 Currently Peña Negra field produces 3240 BOPDx160 BWPDx40.103 MMScfd,


with artificial lifting system Gas Lift (+/- 90% of wells) 17,355 MMScfd.
(Average Aug 2019)

OBJECTIVES

 Build an integral model of production (WELL & SURFACE) - Peña Negra


OffShore field.
 Diagnose current operating conditions of production based on the
performance wells and networks (HPG, LPG, GFS and MPH pipelines).
 Model and evaluate scenarios to find improvement opportunities.

Project detail review report : “ Simulación Integral Pena Negra - Informe Final Sep-2019” 2
PRODUCTION FORUM

DESARROLLO DEL PROYECTO

Scen.
Description
 Well Test PVTFlexm:
 Completion schematic PVT Model Sce 1
Perform mechanical cleaning
 History well of LPG & GFS Pipelines

 Field report WellFlo: Sce 2


Compressor PN8#2 Use to
Gas Sales
 Production charts Flowing & CGL Wells
LPG pipeline laying PN2-
 BHP Sce 3
PN7
 PVT analysis Macro GLINT:
GFS pipeline laying PN12-
 Surface P&ID IGL Wells Sce 4
PN4

 Pipeline data Sce 5 Activate Flare PN1 Platform


 Compressors data
 History of operating
conditions Adjustment LPG Network
ReO: SIM values inside operating range Adjustment HPG Network
Error 7%:
Network Model

Project detail review report : “ Simulación Integral Pena Negra - Informe Final Sep-2019” 3
PRODUCTION FORUM
Tubería Factor D
P_GFS_RED-_GG-----NN_55_1 0.3
P_LPG_RED-_PN09-PN02_55_1 0.3958
P_LPG_RED-_Z------GG_55_1 0.45
P_GFS_RED-_NN---BPN1_55_1 0.47
P_LPG_RED-_HH------Z_55_1 0.55
P_LPG_RED-_PN02---KK_55_1 0.68
P_LPG_RED-_KK------Z_55_1 0.74
P_GFS_RED-_PN04---DD_32_1 0.75
P_GFS_RED-_PN04-REST_55_1 0.75
P_LPG_RED-_PN05----R_55_1 0.75
P_GFS_RED-_Z------GG_55_1 0.8
P_GFS_RED-_Z------GG_55_2 0.8
P_GFS_RED-_Z------GG_55_3 0.8
P_GFS_RED-_Z------GG_55_4 0.8
P_LPG_RED-_LL------Z_55_1 0.9
P_LPG_RED-_SS---PN05_55_1 0.9
P_LPG_RED-_Z------LL_55_1 0.9
Sc

Description Result
Perform mechanical cleaning of Recommended: Reduces Back Pressure in the LPG network. Estimated
Scn 1
LPG & GFS Pipelines production increase 3.0% . Evaluate profitability.
Compressor PN8#2 . Use to Gas Increase gas rate to sales around the field. Estimated +/- 1.200 MMscfd.
Scn 2
Sales Evaluate profitability.
Recommended: Reduces Back Pressure in the LPG network. Estimated
Scn 3 LPG pipeline laying PN2-PN7
production increase 1.5% . Evaluate profitability.
Allows to increase the global flow of sales gas by 1.500 MMscfd. In case
Scn 4 GFS pipeline laying PN12-PN4 of execution, recommended diameter 3 1/2 to GFS Pipeline PN12-PN4.
Evaluate profitability.
Recommended: In case of contingency in PN1, avoid differ 6%
Scn 5 Activate Flare PN1 Platform
production. Evaluate profitability.

Project detail review report : “ Simulación Integral Pena Negra - Informe Final Sep-2019” 4
PRODUCTION FORUM

RECOMMENDATIONS

 According to the evaluation and diagnosis wells, it is recommended to prioritize


optimization work at the injection time in the wells with low efficiency and High
K factor, perform inspections well with Plunger Lift System, change uncalibrated
valves and installation valves.
 As secondary priority recommendations, optimization by changing cycles,
installing plunger lift in deep wells with high FF value (Fall Back) and installing
pilot valves in wells with conventional installation.
 Perform mechanical cleaning of pipes in surface networks, according to the list of
pipe obstruction.
 Evaluate the profitability of the technically recommended scenarios, to make the
decision to execute.
 Automate the well production system to record and control critical parameters
for well production. (Gas Injection, Production Fluid & Other parameters)
 Continue simulation project of networks in other fields (LT,PV,SP,CH,ONSHORE)
Project detail review report : “ Simulación Integral Pena Negra - Informe Final Sep-2019” 5