Sei sulla pagina 1di 13

PREENTATION ON DATA EXCHANGE AND

EXPERIENCE SHARING OF BLAST FURNACE

Manoj kumar, DGM, BF(O)


Anish kumar, AM, BF(O)
THE 4161 m3 BF IN ISP SAIL

 Single large blast furnace in ISP


blown in Nov 2014 (WV – 3551 m3) No reportable accident in the
entire Blast Furnace Complex
since commissioning
 Sinter Plant: 2x204 m2 machines
(SP1 started Dec 2012;
SP2 started Oct 2013)
Highest Productivity:
 Ore Handling Plant comprises 6 beds 2.14 in Nov 2018
[320 m x 32 m x 12 m]

 Coke Ovens:
Battery 10 → 4.5 m tall x 78 ovens Lowest Monthly Coke Rate:
[started in Aug 2010] 371 Kg/THM in Nov 2018
Battery 11 → 7.0 m tall x 74 ovens
[started in Feb 2013]

 As on date over 6.2 MT of hot metal has been Daily highest CDI rate of
produced. 155 Kg/THM in March 2018
1.3 Furnace proper

Stock line
detector
Off take
Top gas ignition
lance

Above burden Profile meter


probe Top
con
e
Distribution chute thro Shaft gas Probe
at

Armor plate

shaf
t

Bustle pipe

Stave cooling system bell


y Tuyere stock
bos
Furnace shell h
tuye
re Refractories
Tower structure
hear
th
Under hearth cooling
system
1.4 IISCO PROFILE
* Stock Line
A 1,570
A: 118m3

9600

17,450
B: 2248m3 B
WORKING VOLUME : 3551 ㎥ (A+B+C+D+E)

USEFUL VOLUME : 4161 ㎥ (A+B+C+D+E+F)

TOTAL VOLUME : 4597 ㎥ (A+B+C+D+E+F+G)


80.56
4
15,600
C: 478m3 2,500
C

74.876 D
D: 620m3 3,700

E CL OF TUYERE
E: 87m3 13,600
7,800
F: 610m3 4,200 F
CL OF TAP HOLE
G: 436m3 3,000 G
HOT METAL PRODUCTION (tonnes)
COKE RATE (Kg/THM)
NUT COKE RATE (Kg/THM)
CDI RATE(kg/THM)
SLAG RATE(Kg/THM)
BF PRODUCTIVITY (T/m3/DAY)
HBT(o C)
IN PURSUIT OF EXCELLENCE

 We are well on our way to exceed rated monthly target of 7700 TPD

 Although the total fuel rate have been lower than 535 Kg/THM, monthly
CDI rate of 150 Kg/THM or better remains our next challenge

 CDQ fines utilization through the CDI route is being developed as a


techno-economic advantage

 Consistency in base mix blending is higher and piling and bedding


models are being used to maintain input quality

 We have started a project to use the under size from Centre coke
screen to be again used as surface coke.

72nd ATM / 56th NMD - 2018 November 14-16, 2018, Kolkata