Sei sulla pagina 1di 29

Quality Control Services Co. Ltd.

NDT Specialists

1
Introducing QCS..
WE ARE

A company that offers


Advanced and Conventional
all NDT methods and Heat Treatment..

A complete set of
Modern Tools and Equipment
Directed by a diversity of
Professionals and Experts
View QCS . .
Establishment..
Starting Work..
Development..
Organization..
Growing up..
Recent Status..
Establishment..
 Launched early in 2009 in Al Khobar, KSA.

 Started with 30 technicians & 10 Ir Sources.

 Approved procedures for all NDT methods.

 A fleet of equipped vehicles of 15 Hiluxes.

 Two bunkers in the company site &in Abqaiq.

 A storage joins all NDT tools & accessories.


Starting Work..
 The opening project was an AUT offshore project:
SAUDI ARAMCO MANIFA OFFSHORE WATER INJECTION & CRUDE PIPELINES &
POWER AND COMMUNICATION CABLES PROJECT

 This project lasted 8 months of 24/7 continuous


offshore work on the barge.

 Jointly QCS and UT Quality team completed the


work successfully as scheduled.

 ARAMCO & the client’s appreciation was achieved.


Development..
 Approving the company services by the main
clients in the market..

 Supporting the technical staff with new expertise


and certificates..

 Conducting training courses @ the company site


for ours and others’ technicians.

 Adopting modern NDT technologies through


cooperation with global ancient companies.
Introducing QCS.. APPROVED BY:

+ Many Others ..
Organization..
Organization..
QCS contains five main departments;

 Business Development

 Operations (NDT and Heat Treatment)

 Quality Control (QA/QC)

 HR & Administration

 Accounting
Organization..
Growing up..
 QCS have now four branches plus the main office in KSA.

 The no. of running projects exceeds 10.

 The manpower exceeds 120 technicians.

 The authorized no. of radioactive sources are 51.

 The vehicle fleet is exceeding 45.

 Introduced Heat Treatment & IRIS .

 R&D department is starting with support of three


universities in KSA and Jordan.
Current Status..
 QCS is capable to provide all types of NDT
services; both conventional and advanced, plus
Heat Treatment , IRIS, ILI and RBI.

 Along with our sister company;

we are capable of meeting any requirement


regardless of the location or size of work.
Conventional Methods..
Radiographic testing
(Gamma rays, X-rays, Crawlers)

Ultrasonic testing (UT), including TKY


(All kinds of UT equipment)

Liquid Penetrant
Magnetic Particle
(VT)
Visual Testing
Advanced Methods..
o ToFD
o Phased Array
o MFL
o IRIS

(VT)
o Gamma Ray Projectors (25)
o UT Machines (7)
o IRIS (2)
o Borescope (2)
o PMI machine (XRF and OES) (2 and 2)
o Heat treatment Machine (40)
o Dark Rome equipment's (10)
o MT Yoke (25)
o Survey meter (120)
o EPD (120)
o Phase Array Ultrasonic (7)
o AUT Machine (3)
Completed Projects:

Client Project Location Scope Duration Method(S)


