN

POST 2005 EARTHQUAKE

LT GEN (R) FAROOQ AHMAD KHAN,


CHAIRMAN, NDMA

NDMA, PM Sectt, Islamabad 11


NDMA, PM Sectt, Islamabad 22
PAKISTAN’S HAZARDS
VULNERABILITIES

NDMA, PM Sectt, Islamabad 3


DROUGHT OIL SPILLS

FLOODS FOREST FIRES

NDMA, PM Sectt, Islamabad 44


TSUNAMIS TRANSPORTATION
ACCIDENTS

CHEMICAL ACCIDENTS INDUSTRIAL ACCIDENTS

NDMA, PM Sectt, Islamabad 55


LAND SLIDES

NDMA, PM Sectt, Islamabad 66


EARTHQUAKE

NDMA, PM Sectt, Islamabad 77


1935 1905
1803
1833 1934 1897 1950

1945 1819
2001
1737

1881 1941

EARTHQUAKES OF GREATER THAN M=7.5


OCCURRED IN THE REGION
NDMA, PM Sectt, Islamabad 88
EARTHQUAKE IN PAKISTAN – 1892
6.8 MAGNITUDE

Chaman: Balochistan

NDMA, PM Sectt, Islamabad 99


EARTHQUAKE KANGRA 1905
7.8 MAGNITUDE

Himachal Pradesh 19,727

Town Hall Lahore

Before After

NDMA, PM Sectt, Islamabad 10


10
EARTHQUAKE IN QUETTA – 1935
7.7 MAGNITUDE

Railway Station 35,000 deaths

Lytton Road 35,000 deaths

NDMA, PM Sectt, Islamabad 11


11
NDMA, PM Sectt, Islamabad 12
12
SEISMIC ZONES OF PAKISTAN
EARTHQUAKE/ SEISMIC

NDMA, PM Sectt, Islamabad 13


13
TSUNAMIS

NDMA, PM Sectt, Islamabad 14


14
TSUNAMI - 1945
(MAKRAN COAST)
PASNI
21 Nov
21: 56 UTC

Pasni Karachi 8.3


Wave Height 40 ft
Casualties 4000

NDMA, PM Sectt, Islamabad 15


15
EARTHQUAKE 2005

NDMA, PM Sectt, Islamabad 16


16
TOTAL POPULATION : 3.5 M
Gilgit

Kalam 7.6

FAULT LINE 100


KM LONG Pattan

Mingora

Batgram Kaghan

•HUMAN LOSS - Balakot 73,338


GHB
Mzd
Mardan Mansehra

•INJUREDPeshawar Abbotabad - 1,28,309


Bagh
Arja

•FAMILIES AFFECTED- Isd


Rwp
500,000
Rwkt

AREA AFFECTED-30,000 SQ KM
NDMA, PM Sectt, Islamabad 17
17
DAMAGES DUE TO EARTHQUAKE

CATEGORY DESTROYED/ TOTAL


DAMAGED
HOUSES 6,00,152 7,87,583
EDUCATIONAL 7,669 1,1456
INSTITUTES 18,095 STUDENTS DEAD
HEALTH 574 782
INSTITUTES
ROADS 4,429 KMs 1,1963 KMs
(37.02 %)

 MOST OF THE UTILITIES LIKE TELECOM, WATER SUPPLY &


ELECTRICITY WERE OUT OF ORDER
 200 MILLION TONS DEBRIS TO BE MANAGED

NDMA, PM Sectt, Islamabad 18


18
PRE - EARTHQUAKE - 05
INSTITUTIONAL ARRANGEMENTS
 THE RELIEF COMMISSIONERATE SYSTEM IN TERMS OF THE
CALAMITY ACT OF 1958 MEANT FOR PROVIDING RELIEF
ASSISTANCE UNDER THE OLD ARRANGEMENT
 UNDER THE 1973 RULES OF BUSINESS, THE SUBJECT OF
DISASTER RELIEF WAS ASSIGNED TO THE ERC OF THE CABINET
DIVISION
 CRISIS MANAGEMENT CELL OF THE MINISTRY OF INTERIOR WAS
CHARGED WITH THE RESPONSIBILITY OF COORDINATION OF
EMERGENCIES
 THE CIVIL DEFENCE ORGANISATION WAS RESPONSIBLE FOR
MAINTAINING NORMAL LIFE ACTIVITIES/ ITS RESTORATION
WITHOUT DELAY, IF DISTURBED DUE TO ENEMY ACTION OR
NATURAL CALAMITIES

