19 Feb 2015
1,800 Visayas Partial Blackout
1,600
1,400
KSPC U1 (103 MW) on PO from
27 Oct – 11 Nov 2015
CEDC U1 (82 MW) on FO
1,200 from 17-21 May 2015 CEDC U3 (82 MW) on FO from PEDC U2 (82 MW) on FO from
CEDC U1 (82 MW) on PMS 16 - 20 Aug 2015 03-05 Nov 2015
from 21 Feb - 7 Mar 2015 CEDC U3 (82 MW) on FO
1,000 from 13 -20 May 2015
PEDC U2 (82 MW) on FO from TGPP U2 (36 MW) on PO from
PEDC U1 (82 MW) on FO from 07-12 Nov 2015
PEDC U2 (82 MW) on FO 10 – 24 Aug 2015
10 Feb - 05 Mar 2015
from 25-28 May 2015 PEDC U2 (82 MW) on FO from
800 CEDC U3 (82 MW) on FO from 07 – 09 Nov 2015
PGPP1 U3 (37 MW) on PO from
28 Feb - 8 Mar 2015
07 Aug 2015 to 09 Sep 2015
CEDC U1 (82 MW) on FO from
600 06 -15 Nov 2015
19-Mar
1-Jan
8-Jan
12-Mar
26-Mar
14-May
21-May
28-May
2-Apr
9-Apr
4-Jun
2-Jul
9-Jul
6-Aug
17-Sep
12-Nov
15-Jan
22-Jan
29-Jan
12-Feb
19-Feb
26-Feb
10-Sep
24-Sep
1-Oct
8-Oct
18-Jun
16-Apr
23-Apr
30-Apr
11-Jun
25-Jun
16-Jul
23-Jul
30-Jul
13-Aug
20-Aug
27-Aug
5-Nov
5-Feb
5-Mar
7-May
3-Sep
15-Oct
22-Oct
29-Oct
TOTAL AVAILABLE CAPACITY SYSTEM PEAK DEMAND REQ'D REG. RESEREVE REQ'D CONT. RESERVE REQ'D DISP. RESERVE
JAN FEB MAR APR MAY JUN JUL AUG
Source: National Grid Corporation of the Philippines (NGCP) Daily Operations Report
Note:
1
FO – Forced Outage / PO – Planned Outage
Visayas Additional Capacities (01 Jan 2014 to 15 Oct 2015)
San Carlos Solar Photovoltaic Power Project San Carlos City, Negros
13 9 15-May-2014
Phase 1 Occidental
San Carlos Solar Photovoltaic Power Project San Carlos City, Negros
9 7.5 16-Aug-2014
Phase 2 Occidental
Valencia, Negros
Nasulo Geothermal Project 49.37 40 26-Sep-2014
Oriental
San Lorenzo Wind Farm Project (TAREC) San Lorenzo, Guimaras 54 50 27-Dec-2014
San Carlos Solar Photovoltaic Power Project San Carlos City, Negros
23 15 6-Sep-2015
Phase C and D Occidental
Ready for
TPC – 1A Coal Toledo City, Cebu 82 75.9 commercial
Operation
Note: Dependable Capacity based on submitted report of GenCos. Those that are italicized are computed with consideration of station use per plant type
technology
As of 15 October 2015
VISAYAS DEMAND-SUPPLY OUTLOOK 2015-2020
2015 2016 2017 2019
Oct: 3 MW VMCI Bio Jan: 3.9 MW Calumangan DPP U4 Jul: 15 MW Biliran GPP U3 Dec: 0.8 MW Amlan HEPP
8 MW Villasiga HEP Mar: 132.5 MW Cadiz Solar Power Nov: 15 MW Biliran GPP U4
17 MW URC Bagasse Cogen Phase 2 Project Dec: 14 MW Nabas Wind Phase 2
Nov: 18 MW La Carlota Solar Power Jun: 135 MW Concepcion Coal 1
Project Phase A Aug: 150 MW PEDC Expansion 2018
Dec: 5 MW Calumangan DPP U1 Sep: 10 MW Biliran GPP U1 Jun: 5.1 MW Igbulo HEPP
5 MW Calumangan DPP U2 Oct: 10 MW Biliran GPP U2 8 MW Cantakoy HEPP
5 MW Calumangan DPP U3 Nov: 135 MW Concepcion Coal 2
ACTUAL
Notes
a. Reserve Margin (RM) i.e. 4% regulating reserve and largest online unit for contingency and dispatchable reserve requirement (100 MW
to increase by 135 MW in 2016)
b. 7 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 7 percent GDP growth rate (GR) target for 2014-2015.
c. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth
applied to 8 percent GDP growth rate (GR) target for 2016-2020. * On-going testing and commissioning 3
Bold & italicized – with changes on schedule
As of 15 October 2015
Visayas Summary of Power Projects
(as of 15 October 2015)
Committed Indicative
As of 15 October 2015
COMMITTED POWER PROJECTS
Visayas Grid Committed Power Projects, 695.30 MW
Rated Capacity Target Testing & Target Commercial
Name of the Project Project Proponent Mother/ JV Company Location
(MW) Commissioning Operation
AC Energy Holdings, Inc./
Palm Thermal
Concepcion Coal-fired Power Palm Thermal Brgy. Nipa,
Consolidated Holdings 135.0 Apr-2016 Jun 2016c
Plant Unit 1 Consolidated Holdings Concepcion, Iloilo
Corp.
