BEST PRACTICES IN
QUALITY ASSURANCE
&
INSPECTION
IN
NTPC
QUALITY ASSURANCE & INSPECTION
1975-1980 1980-1990
1995-2004
1990-1995
AMBITIOUS GENERATION
ENTRY INTO BULK O&M AND CAPACITY ADDITION
PHASE OF PLANTS. PLAN.
STRONG BASE OF FQA STRONG BASE OF FQA,
RIOs & CQA
QUALITY ASSURANCE & INSPECTION
QUALITY ASSURANCE
CONCEPTS
QUALITY ASSURANCE & INSPECTION
QUALITY
“QUALITY
IS
FITNESS
FOR
USE”
QUALITY ASSURANCE & INSPECTION
QUALITY
INSPECTION
QUALITY CONTROL
“THOSE QUALITY ASSURANCE
ACTIONS WHICH PROVIDE A
MEAN TO CONTROL AND
MEASURE THE
CHARACTERISTICS OF AN
ITEM, PROCESS OR FACILITY
TO ESTABLISHED
REQUIREMENTS.”
QUALITY ASSURANCE & INSPECTION
QUALITY ASSURANCE
QUALITY SYSTEM
QUALITY ASSURANCE & INSPECTION
CORPORATE
QUALITY
ASSURANCE
FIELD REGIONAL
QUALITY INSPECTION
ASSURANCE OFFICES
QUALITY ASSURANCE & INSPECTION
RELIBILITY CHAIN
“ANY CHAIN IS AS STRONG AS THE
WEAKEST LINK “
• LINKS OF THE CHAIN ARE :
• ENGINEERING
• QUALITY SYSTEMS
• CONTRACTUAL PROVISIONS
• INSPECTION
• FIELD QUALITY
- IN ERECTION / CONSTRUCTION
- IN OPERATION & MAINTENANCE
QUALITY ASSURANCE & INSPECTION
UNIQUE FEATURES
SYSTEMS’ APPROACH
UNIQUE FEATURES
• PRE-AWARD TIE-UPS :
• QA REQUIREMENTS IN TECHNICAL
SPECIFICATION.
• EVALUATION OF BIDS w.r.t. QA
REQUIREMENTS.
• TIE-UP OF QA REQUIREMENTS DURING
PRE-AWARD.
• FINALISATION OF LIST OF ITEMS
REQUIRING QP AND SUB-VENDOR
APPROVAL.
QUALITY ASSURANCE & INSPECTION
BID EVALUATION
C BID EVALUATION REPORT
E
N
G
G
PRE-AWARD AGREEMENT (I) LIST OF ITEMS
WITH IDENTIFIED VENDORS/ REQUIRING QP AND
SUB-VENDOR APPROVAL
Q
MAIN CONTRACTORS
(II) QA&I CO-ORDINATION
PROCEDURE
FEEDBACK OF SUB-
VENDOR PERFORMANCE (III) SUB-VENDOR
BY RIO / SITE ASSESSMENT PROCEDURE TO CS
(IV) QUALITY AUDIT &
REQUIREMENTS FORM
ANALYSIS OF PREVIOUS
A
NON-CONFORMITIES (NCRs) PART
OF
LOA
QUALITY ASSURANCE & INSPECTION
UNIQUE FEATURES
P0ST-AWARD
C
FOR BOIs
-IN-PROCESS CHECKS
-FINAL INSPECTION
SUB-VENDOR ASSESSMENT :
DETAILS FROM MAIN
Q ACCEPTANCE / REJECTION TO
MAIN CONTRACTOR
CONTRACTOR
ERECTION DEVIATION
A 1. MAIN CONTRACTOR
DISPOSITIONING 2. FQA
QUALITY ASSURANCE & INSPECTION
M/C N
MANUFACTURER/ MAIN-SUPPLIER
LEGEND: * RECORDS, INDENTIFIED WITH “TICK” ( ) SHALL BE DOC. NO.: REV…… CAT…..
ESSENTIALLY INCLUDED BY SUPPLIER IN QA DOCUMENTATION.