The focus of the above institutional arrangements


remained primarily on post disaster response
NDMA, PM Sectt, Islamabad 19
19
EARTHQUAKE – 2005
AND FORMATION OF FEDERAL RELIEF
COMMISSION (FRC)
MANDATE. “THE “FEDERAL RELIEF COMMISSION” SHALL
CO-ORDINATE AND MONITOR THE RELIEF EFFORTS. HE

SHALL REPORT DIRECTLY TO THE PRIME MINISTER. ALL

AGENCIES CONCERNED WITH THE RELIEF AND

REHABILITATION EFFORTS, INCLUDING CABINET, HEALTH,

INTERIOR, FOREIGN AFFAIRS, COMMUNICATION AND

INFORMATION DIVISIONS SHALL FUNCTION THROUGH HIM

AND FORM A PART OF THE TEAM. ARMED FORCES SHALL

ALSO BE A PART OF THE TEAM”

NDMA, PM Sectt, Islamabad 20


20
DISASTER MANAGEMENT SPECTRUM
• PSYCHO, PHYSICAL TRAUMA
• MULTI-LATERAL
• SOCIO- ECONOMIC FALL OUTS
DIMENSIONS
• DISPLACED PEOPLE RECONST
• ALL SPHERE OF LIFE
• IMPLICATIONS OF
• INSTITUTIONS
DEVASTATION AND
• INFRASTRUCTURE
DESTRUCTION
• SOCIETY, FACILITIES
• EVACUATIONS
• DAMAGE CONTROL
• HEALTH, FOOD, SHELTER

CONSEQUENCE
RESPONSE REC & REHAB
MGMT, RESCUE & MECHANISM
REL •RELIEF LOGISTICS
•RESTORATIONS
•SOCIAL/CIVIC ORDER
•REVIVAL OF SYSTEMS
•BUILDING CAPACITIES

PREP & MITIGATION


• INSTITUTION AND LEGAL ARRANGEMENTS
• HAZARD AND VULNERABILITY ASSESSMENT
• TRAINING, EDUCATION AND AWARENESS
• MULTIHAZARD EARLY WARNING SYSTEM
• EMERGENCY RESPONSE SYSTEM
NDMA, PM Sectt, Islamabad • CAPACTIY DEVELOPMENT 21
21
COORDINATION MECHANISM
FEDERAL RELIEF COMMISSIONER
STRATEGIC
MILITARY CIVILIAN
COMPONENT
LEADERS COMPONENT
GROUP
ARMY PAF UN/US/NATO MINISTRIES

FMNS LOG AVN MED INTL ORGs/NGOs GOVT DEPTS


WB/ IDB/
ISPR ENGRS PROVINCES
ADB /IMF

PUBLIC/VOLUNTEERS FOREIGN SP PIA, RAILWAYS, NLC,


WAPDA, UTILITY STORES,
EXPATRIATES PTCL, SCO, ERC, NCMC

PHILANTHROPIST

NDMA, PM Sectt, Islamabad 22


22
DOMESTIC
FOREIGN IOs/NGOs
SOURCES
National
COUNTRIES
Response -
BY AIR/RD/TRAIN
Concept
Base Base
Base

FWD BASES

BY AIR/HEL/ROAD

DISTRIBUTION POINTS HELs, ANIMAL


TRANSPORT
NODES NODES NODES NODES NODES NODES NODES MAN PACK ,
LIGHT VEHICLES
•FORWARD TO REAR ------ HIGHER TO LOWER
•HUTMENTS, HAMLETS, HOUSES LEVEL OP
NDMA, PM Sectt, Islamabad 23
23
RESCUE, RELIEF & RECOVERY
CLUSTER APPROACH

HEALTH -- WHO
HEALTH
SHELTER -- IOM
FOOD
LOGISTICS -- WFP

EARLY RECOVERY -- UNDP LOGISTICS


CAMP MANAGEMENT - UNHCR
EDUCATION
WATER, SANITATION- UNICEF
SAFETY, SECURITY -UNDSS PROTECTION
FOOD/NUTRITION
WFP, UNICEF SHELTERS
CAMP MANAGEMENT
PROTECTION, EDUCATION
UNICEF

