Project detail review report : “ Simulación Integral Pena Negra - Informe Final Sep-2019” 2
PRODUCTION FORUM
Scen.
Description
Well Test PVTFlexm:
Completion schematic PVT Model Sce 1
Perform mechanical cleaning
History well of LPG & GFS Pipelines
Project detail review report : “ Simulación Integral Pena Negra - Informe Final Sep-2019” 3
PRODUCTION FORUM
Tubería Factor D
P_GFS_RED-_GG-----NN_55_1 0.3
P_LPG_RED-_PN09-PN02_55_1 0.3958
P_LPG_RED-_Z------GG_55_1 0.45
P_GFS_RED-_NN---BPN1_55_1 0.47
P_LPG_RED-_HH------Z_55_1 0.55
P_LPG_RED-_PN02---KK_55_1 0.68
P_LPG_RED-_KK------Z_55_1 0.74
P_GFS_RED-_PN04---DD_32_1 0.75
P_GFS_RED-_PN04-REST_55_1 0.75
P_LPG_RED-_PN05----R_55_1 0.75
P_GFS_RED-_Z------GG_55_1 0.8
P_GFS_RED-_Z------GG_55_2 0.8
P_GFS_RED-_Z------GG_55_3 0.8
P_GFS_RED-_Z------GG_55_4 0.8
P_LPG_RED-_LL------Z_55_1 0.9
P_LPG_RED-_SS---PN05_55_1 0.9
P_LPG_RED-_Z------LL_55_1 0.9
Sc
Description Result
Perform mechanical cleaning of Recommended: Reduces Back Pressure in the LPG network. Estimated
Scn 1
LPG & GFS Pipelines production increase 3.0% . Evaluate profitability.
Compressor PN8#2 . Use to Gas Increase gas rate to sales around the field. Estimated +/- 1.200 MMscfd.
Scn 2
Sales Evaluate profitability.
Recommended: Reduces Back Pressure in the LPG network. Estimated
Scn 3 LPG pipeline laying PN2-PN7
production increase 1.5% . Evaluate profitability.
Allows to increase the global flow of sales gas by 1.500 MMscfd. In case
Scn 4 GFS pipeline laying PN12-PN4 of execution, recommended diameter 3 1/2 to GFS Pipeline PN12-PN4.
Evaluate profitability.
Recommended: In case of contingency in PN1, avoid differ 6%
Scn 5 Activate Flare PN1 Platform
production. Evaluate profitability.
Project detail review report : “ Simulación Integral Pena Negra - Informe Final Sep-2019” 4
PRODUCTION FORUM