Sei sulla pagina 1di 40

PLANNING, DESIGNING,QUANTITY ESTIMATING AND COSTING OF GREY

WATER TREATMENT PLANT FOR SVCET HOSTEL


A MINI PROJECT
Submitted by

SENTHIL SEVUGA PANDIAN N (922013103043)


AJITH KUMAR J (922013103301)
RAJA M (922013103307)
SELVENDRAN S (922013103309)

Project guide
Mr.M.Senthil Kumar M.Tech (Ph.D)

06/10/2016
OBJECTIVE
 The water from kitchen, bath and laundry is known as grey water. In ecological
sanitation (eco-san) systems this grey water is not mixed with human excreta.
 The sewage treatment is the process of removing contamination from wastewater and
household sewage both runoff (effluent) and domestics it includes physical chemical and
biological process to remove physical and chemical and biological contaminants.
 The objectives is to produce a treated effluent and a solid waste or reuse back in to the
environment sewage implies the collection of wastewater from occupied areas and
conveying them to some point of disposal.
 The aim of the project is to give a comprehensive description of the main components in
successful grey water management.

06/10/2016
METHODALOGY

 DETERMINATION OF QUANTITY OF WASTEWATER PRODUCED


 DESIGN AND DIMENSIONS OF TANK
 AUTO CAD (PLAN)
 DESIGN OF SIDE WALLS
 ESTIMATION

06/10/2016
POPULATION FORECAST:

Current population in Svcet hostel = 300 (2016)

Boys hostel =150 no's

Girls hostel = 150 no's

Design period = 30 years

06/10/2016
Incremental increase method

Pn = p (1+ ( ip/100))n
Where, p - current population

ip - average % rate of increases ( ip = 30% )

n - no. of decay

P3 = 300(1+30/100)3

= 659.1

= 800 (APPX)

P = 800

Population @ the year of 2046 is forecasted as 800.

06/10/2016
2.12 DIMENSIONS OF THE TANK:

DESCRIPTION QUANTITY L (m) B (m) D (m) FREE BOARD (m)

SCREEN 1 1 1 1 -
OIL TRAP 1 1 1.5 1 -
COLLECTION TANK 1 4 3 3 .5
AERATION TANK 1 5 5 3 .5
SETTLING TANK 1 3 3 2.5 -
FILTER FEED TANK 1 2.5 2.5 3 -
SLUDGE DRYING BED 4 1 1 1 .3

DISINFECTION TANK 1 2 2 2.5 -

WATER COLLECTION TANK 1 2 2 3 -

DISCRIPTION QUANTITY DIAMETER (m) HEIGHT (m) DEPTH OF LAYER (m)

PSF 1 1.23 1.5 0.6

ACF 1 1.35 1.5 0.6

06/10/2016
LAYOUT OF TREATMENT PLANT

06/10/2016
1. SCREEN CHAMBER
2. BAR SCREEN
3. OIL TRAP TANK
4. TRAP WALL
5. COLLECTION TANK
6. AERATION TANK
7. DIFUSSED AERATORS
8. SETTLING TANK
9. SLUDGE DRYING BEDS
10. FILTER FEED TANK
11. PRESSURE SAND FILTER
12. ACTIVATED CARBON FILTER
13. DISINFECTION TANK
14. BRACE WALL
15. WATER COLLECTION TANK

06/10/2016
06/10/2016
3D VIEW OF LAYOUT TREATMENT PLANT

06/10/2016
DESIGN WORK
• REFERENCE CODE BOOK
• IS 456 -2000 CODE PRACTICE OF PLAIN AND
REINFORCEMENT CONCRETE
• IS 3370 part(2): 2009 CONCRETE STRUCTURES
FOR STORAGE OF LIQUIDS

06/10/2016
STRUCTURAL DESIGN DETAILS
Description Depth (D) Main reinforcement Vertical Base slab
reinforcement

Screen tank 200mm 12mm @ 125mm 8mm @ 150mm 10mm@ 300mm

Oil tank 200mm 12mm @ 110mm 8mm @ 150mm 10mm@ 300mm

Settling tank 200mm 16mm@ 100mm 8mm @ 150mm 16mm@ 300mm

Sludge drying bed 200mm 12mm @ 125mm 8mm @ 150mm 10mm@ 300mm

Filter feed tank 200mm 16mm @ 200mm 8mm @ 150mm 12mm@ 300mm

Disinfection tank 200mm 16mm @ 200mm 8mm @ 150mm 12mm@ 300mm

Brace wall 75mm 16mm @ 225mm 16mm @ 225mm -

Description Depth (D) Long wall Short wall Vertical Base slab
reinforcement

Collection tank 300mm 25mm@ 110mm 16mm@ 110mm 8mm@ 100mm 16m@ 225mm
Aeration tank 300mm 25mm@ 110mm 25mm@ 8mm@100mm 16m@ 200mm
150mm