INFO, TELECOMM INFRASTRUCTURE


WFP, UNICEF
NDMA, PM Sectt, Islamabad 24
LESSONS LEARNT FROM EQ 2005

NDMA, PM Sectt, Islamabad 25


LESSONS LEARNT FROM EQ 2005

 MOVE BEYOND ORGANIZATIONAL BEHAVIORS AND EGOS

 CREATE INTER AGENCIES & MULTI-ORGANIZATIONAL

LIAISON MECHANISM

 DE-CONFLICTING CONSTITUTIONAL AND INSTITUTIONAL

DOMAINS AND SPHERES

 HARMONIZE POLICIES AND RULES OF OFFICIAL BUSINESS

 ONE ROOF/ONE WINDOW OPERATION AT STRAT /

OPERATIONAL LEVELS

NDMA, PM Sectt, Islamabad 26


LESSONS LEARNT FROM EQ 2005

NEED FOR A PERMANENT

LEAN FOCUSED
STRUCTURE APPROACH

FLEXIBLE CAPACITIES
NDMA, PM Sectt, Islamabad 27
LESSONS LEARNT FROM EQ 2005

DISSEMINATION OF INFORMATION

 CREATE STRONG LINK BETWEEN MEDIA,

AFFECTEES AND THE WORLD COMMUNITY

 THEIR JOB BE FACILITATED BY SHARING

DATA AND INGRAINING THEM INTO THE

RELIEF ORGANIZATION

NDMA, PM Sectt, Islamabad 28


LESSONS LEARNT FROM EQ 2005

QUICK & SMOOTH RESPONSE


 HAVE SOPs

 ESTABLISH COORDINATION CENTERS

 SHARE INFORMATION

 USE COMMON DATABASE

 TRAIN SEARCH AND RESCUE TEAMS

(REDUCING TIME OF EXECUTION CAN REDUCE THE COST OF


MANAGING A CATASTROPHE)

NDMA, PM Sectt, Islamabad 29


LESSONS LEARNT FROM EQ 2005

 CAPACITY BUILDING IN S&R.


CAPACITY BUILDING THROUGH
EXPERTISE, EQUIPMENT & TRAINING
FOR SEARCH, RESCUE AND DEBRIS
REMOVAL TASKS

 PROMPT DECISION MAKING.


SMOOTH FIELD OPERATIONS NEED
CONTINUOUS ANALYSIS OF
IMPEDIMENTS AND PROMPT DECISION
MAKING TO ADJUST MICRO
STRATEGIES
NDMA, PM Sectt, Islamabad 30
LESSONS LEARNT FROM EQ 2005

DEPENDENCY SYNDROME
 UPLIFT COMMUNITIES FROM
CYCLE OF DEPENDENCY INTO
SELF-RELIANCE
 REGENERATION OF SOCIAL
AND CULTURAL COHESION

NDMA, PM Sectt, Islamabad 31


LESSONS LEARNT FROM EQ 2005

WIDE RANGING DISASTER MANAGEMENT

STRATEGY
 LIKELY SCENARIOS

 DELINEATION OF RESPONSIBILITIES

 CAPACITY BUILDING GUIDELINES

COMMUNITY INVOLVEMENT. TO MAKE RELIEF


PROCESS SELF-SUSTAINING LOCAL COMMUNITIES,

NOTABLES, POLITICAL LEADERS AND LOCAL GOVT

REPRESENTATIVES BE DOVETAILED

NDMA, PM Sectt, Islamabad 32


POST EQ 2005 LEGAL AND
INSTITUTIONAL ARRANGEMENTS

NDMA, PM Sectt, Islamabad 33


POST EQ 2005 LEGAL AND
INSTITUTIONAL ARRANGEMENTS

NATIONAL DISASTER MANAGEMENT ORDINANCE


2006/7
 PROMULGATED IN DEC 2006

 CALLS FOR ESTABLISHMENT OF DM ENTITIES AT


FEDERAL, PROVINCIAL AND DISTRICT LEVELS

 NDMC HEADED BY THE PM (POLICY MAKING BODY) AND


NDMA AS EXECUTIVE ARM

 NDMA RESPONSIBLE TO MANAGE COMPLETE SPECTRUM


OF DM AT NATIONAL LEVEL

 FOR DM, ALL AGENCIES - FOREIGN OR DOMESTIC - SHALL


WORK THROUGH NDMA
NDMA, PM Sectt, Islamabad 34
POST EQ 2005 LEGAL AND
INSTITUTIONAL ARRANGEMENTS
DIFFERENT TIERS OF THE SYSTEM

