Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Haridwar
General awareness of
steam turbine
manufacturing
2
Main Gate of Head Office,Delhi
INTRODUCTION
BHEL is the largest engineering and manufacturing enterprise in India in the energy
related infrastructure sector today. BHEL was established more than 40 years ago when its
first plant was setup in Bhopal ushering in the indigenous Heavy Electrical Equipment
Industry in India a dream which has been more than realized with a well recognized track
record of performance.
BHEL caters to core sectors of the indian economy viz. Power Generation and Transm
ission,industry,Transportation,Telecommunication,Renewable energy,Defence etc.
4
BRIEF DETAILS
5
Main Manufacturing Units
1. BHEL Bhopal (Madhya Pradesh )
2. BHEL Ramachandrapuram, Hyderabad (Andhra Pradesh)
3. Transformer Plant, BHEL Jhansi(Uttar Pradesh)
4. High Pressure Boiler Plant and Seamless Steel Tube Plant,
Tiruchirapalli(Tamil Nadu)
5. Boiler Auxiliaries Plant, Ranipet (Tamil Nadu)
6. ElectronicsDivision and Electro Porcelain Division,
Bangalore(Karnataka
7. Jagdishpur (Uttar Pradesh)
8. Rudrapur (Uttrakhand)
9. Industrial ValvesPlant, Goindwal (Punjab)
10. BHEL Ranipur, Haridwar (Uttarakhand)
11. Bharat Heavy Plates and Vessels Limited(Vizag)
BHEL HARIDWAR
BHEL Haridwar has two Manufacturing Plants-
Heavy Electrical Equipment Plant(HEEP).
Central Foundry Forge Plant(CFFP).
HEEP is one of the major manufacturings of BHEL.The core business of HEEP
includes design and manufacture of large size stream and gas turbine,turbo-
generators,Heat Exchangers,Condensers and Auxillaries.
CFFP is engaged in manufacture of large size castings and forgings of various types
of steels like alloy steel,creep resistant steel and supercritical grade steel.
7
HARIDWAR
8
• BLOCK-3 This block is called Turbine
Manufacturing Block. This block contributes
maximum in terms of turnover. Where steam,
Gas & Hydro all three types of turbines are
manufactured. This Block also divided into 4
Bays. And these bays are further divided into
several sections and shops.
DESCRIPTION OF BLOCK-3
Block-III consists of four Bays, namely, Bay-I and II of size 36x378
metres and 36x400 metres respectively and Bay-III and IV of size
24x402 metres and 24x381 metres respectively. The Block is equipped
with the facilities of EOT Cranes, compressed air, Steam, Overspeed
Balancing Tunnel, indicating stands for steam turbine, rotors, one Test
stand for testing 210 MW steam turbines Russian Design, one Test
Stand for Hydro Turbine Guide Apparatus and two separate Test
Stands for the testing of Governing Assemblies of Steam and
Hydro Turbines
All the parts are conserved, painted and packed before dispatch
10
BLOCK (ASSMBLING OF TURBINE)
Type of steam turbine
21
REFERENCES
• Online help:
• http://www.bhel.com/home.php
• http://en.wikipedia.org/wiki/Bharat_Heavy_El
ectricals_Limited
• careers.bhel.in/etrlive/jsp/et_eng_index.jsp
22
Thank You