Treated water tank 200mm 16mm@ 100mm 12mm@ 8mm@150mm 12m@ 300mm
225mm

06/10/2016
STRUCTURAL DRAWING
• SCREEN CHAMBER
• OIL TRAP TANK
• COLLECTION TANK
• AERATION TANK:
• SETTLING TANK
• SLUDGE DRYING BED
• FILTER FEED TANK
• DISINFECTION TANK:
• BRACE WALL:
• TREATED WATER COLLECTION TANK

06/10/2016
SCREEN CHAMBER

06/10/2016
OIL TRAP TANK

06/10/2016
COLLECTION TANK

06/10/2016
06/10/2016
AERATION TANK

06/10/2016
06/10/2016
SETTLING TANK

06/10/2016
SLUDGE DRYING BED

06/10/2016
06/10/2016
FILTER FEED TANK

06/10/2016
06/10/2016
DISINFECTION TANK

06/10/2016
06/10/2016
BRACE WALL

06/10/2016
TREATED WATER COLLECTION TANK

06/10/2016
06/10/2016
06/10/2016
ESTIMATION AND COSTING

• ESTIMATION OF CIVIL WORK


• ESTIMATION OF MECHANICAL WORK
• ESTIMATION OF PLUMPING WORK

06/10/2016
SCHEDULE OF RATES

S.NO. ITEM DESCRIPTION UNIT RATE ($)


1
10

EXCAVATION IN SOIL < 2M Cubic Meters


2
350

SITE CLEARANCE Square Meters


3
6007

RCC 1:1.5:3 TANK SLABS Cubic Meters


4
210

SMOOTH PLASTERING 10MM Square Meters


5
100

WATER PROOFING AT TANK Square Meters

06/10/2016
ESTIMATION OF CIVIL WORK

S.NO DESCRIPTION QUANTITY

1 TOTAL EXCAVATION 31.64m3

2 TOTAL RCC 76.27m3

3 TOTAL PLASTERING 746.72m2

06/10/2016
COSTING OF CIVIL WORK
S.N Description Rate Quantity /Area Cost in Rs

1 SITE CLEARANCE 10 238 m2 2380

2 TOTAL EXCAVATION 350 31.64m3 11074

3 TOTAL RCC 6007 76.27m3 4568153.89

4 TOTAL PLASTERING 210 746.72 m2 156811.2

5 WATER PROOFING 100 746.72 m2 74672

TOTAL 4813091.09 Rs

06/10/2016
ESTIMATION OF MECHANICAL WORK

S.NO Description Cost in. Rs.

1. Mechanical Equipments for GTP–288 KLD 6,00,000.00

2. Erection and Commissioning Charges 20,000.00

Total 6,20,000.00

06/10/2016
ESTIMATION OF PLUMPING WORK
QUANTITY DESCRIPTION RATE UNIT AMOUNT

134m 11omm dia pvc 650 RM 87100.00


Pipe
2.64nos Plumber I class 500 Nos 1320.00

4.40nos Plumber II class 400 Nos 1720.00

2litres pvc adhesive 160 lit 320.00


solution
5no L-joint 70 Rs 350.00

2no T-Joint 70 Rs 350.00

2no Labour & travel charge 300 Rs 600.00

Rate of 10 rm 91,800.00

Rate of 1rm 9180.00

06/10/2016
COSTING OF PROJECT WORK
S.NO DESCRIPTION TOTAL AMOUNT

1 48,13,091.09
COSTING OF CIVIL WORK

2 COSTING OF MECHANICAL WORK


6,20,000.00

3 PLUMPING WORK
9180.00

TOTAL COST OF PROJECT 54,42,271.09

06/10/2016
CONCLUSION

• The sewage treatment plant is a hydraulic structure. It has been


planned by sufficient capacity after 30 years
• Grey water treatment technologies adopted in these systems
are economically feasible which make these systems more
attractive
• The treated grey water can be reused for the purpose of Toilet
flushing, Floor cleaning, Irrigation, Gardening, Car washing,
Construction.

06/10/2016
REFERENCE
ENVIRONMENTAL ENGINEERING – II
“P.C PUNMIA”
SEWAGE DISPOSAL AND AIR POLLUTION
ENGINEERING “S.K.GARG”
ADVANCE R.C.C DESIGN BY S.S.BHAVIKATTI.

STRUCTURAL DESIGN AND DRAWINGS-VOL. 2


–KRISHNAMURTHY.D

06/10/2016
THANK YOU