National Disaster Management Commission (NDMC)

National Disaster Provincial/ Regional


Management Authority (NDMA) Disaster Management Commission (PDMCs)

Federal Ministries,
Departments, Technical Agencies Provincial/ Regional
Disaster Management Authorities (PDMAs)

Media, Banks, Insurance &


Private sector

District/ Municipal
Disaster Management Authorities (DDMAs)
Donors, UN, NGOs, Media

Tehsil Structures

NDMA, PM Sectt, Islamabad 35


35
POST EQ 2005 LEGAL AND
INSTITUTIONAL ARRANGEMENTS
 NDMC

 MEMBERS: PRIME MINISTER, OPPOSITION LEADER, PROVINCIAL


CHIEF MINISTERS AND CIVIL SOCIETY REPRESENTATIVES
 FUNCTIONS

LAYS DOWN POLICIES AT NATIONAL LEVEL


APPROVES NATIONAL DM FRAMEWORK AND PLAN
ENSURE INTEGRATED NATIONAL RESPONSE
 NDMA (EXECUTIVE ARM OF NDMC)

 SECRETARIAT TO NDMC
 MANAGES COMPLETE SPECTRUM OF DRM AT NATIONAL LEVEL
 MAP ALL HAZARDS IN THE COUNTRY
 ORGANIZE TRAINING AND AWARENESS RAISING ACTIVITIES
 ACT AS GOP’s FOCAL POINT FOR DEALING WITH NATIONAL AND
INTERNATIONAL COMMUNITY
NDMA, PM Sectt, Islamabad 36
36
POST EQ 2005 LEGAL AND
INSTITUTIONAL ARRANGEMENTS
NDMA
ORGANOGRAM

Chairman

SO

Recovery &
Dir Ops/ Aviation Dir HR & Dir Finance & Ops Co-opted Rehabilitation/
Coord Prep Wing Procurement Accounts Wing Members Re-const
Wing

SUMMARY Military Ops


Wing Centre
•Officers - 26
•Supporting Staff - 85
Total - 111 Avn Med Log Engrs Ops

NDMA, PM Sectt, Islamabad 37


37
POST EQ 2005 LEGAL AND
INSTITUTIONAL ARRANGEMENTS
PDMC
 MEMBERS. CHIEF MINISTER, LEADER OF OPPOSITION & A
NOMINEE OF THE LEADER OF OPPOSITION

 FUNCTIONS. SAME FUNCTIONS AT PROVINCIAL LEVEL AS


OF NDMC AT NATIONAL LEVEL

PDMA

 SECRETARIAT OF PDMC

 DEALS WITH WHOLE SPECTRUM OF DRM AT PROVINCIAL


LEVEL

 PERFORMS SAME FUNCTIONS AT PROVINCIAL LEVEL AS OF


NDMA AT NATIONAL LEVEL
NDMA, PM Sectt, Islamabad 38
POST EQ 2005 LEGAL AND
INSTITUTIONAL ARRANGEMENTS

DDMA

 ACTS AS FIRST RESPONDER

 DEALS WITH WHOLE SPECTRUM OF DRM AT DISTRICT


LEVEL

 IMPLEMENT NATIONAL / PROVINCIAL POLICIES AND


STRATEGIES AT DISTRICT LEVEL

 MOBILIZES RESOURCES AT DISTRICT LEVEL

 GIVE DIRECTIONS/GUIDELINES TO DISTRICT DEPARTMENTS


/ ORGANIZATIONS FOR PREVENTION AND MITIGATION OF
DISASTERS

NDMA, PM Sectt, Islamabad 39


POST EQ 2005 LEGAL AND
INSTITUTIONAL ARRANGEMENTS
NATIONAL DISASTER RISK MANAGEMENT
FRAMEWORK
NINE PRIORITY AREAS IDENTIFIED
 ESTABLISH AND STRENGTHEN (INSTITUTIONS AND
CAPACITIES)
 NATIONAL RISK ASSESSMENT
 TRAINING
 AWARENESS
 MULTI HAZARD EWS
 MAINSTREAMING DRR INTO DEVELOPMENT
 COMMUNITY BASED DRR INITIATIVES
 EMERGENCY RESPONSE SYSTEMS
 CAPACITY DEVELOPMENT FOR POST DISASTER
RECOVERY

