• Generation
Total Installed Capacity –
228.7 GW (As on 30.09.13)
NR
NER
ER
WR
ANDAMA
NICOBA
K
SH
AD
WE
N
R
&
EP
Evolution of National Grid
National
Grid
Interconnecting
Regional Grids Regional Grids
with ATS of with HVDC
Central
Generation 2000 onwards
State 1990s
Grids by
SEBs 1970-80s (Paradigm Shift from self
sufficiency at Regional level
concept to National level)
1950-60’s IR Capacity (MW)
100000
Local 27750 66400
14100
1950’s 50000 5100
0
IX Plan X Plan XI Plan XII Plan
August 2006
Five Regional Grids North synchronized
Two Frequencies
With Central Grid
March 2003
West synchronized NEW Grid
With East & Northeast
Central Grid
MERGING
North OF
East MARKETS
West
Northeast
South
EASTER
N
REGION 220kV : 1,42,536 ckm
HVDC Bipole (±500kV) : 9,432 ckms
N
REGION
WESTE
RNREGI
ON
Transformation capacity (MVA/MW)
HVAC :474,091 MVA
2
SOUTH
(POWERGRID : 170,000MVA, 171 S/s)
ERN
REGION
− 765kV : 56,500 MVA
− 400kV : 170,397 MVA
− 220kV : 247,194 MVA
HVDC : 13,500 MW
FSC – 33nos., TCSC – 6 nos.
Inter-Regional Capacity - Existing
Present IR Capacity – 31,850 MW
NR
6,220 MW NER
14,230 MW
1,260 MW
WR
WR ER
4,390 MW
1,520 MW
3,630 MW
SR
6
Players in the Power Sector
Generators
Central/State GENCO, IPP, Captive
CTU
System
Inter-State Trans. system,
Open Access Operator
STU
Power
Intra-State Tr./Sub-tr. system
Exchange
DISCOMS Traders
Consumers
Industries, household,
agriculture
Role of POWERGRID as CTU
• To undertake transmission of electricity through ISTS
NLDC:
Ensure integrated operation of
National Grid
RLDC:
Ensure integrated operation of
5 Regional Grid
SLDC:
31 Ensure integrated operation of State
Grid
NATIONAL GRID - FUTURE
Projected Power Scenario
NEED OF NEW INITIATIVES IN TRANSMISSION
205GW
Ahmedabad
Mumbai &
Pune
Hyderabad
Bangalore &
Chennai
BHUTAN
- Madhya Pradesh:16000 MW
Partabpur
RAPP Jaipur Guwahati
Lucknow CHICKEN
NECK NER
AR
Patna
MM
Sasan DESH
Mudra ER
AN
Vindhyachal
MY
Gandhinagar
Pipavav
Indore Bhopal Korba
Kolkata
Northern Himalayan region
WR Akaltara Talcher/Ib Valley
Tarapur
Raipur
Lara
Darlipali Bhubaneswar Coal
Mumbai
Vizag Coastal based
Girye Simhadri
Tadri SR
Hyderabad
LEGEND
- Andhra Pradesh: 24000 MW
Kaiga Krishnapatnam
Ennore
Coal Based generation - Tamil Nadu : 10000 MW
Bangalore Hydro Based Generation
Mangalore
Kozhikode
Chennai
South Madras Coastal Generation
Nuclear generation
- Gujarat : 11000 MW
Cuddalore Ultra-Mega Generation
Load Centre Based Generation
Kayamkulam Load-Centre
Thiruvananthapuram
Kudankulam
Future Generation Scenario (5-6 Years)
12th Plan (2012-17) Capacity Addition : 88 GW
• Thermal – 72 GW
• Hydro – 11 GW
• Nuclear – 6 GW
• Wind – 30 GW
• Solar – 10 GW
• Small Hydro – 2 GW
Expansion Programme – 12th Plan
66000
80000
60000
40000 27750
20000
0
2011-12 By 2016-17
NR 6000 MW
10200 MW NER
5800 MW
WR ER 1600 MW
8400 MW
6400 MW
SR
National Grid - XII Plan addition – 38,400 MW
National Grid - Total by XII Plan – 66,000 MW
17
TECHNOLOGY
Pursuing Higher Voltage Levels
World’s Highest
World’s longest Voltage level – Test station
multi-terminal Charged in Oct.’12
HVDC to harness renewable
Hydro Power from North-east
765kV D/C
Voltage - AC
(kV) 1200kV
800kV
765kV HVDC
500kV
HVDC
400kV
220kV
GIS substation
High Power Intensity Corridor
ROAD MAP FOR INDIAN POWER SYSTEM
RoW Capacity MW/m
(m) (MW) RoW
400kV S/c 52 500 9.6
400kV D/c 46 1000 21.8
176 69 m
m
Implementing +800kV HVDC Bipole Link
World’s longest
multi-terminal
±800 kV HVDC
Biswanath
under Agra Chariali
implementation 2000 km
from Biswanath
Chariali, North-
Eastern Region to
Agra, Northern
Region.
Shall transmit
power to the tune
of 6000-8000 MW.
Indigenous Development of 1200kV UHVAC
Connectivity
– Application Received : 188no. , 176,300MW
– Granted : 84 No., 74,400 MW
28
CROSS-COUNTRY INTERCONNECTION
Linkages with
Neighboring
Countries
INTERCONNECTION BETWEEN INDIA AND BANGLADESH GRIDS
JAYPURHAT BARAPUKURIA
MALDA
KHEJURIA BOGRA
KAHALGAON
FARRAKA NAOGAON
NIAMATPUR BOGRA
CH. NAWABGANJ SOUTH
DHULIAN BANGLADESH
MADHOPUR
RAGHUNATHGANJ RAJSHAHI NATORE
SIRAJGANJ
SAGARDIGHI
BAHARAMPUR SHAHJAD
PUR
ISHURDI PABNA
DURGAPUR
BAHARAMPUR
GOKARNA (400 KV)
BAGHABARI
400kV D/c GHORASAL
BHERAMARA
INDIA
BOTTAIL FARIDPUR
KATWA BAKRESHWAR
LEGEND
THE PROJECT
400 kV
230 kV
132 kV
KOLAGHAT KHULNA
Existing
SUBHASGRAM
JEERAT (SOUTH) 31 Under Constr. / Future
India - Bhutan : Interconnection
32
India - Nepal : Interconnection
33
India – Sri Lanka Interconnection
Madurai Madurai-New
48 Kms
130 Kms
120 Kms
Panaikulam
Thirukketiswaram *
Taliamannar
110 Kms