Line/BUS PT Replacement
PT Detail
Ratio 220KV/1.732/110V/1.732
Metering
Line PT
1 PT-01 Class 0.2 Metering(ABT) Cabin NA
Metering(TSTRANSCO)
Switchyard
Burden 10VA
2
Metering & Protection Equipment Detail
Line CT Detail
Equi
pmen Which Which Which Which Which
Sr.N Euipment Specific Purpo Purpo Core- Purpos
t Core-01 Purpose Meter/Rel Core-02 Purpose Meter/R Core-03 Meter/R Core-04 Meter/ Meter/
o. Location ation se se 05 e
Nam ay elay elay Relay Relay
e
Ratio 400/1A
Line CT
Metering(T CT- Class 0.2s Meterin
1 NA NA NA NA NA NA NA NA NA NA NA NA NA
STRANSC 01 g(ABT)
O) 5VA, ISF
Burden
<10
800-
800-600- 800-600- 800-600- 800-600-
Ratio 600-
400/1A 400/1A 400/1A 400/1A
Line Line 400/1A Meterin
Busba
Distanc Distance g, O/C
Line CT CT- Class PS ABB REDPS MICOM PS r REB PS 0.2 REC
2 e& & Spare NA E/F
Protection 02 670 P546 Protec 670 670
Vk>=100I(R Different Vk>=100I(R Differenti tion Vk>=80I( protecti
ial al Vk>=80I(Rct+3 on
ct+20), ct+20), Rct+3), 20VA,
Burden ), Im<3mA,
Im<100mA, Im<100mA, Im<3mA, ISF<5
@Vk
@Vk @Vk @Vk
3
Metering & Protection Equipment Detail
Bus CT & Trafo CT Detail
Euipme
Equip Which Which Which Which Which
Sr.N nt Specifi Purpos Purpos
ment Core-01 Purpose Meter/ Core-02 Purpose Meter/ Core-03 Meter/ Core-04 Meter/ Core-05 Purpose Meter/
o. Locatio cation e e
Name Relay Relay Relay Relay Relay
n
800-
Ratio 800-600-400/1A 800-600-400/1A 800-600-400/1A 800-600-400/1A 600-
BUS-01 400/1A
CT
1 CT-03 Class PS PS NA PS NA PS 0.2
Protecti
on Vk>=100I(Rct+20) Vk>=100I(Rct+20) Vk>=80I(Rct+3), Vk>=80I(Rct+3), 20VA,
Burden
, Im<100mA, @Vk , Im<100mA, @Vk Im<3mA, @Vk Im<3mA, @Vk BusBar ISF<5
REB
Spare NA Spare Spare Protect Spare NA
670 800-
ion
Ratio 800-600-400/1A 800-600-400/1A 800-600-400/1A 800-600-400/1A 600-
BUS-02 400/1A
CT
2 CT-04 Class PS PS NA PS NA PS 0.2
Protecti
on Vk>=100I(Rct+20) Vk>=100I(Rct+20) Vk>=80I(Rct+3), Vk>=80I(Rct+3), 20VA,
Burden
, Im<100mA, @Vk , Im<100mA, @Vk Im<3mA, @Vk Im<3mA, @Vk ISF<5
100-
Ratio 100-150/1A 100-150/1A 100-150/1A 100-150/1A
Trafo- 150/1A
UV ,O/C, Busbar TVM &
1(30/50 Class 5P20 REC PS Differential RET PS REB PS 0.2 Meterin
3 CT-05 E/F, Protecti Spare NA REC
MVA) 670 ,REF 670 670 g
Synch Vk>=40I(Rct+10), Vk>=80I(Rct+10), on Vk>=80I(Rct+10) 20VA, 670
CT Burden 30VA
Im<30mA, @Vk Im<30mA, @Vk , Im<30mA, @Vk ISF < 5
500-
Ratio 500-300/1A 500-300/1A 500-300/1A 500-300/1A
Trafo- 300/1A
UV ,O/C, Busbar TVM &
2(60/80 Class 5P20 REC PS Differential RET PS REB PS 0.2 Meterin
4 CT-06 E/F, Protecti Spare NA REC
MVA) 670 ,REF 670 670 g
Synch Vk>=40I(Rct+10), Vk>=80I(Rct+10), on Vk>=80I(Rct+10) 20VA, 670
CT Burden 20VA
Im<30mA, @Vk Im<30mA, @Vk , Im<30mA, @Vk ISF < 5
4
Action taken & PT protection Detail
3. Impedance Protection
5
SOP for PT Failure
PT Failure Check Point
Sr. No. Topics Description of Point
1. Check CRP Panel End Voltage & Loose connection
2. Check PT Junction Box end voltage & Loose connection
1 Visual checking
3. Check If any PT link Terminal blocks are blown
4. Check visual inspection of PT if minor damage or major damage
1. If the minor damage observed then inform to respective vendor and get the confirmation to
charge(Ex. sealing)
2. If the major damage observed then take the snaps and removed the faulty equipment
2 OEM & HO confirmation
3. Check the PT circuit for this PT core used only for metering or protection
4. If only metering purpose used this PT then you will charge without PT and check the
voltage reference from other PT
1. Spare availability check at site
2. And this spare equipment ratio & specification should match with existing equipment