NDMA, PM Sectt, Islamabad 40


POST EQ 2005 LEGAL AND
INSTITUTIONAL ARRANGEMENTS
NDMF
 TO BE UTILIZED TO DEAL WITH WHOLE SPECTRUM OF
DISASTER MANAGEMENT ACTIVITIES
 PROVINCIAL GOVERNMENTS ARE ALSO REQUIRED TO
ESTABLISH SIMILAR FUNDS UNDER THE RESPECTIVE
PDMAS

NIDM
 CENTRE OF EXCELLENCE FOR DISASTER MANAGEMENT
 WILL CATER FOR DOMESTIC / REGIONAL TRAINING AND
RESEARCH NEEDS
 DRM COURSES STARTED UNDER THE NIDM WHILE
INFRASTRUCTURAL DEVELOPMENT OF THE INSTITUTE
WILL BE INITIATED SHORTLY
NDMA, PM Sectt, Islamabad 41
KEY DRM INITIATIVES

 NATIONAL CAPACITY BUILDING FOR

DRM PROJECT

 HRD FOR DISASTER RISK MANAGEMENT

 DRM PLANNING

 DRR MAINSTREAMING

 COMMUNITY BASED DISASTER RISK MANAGEMENT

ACTIVITIES

 RESPONSE PROJECT – PEER & USAR

NDMA, PM Sectt, Islamabad 42


KEY DRM INITIATIVES

 NATIONAL ACTION PLAN FOR 2009-10


 FULL OPERATIONALIZATION OF PDMAS AND DDMAS
IN 50 HIGH RISK DISTRICTS
 COMPLETION OF NATIONAL RISK ASSESSMENT
EXERCISE
 RISK SENSITIVE DEVELOPMENT POLICY AND
PLANNING
 COMMUNITY BASED MITIGATION PROGRAMMES IN 50
DISTRICTS
 HUMAN RESOURCE DEVELOPMENT IN DRM
 RAISING PUBLIC AWARENESS
 EMERGENCY RESPONSE CAPACITY DEVELOPMENT

NDMA, PM Sectt, Islamabad 43


KEY DRM INITIATIVES

Contingency Plans

Winter Contingency Plan

Cyclone Contingency Plan (for Karachi City)

Monsoon Contingency Plan 2007-2008

Marine Oil/Chemical Spill Contingency Plan

Industrial & Chemical Accidents Contingency Plan (advanced


stage of finalization)

Technical Contingency Plan

NDMA, PM Sectt, Islamabad 44


KEY DRM INITIATIVES

COMPOSITE RISK ASSESSMENT PROJECT


 MAPPING OF HAZARD RISKS IN PAKISTAN

 DEVELOP GUIDELINES & STANDARDS FOR RESPONSE

 EQUIP NATIONAL AND PROVINCIAL EMERGENCY


OPERATION CENTRES WITH ESSENTIAL IT EQUIPMENT

 PREPARE NATIONAL DISASTER RESPONSE PLAN,


DEVELOP DEPARTMENTAL SOPS FOR DISASTER
RESPONSE

 DEVELOP AN INFORMATION MANAGEMENT SYSTEM


FOR DISASTER RESPONSE

NDMA, PM Sectt, Islamabad 45


CHALLENGES

POLITICAL ATTENTION
RESOURCE CONSTRAINTS AND COMPETING
DEMANDS
LACK OF AWARENESS AND PROFESSIONAL
EXPERTISE IN THE FIELD OF DRM
WAVERING COMMITMENTS FROM THE DONOR
AGENCIES

NDMA, PM Sectt, Islamabad 46


THANK YOU

NDMA, PM Sectt, Islamabad 47