KJO KJO Khafji 8 Exchangers 1 Month RFET,IRIS
Petrol Steel, SATORP Jubail Film Review 1 Year RTFI
GCC, SATORP Jubail Film Review 1 Year RTFI
Valentine Maritime Manifa Pipe Laying Manifa Offshore Marine Line 10 Months UT SCAN & UT,MT
CAT UBTG-1 Shedgum Pipeline 4 Months UT SCAN
Yanbu Steel Crystal Yanbu Vessels 3 Months RT +
Yanbu Steel Yabu Cement Yanbu Tanks 3 Months RT +
Energya Project-146 Rabigh Vessels 3months RT +
Bemco Bemco1 Rabigh Columns 2months UT SCAN
RHM Juaimah Pipeline Khursaniya Pipeline 1 Month UT SCAN
Hyundai Karran Gas Factory Khursaniya Tie-Ins 3 Months METAPHASE
Yanbu Steel Rabigh Power Plant Rabigh 11 Tanks 15 Months RT+
Energya CEMCO Rabigh Flares + Cans 6 Months RT+
Energya Rabigh Power Plant Rabigh Pipes 6 Months RT+
Energya S.E.T.E Rabigh Vessels 6 Months RT+
Energya Bemco-157 Rabigh Vessels 6 Months RT+
CAT UPTG-1 Shedgum Pipeline 1 Year RT,UT,PT & MT
GCC QPL Project Al-Qassim 3rd Party Inspection 8 Months RTFI
GCC Sales Gas Pipelines RAS Al-Khair 3rd Party Inspection 8 Months RTFI
Yanbu Steel Sahara/Daelim Jubail 23 Vessels 2 Years RT+
CEMC CO Rabigh Power Plant Rabigh Flair & Plates 6 Months UT
Energya SK Engenering Rabigh Plates 4 Months RT, UT
Energya MMG Rabigh Plates 4 Months RT, UT
Al-Zamil Hail Power Plant Hail Tanks 3 Months RT,PT
Energya Zeeco Rabigh Vessels 6 Months RT+
Bemco Steel Bemco Rabigh Columns 6 Months UT
Riyadh Refinery Riyadh Ref New Heater Al-Riyadh Pipes Pre-Heating 3 Months PWHT
Samsung Satorp Jubail Pipes 3 Months PWHT
Npc Aramco Daharan Manpower Supply 2 Years VT,RT,UT
Yanbu Steel Sahara/Daelim Y.S. Work Shop 11 Tanks 1 Year RT+
Yanbu Steel Ventech Yanbu Vessels/Columns 2 Year RT+
Al-Zamil Rabigh Power Plant Rabigh 13 Tanks/ Water 12months RT+
Inma Inma Yanbu 3 Months PWHT
Qurayyah P. Plant Bemco Qurayyah 18 Months RT , MT ,PT
Qurayyah P. Plant Bemco Qurayyah Pipes 18 Months PWHT
Gsse Rabigh Power Plant Rabigh Pipes 12 Months RT
Alsc Rabigh Power Plant Rabigh Pipes 12 Months RT
Fawaz A. Bajaber Rabigh Power Plant Rabigh Pipes 2 Months RT
Yanbu Steel Samsung Jubail 18tanks 2 Years RT+
Hameed Ali Rabigh Power Plant Rabigh Pipes 6 Months RT
Welspun Welspun Dammam 3 Months UT
Sepco Iii Rabigh Power Plant Rabigh Tanks+ Pipes 2 Years PWHT
Inma Saudi Kayan Shutdown Al-Jubail 2 Months PWHT
Bemco Riyadh Ppwer Plant 10 Al-Riadh Tanks+ Pipes 1 Year RT,UT,MT
KJO Shut Down (On+Offshore) Al-Khafji Shutdown 2 Months SHUTDOWN
G5 G5 Dammam Pipes 6 Months RTFI
CTCI Al Zamil Yerp/Aramco Yanbu 5 Tanks 6 Months RT , MT ,PT
Al-Bloushi Group Yasref Yanbu 11 Tanks 6 Months RT
Mizat Abu Hadriah Al-Jubail Pipeline 6 Months RT,MT
Fmq Aindar Dammam Pipes 6 Months RT,MT
Fmq Dammam 2nd Industrial Dammam Pipes 6 Months RT,MT
Sepco Iii Rabigh Power Plant Rabigh Pipes 1 Year PT , MT
Yuksel Jazan-Leith Pipe Line Laith 160 Km Pipeline 1 Year RT,AUT
GTC Riyadh Ref New Heater Al-Riyadh Tanks 2 Months PWHT
Eversendai Eversendai Al-Riadh 2 Years UT,MT
Precision Forgings Precision Forgings Dammam 1 Year PMI , UT
Welspun Welspun Dammam Pipes 1 Year RTFI
Inma Sharq/Sabic Jubail Shutdown 1 Month SHUTDOWN PWHT
Al Amara International Sharq/Sabic Jubail Shutdown 1 Month RTSAFERAD,RSO,PT
Bilfal Jubail Vessels+ Pipes 4 Months UT,RT
Khodari Petro Rabigh Rabigh Pipes 6 Months RT , UT
Petrojet Yerp/Aramco Yanbu Tanks+ Pipes 1 Year MT+
Petrol Steel Sadara Chemical Company Jubail Tanks+ Pipes RT,PMI.MT
Alishar Jazan-Leith Pipe Line Laith 200 Km Pipeline 18 Months RT
El - Seif Company Haramain H Speed Railway Rabigh Railway 18 Months MT,PT,UT
Abv Rock Yerp/Aramco Yanbu Tanks+ Pipes 1 Year RT,MT, UT
Gulf Steel Works Yerp/Aramco Yanbu 13 Tanks 1 Year RT,MT
Olyan Descon Yerp/Aramco Yanbu Tanks+ Pipes 1 Year RT,MT, UT
Ysc Yerp/Aramco Yanbu Tanks 2 Years RT,MT, PAUT
Al Amara International Sharq/Sabic Jubail 1 Year RTSAFERAD,RSO,PT
KJO ( Shutdown) Khafji Shutdown 3 Months IRIS+B.SCOPE+API
Zamil Dammam Different 1 Year UT
Dragados KJO Khafji Pipes 1 Year RT,UT,MT,PMI
Al swaidi Wasit Jubail Pipes 2 Years RT,MT,HT,PWHT
AICO Yerp /Aramco Yanbu Tanks 1 Year RT,MT, UT
Main Running Projects:

Client Project Location Scope Duration Method


Yanbu Steel Lubref Yanbu Different 2 Years RT,MT, UT
GSCC Wasit Jubail Pipes 2 Years RT,MT,PWHT
Samsung Pkg.4 Ighc Project Shaybah Pipeline+ Pipes 2 Years PMI,RT,PWHT,MT,PT
Larsen & Toubro Wasit Jubail Pipes 2 Years RT,MT, UT+
Hidada Jeddah Tanks+ Pipes 6 Months RT , UT
Al-Sadiq Sabic Jubail Pipes 6 Months RT SAFE RAD
Sungdo Wasit Jubail Pipes 2 Years RT,MT,PMI
Dangho SWCC Riyadh Tanks 2 Years RT,MT
Gusat Sadara Chemical Company Jubail Different 2 Years PMI,RT,PWHT,MT
TCC Sadara Chemical Company Jubail Pipes 2 Years PMI,RT,PWHT,MT
o ASNT level III (3)
o ASNT level II RT (60)
o ASNT level II MT (80)
o ASNT level II PT (90)
o ASNT level II UT (12)
o Heat treatment and hardness (40)
o Engineers (15)
Thank You

Potrebbero piacerti anche