3 Spare Availability at site
3. Spare equipment base plate dimension should check with existing equipment(hole
matching)
4. Properly erected and charged
6
SOP for Bus PT change over system
4. BPT change over system steps mentioned in next slide(Slide No. 8 to Slide No.15)
7
100 MW RAUPL 220 kV Switchyard is designed with Double Bus Scheme
In case of failure of BUS-1 PT we can switch into BUS-2 by following steps
8
BPT-02 Change Over Steps in case BPT-01 Failure
b) Open the 89 A isolators of 201 Bays
9
BPT-02 Change Over Steps in case BPT-01 Failure
b) Open the 89 A isolators of 203 Bays
10
BPT-02 Change Over Steps in case BPT-01 Failure
b) Open the 89 A isolators of 204 Bays
11
BPT-02 Change Over Steps in case BPT-01 Failure
12
BPT-02 Change Over Steps in case BPT-01 Failure
13
BPT-02 Change Over Steps in case BPT-01 Failure
14
BPT-02 Change Over Steps in case BPT-01 Failure
15
BPT-01 Change Over Steps in case BPT-02 Failure
In case of failure of BUS-2 PT we can switch into BUS-1 by following steps
a) Open the 89 PT-2 Isolator
16
BPT-01 Change Over Steps in case BPT-02 Failure
19
SOP for Line PT Protection Bypass system
2. site person should get the confimation from HO if any any protection bypass
Spare Not 3. PT selector switch provided in CRP panel(Bus PT voltage going to Line PT Relay through this switch)
1
Available at site referred in Slide No.43
5. This protection bypass( synch & UV) required upto bus charging only then normalised the protection and
Trafo. charged successfully
20
SOP for Line PT Protection Bypass steps in REC 670 Relay
In case of failure in Line PT By pass protection by following steps
21
Line PT Protection Bypass steps in REC 670 Relay
Press Menu->
22
Line PT Protection Bypass steps in REC 670 Relay
Settings->
23
Line PT Protection Bypass steps in REC 670 Relay
24
Line PT Protection Bypass steps in REC 670 Relay
Control->
25
Line PT Protection Bypass steps in REC 670 Relay
26
Line PT Protection Bypass steps in REC 670 Relay
Operation->
27
Line PT Protection Bypass steps in REC 670 Relay
28
Line PT Protection Bypass steps in REC 670 Relay
29
Line PT Protection Bypass steps in RED 670 Relay
30
Line PT Protection Bypass steps in RED 670 Relay
Press Menu->
31
Line PT Protection Bypass steps in RED 670 Relay
Settings->
32
Line PT Protection Bypass steps in RED 670 Relay
Setting group N->
33
Line PT Protection Bypass steps in RED 670 Relay
34
Line PT Protection Bypass steps in RED 670 Relay
35
Line PT Protection Bypass steps in RED 670 Relay
Step 1->
36
Line PT Protection Bypass steps in RED 670 Relay
Operation->
Enter & change
the ON as OFF->
37
Line PT Protection Bypass steps in RED 670 Relay
Return to previous
menu by left arrow ->
38
Line PT Protection Bypass steps in RED 670 Relay
step 2->
39
Line PT Protection Bypass steps in RED 670 Relay
operation->
Enter & change
the ON as OFF->
40
Line PT Protection Bypass steps in RED 670 Relay
Press Esc & Automatic
saved changes
41
Line Breaker Closing
2. Now close the Line Breaker & taken into service &
charged upto Bus PT with respect to connected Bus
42
PT Selector Switch change over method
3. Then switch the PT Selector switch in Line CRP Panel (+AA)from Line PT selector to
Bus PT so that Line PT secondary circuit will isolate from CRP & BUS PT voltage input
will get from BUS PT to Line CRP
4. After completing changing this selector switch bus voltage goes to Line protection Relay.
So this Protection bypass required upto bus charging only. Then normalised all protection
43
Transformer Charged
44
Thank you