** M: MANUFACTURER/SUB-SUPPLIER
C: SUPPLIER/NOMINATED INSPECTION AGENCY, N: NTPC
MANUFACTURER/ MAIN-SUPPLIER P: PERFORM W: WITNESS AND V: VERIFICATION. AS APPROPRIATE, FOR
SUB-SUPPLIER CHP: NTPC SHALL IDENTIFIED IN COLUM “N” NTPC
SIGNATURE USE REVIEWED BY APPROVED BY APPROVAL SEAL
FORMAT NO.: QS-01-QAI-P-09/F1-R0 1/1 ENGG. DIV./QA&I
QUALITY ASSURANCE & INSPECTION
1. 2. 3. 4. 5. 6. 7. 8. 9. D* 10.
CERTIFICATE OF CONFORMANCE
(NAM E & ADDRESS OF T HE M AIN SUPPLIER)
MAIN-
SUPPLIER’S
M/S....................................................................................................................................
LOGO .......
...........................................................................................................................................
.....
CERTIFICATE OF CONFORMANCE
Sl. Descripti on Specification Make NTPC DRG. Qty Bal. BBU Identi fi-
No. of item/ Size/Type/ NO. / GFR. Offe Qty Ref. cation
Equi pment Rating DRG. NO. red Mark
Signature :
Name :
Design :
Note:
(For NTPC use) Sl. BBU No. ITEM DESCRIPTION / TESTS QUANTITY Unit Cat REFERENCE REMARKS/ UNDERTAKING
I/C No. No. As in Already Offered Insp DOCUMENT
BBU Supplied (*)
QP No. 1. Material internally inspected, in line with
NTPC QP and found satisfactory.
2 All Reference Documents including latest
revisions of NTPC approved QP /Drawing /
Drg/Data sheet BBU in original are available and shall be
made available during inspection.
No.
3 All stage inspection requirements if applicable
has been cleared and relevant CHP’s are
available.
4 (Applicable for bought out items) Inspection by
Main supplier is completed and material is
cleared.
OR
Joint inspection along with Main supplier
proposed.
4. Type test Approval from NTPC Engg.
/Obtained / Pending / Not available.
5. Material shall not be Despatched without
Despatch clearance from
SIGNATURE:_____________________
NAME :_____________________
DESIGNATION :__________________
Insp. Cat (*) : Enter 0 – for Stage Insp. 1 – for Final Physical Insp. 2 – for Review of MTC’s based on QP 3 – for Non-QP cases based on COC.
QUALITY ASSURANCE & INSPECTION
CHP REPORT
RI O --- ---- --
NATIONAL THERMAL POWER CORPORATION LTD
CONTRACT_NO:
Pa g e ---- PLACE
INSPE CTION DATE CHP_NO: - ---- -
I/C NO DESCRI PTI ON OF MATERIAL / QU ANIT IT Y QU ANIT IT Y QU ARANTI NE UNITT DISPOS REF ERANCE REMARKS
SL TEST OF F ERED ACCEPT ED D/R EJECTED AL DOCUMENT S
NO QT Y CODE
NAME :
BEST PRACTICES
• SUB-VENDOR ASSESSMENT SYSTEM
BEST PRACTICES
• STANDARDISATION
BEST PRACTICES
SYSTEM OF FEEDBACK
• THE FEEDBACK OF INSPECTION IS USED
FOR UPGRADATION OF QA REQUIREMENTS
AND TIE-UPS FOR FUTURE PROJECTS
• DEVIATION DISPOSITIONING DURING
MANUFACTURING / ERECTION AT SITE
NOT ONLY ENSURES PROPER RESOLUTION
TO THE PROBLEM BUT ALSO PROVIDES
FEEDBACK FOR FUTURE WORK.
• FEEDBACK FROM OPERATING UNITS IS
ALSO ANALYSED AND TAKEN INTO
ACCOUNT FOR FUTURE PROJECTS.
QUALITY ASSURANCE & INSPECTION
BEST PRACTICES
• QUALITY SYSTEM AUDITS