Sei sulla pagina 1di 6

*The following document can be prepared only for those who are passed reem presentation interview

1. Application form : online registration under “ECOS” system at https://ecos.st.gov.my


(hard copy/sign.)
2. Project Report : same title/project with presentation/interview- (word format, times new
roman/arial – size 12 /interval 1.5)
3. Others support document ;
a) Photo passport size (non glossy)– 3 pcs ( name & i/c at the back)
b) I/C Photostat – front & back at 1 page (certified true copy)
c) Degree/Master/PHD certificate (certified true copy) – also print qualification
recognition from http://www2.mqa.gov.my/mqr/ for local university &
www2.mqa.gov.my/esisraf/ for oversea university.(IEM/BEM approval accepted)
d) CEMTC attendant certified + **Certified Energy Manager (CEM) certificate
(certified true copy) . - ** will prepare by MAESCO
e) Letter from company - to prove that you’re working there & do energy related job.
f) Lampiran A –accumulate minimum 52 weeks experience in energy efficiency for
degree & 26 week for professional engineer ; - can download from ECOS system
(verified by Commissioner For Oaths @ professional Engineer @ Manager n above)

4. 2
Kindly prepare above (No. 1,2,3) document for “ sets” ( except photo for 3 pcs only)& submit
to MAESCO secretariat office at; No.9 , jalan SS 7/10, Kelana Jaya, 47301 Petaling Jaya, Selangor
by “10 August 2019”
*Incharge : Anuar / Siswati, 03-78730784,017-5002161, training@maesco.org.my
*Maesco “will pay” to Suruhanjaya Tenaga all process & license fees (total RM120)
*‘certified true copy’ – by HR dept./Dept. head/Director/Professional Engineer (included name )
*Suggestion submission ; kindly comb binding your project report with transparent hard cover ,
for ‘application form+ support document’ staple together and attached under transparent cover.
Tuan/Puan,
Untuk makluman, semua salinan dokumen sokongan Permohonan PTE haruslah disahkan oleh
Pesuruhjaya Sumpah atau Professional Engineer atau pengurusan syarikat pemohon. Dokumen
yang disahkan haruslah mempunyai maklumat sekuranya-kurangnya berikut:
 Nama Pengesah;
 Jawatan Pengesah;
 Organisasi Pengesah;
 Tandatangan Pengesah; dan
 Cop Organisasi

Dimaklumkan kembali dokumen yang memerlukan pengesahan untuk makluman tuan / puan:

1) Satu salinan kad pengenalan yang disahkan;


2) Salinan resit pembaharuan pendaftaran dengan Lembaga Jurutera Malaysia (BEM)
yang terkini yang disahkan (jika ada);
3) Salinan Ijazah/ Setaraf yang disahkan;
4) Sekiranya Ijazah luar negara atau IPTS, harus disertakan pengiktirafan MQA atau
sijil pendaftaran dengan BEM atau badan yang diiktiraf oleh Kerajaan Malaysia;
5) Salinan perakuan Kekompetenan Suruhanjaya Tenaga yang sedia ada yang
disahkan (jika ada);
6) Senarai dan penerangan lengkap pengalaman kerja dan latihan berkaitan
pengurusan tenaga elektrik dengan cekap seperti yang dikehendaki dalam
Lampiran A. Pengesahan haruslah dilakukan di setiap muka Lampiran A;
7) Surat pengesahan yang berkenaan daripada majikan/ pihak pepasangan bahawa
pengalaman kerja pemohon di Lampiran A dan laporan yang disediakan oleh
pemohon adalah benar (bukan surat pengesahan jawatan); dan
8) Pengesahan laporan oleh majikan dimuka hadapan laporan projek.

Pohon kerjasama untuk tuan / puan memastikan perkara diatas dipatuhi bagi melancarkan proses
kelulusan PTE baharu dibawah seliaan tuan / puan.
ENERGY EFFICIENCY PROJECT
REPORT GUIDELINES
For

The Submission Of Application To Be A Registered


Electrical Energy Manager Under Efficient
Management Of Electrical Energy Regulations 2008
REPORT FORMAT & CONTENTS
1.0 TITLE OF THE PROJECT

2.0 OVERVIEW OF THE PROJECT


• Brief description and key objectives
• Qualifications and brief description of the experiences of the
applicant in energy management.

3.0 PROJECT TEAM MEMBERS


• List of names, designation and key roles in the project
• The roles by the applicant is to be highlighted.

4.0 PREPARATORY STAGE


• Basic description of each step that may cover:
• Conceptual idea and feasibility study/assessment conducted
• Proposal preparation and presentation for approval
• Procurement process involved
REPORT FORMAT & CONTENTS
5.0 ENERGY EFFICIENCY PRINCIPLES APPLIED
• Basic description of key engineering or energy efficiency
principles for the applications or technology applications that
will improve energy performance that will save energy from
the proposed project.

6.0 ENERGY SAVING POTENTIALS IN ENERGY UNITS


• Basic engineering/technical calculations to estimate potential
energy savings values can be achieved from the proposed
projects.

7.0 ENERGY SAVING MEASUREMENT


• Types of methodology and calculations used to measure
energy saving results from implementing the projects.

8.0 FINANCIAL ANALYSIS


• Basic financial information and analysis such as total costs,
Payback Period/ROI/LCC for the projects.
REPORT FORMAT & CONTENTS
9.0KEY STEPS AND IMPLEMENTATION PLAN
• The list of key steps involved and estimated duration in the work plan
for each step from the beginning until the completion of the project-
for completed projects.
• Proposed key steps and work plan-for proposed projects based on
energy audit/technical feasibility study.

10.0RESULTS
• The values of actual savings achieved - for implemented projects
• Status of the identified projects – for energy audit/feasibility studies.

11.0 APPENDICES
• Relevant/available technical specification/detailed
diagrams/drawings.

NOTES
• Also recommended to include relevant photos at various stages of
the projects/equipment installed.