Corporation
Panay Energy
Global Business Power Brgy. Ingore, La
PEDC Expansion Development 150.0 Aug 2016 Aug 2016
Corporation Paz, Iloilo
Corporation
AC Energy Holdings, Inc./
Palm Thermal
Concepcion Coal-fired Power Palm Thermal Brgy. Nipa,
Consolidated Holdings 135.0 Sep-2016 Nov-2016
Plant Unit 2 Consolidated Holdings Concepcion, Iloilo
Corp.
Corporation
TOTAL COAL 420.00
U1 – Nov 2015b U1 – Dec 2015b
Energreen Power Brgy. Calumangan,
Calumangan Diesel Power U2 – Nov 2015b U2 – Dec 2015b
Development & Bago City, Negros 18.9
Plant U3 – Nov 2015b U3 – Dec 2015b
Management, Inc. Occidental
U4 – Dec 2015 U4 – Jan 2016
TOTAL OIL-BASED 18.90
Sunwest Water &
Sunwest Water & Electric Brgy. Igsoro,
Villasiga HEPP Electric Co. Inc. 8.0 Jul-2015 Oct-2015
Co. Inc. (SUWECO) Bugasong, Antique
(SUWECO)
Igbulo (Bais) Hydroelectric Century Peak Energy Century Peak Energy
Igbaras, Iloilo 5.1 June 2018a June 2018a
Power Project* Corporation Corporation
Quadriver Energy
Cantakoy HEP Quadriver Energy Corp. Danao, Bohol 8.0 June 2018a June 2018
Corp.
Natural Power
Natural Power Sources Amlan, Negros
Amlan Sources Integration, 0.8 Nov 2019 Dec 2019
Integration, Inc. Oriental
Inc.
TOTAL HYDRO 21.90
Universal Robina
Corporation Bagasse Universal Robina Universal Robina Kabankalan,Negros
17.0 Aug 2015 Oct 2015
Cogeneration Corporation Corporation Occidental
Phase 2d
VMCI Bagasse-Fired Victorias Milling Victorias Milling Company
Negros Occidental 3.0 Oct-2015 Oct-2015a
Cogeneration Plant Company Inc. Inc.
TOTAL BIOMASS 20.00
Nabas Wind Power Project Petrogreen Energy Petrogreen Energy Brgy. Pawa, Nabas,
14.0 2017 2017
Phase 2 Corporation Corporation Aklan
TOTAL WIND 14.00
a Revisedbased on REMB’s report c Revised based from DOE-VFO
* New Entry from Indicative List
b Updated from proponent’s submission d New Entry to Committed Project As of 15 October 2015
COMMITTED POWER PROJECTS
Visayas Grid Committed Power Projects, 695.30 MW
Target
Rated Capacity Target Testing &
Name of the Project Project Proponent Mother/ JV Company Location Commercial
(MW) Commissioning
Operation
U1 – Sept 2016b
Biliran Geothermal Plant Biliran Geothermal Orka Energy Philippine U2 – Oct 2016b
Biliran, Biliran 50.0 Aug 2016
Project Phase 1* Incorporated (Iceland) U3 – Jul 2017b
U4 – Nov 2017b
As of 15 October 2015
INDICATIVE POWER PROJECTS
Visayas Grid Indicative Power Projects 601.11 MW
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW) Target Commissioning
Therma Visayas Aboitiz Power Brgy. Bato, Toledo U1-150.0 U1 – Dec 2017
Therma Visayas Inc.
Energy Corporation City, Cebu U2-150.0 U2 – Mar 2018
TOTAL COAL 300.00
Dauin Geothermal Energy Development Energy Development
Dauin, Negros Oriental 40.0 Dec 2021
Project Corporation (EDC) Corporation (EDC)
TOTAL GEOTHERMAL 40.00
Miag-ao Solar Power COSMO Solar Energy, COSMO Solar Energy,
Miag-ao, Iloilo 5.67 Oct 2015
Project Inc. Inc.
As of 15 October 2015
INDICATIVE POWER PROJECTS
Visayas Grid Indicative Power Projects, 601.11 MW
Target
Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)
Commissioning
Timbaban Hydroelectric Oriental Energy and Power Generation Oriental Peninsula
Madalag, Aklan 18.0 May 2018
Power Project Corporation Resources Group Inc (ORE)
Loboc Hydro Power
Sta Clara Power Corporation Sta Clara Int’l Corporation Loboc, Bohol 1.2 Jun 2018
Project
Hilabangan (Upper Century Peak Metals Kabankalan, Negros
Century Peak Energy Corporation 4.8 Aug 2018
Cascade) Holdings Corp Occidental
Hilabangan (Lower Century Peak Metals Kabankalan, Negros
Century Peak Energy Corporation 3.0 Aug 2018
Cascade) Holdings Corp Occidental
Main Aklan River
Sunwest Water & Electric Co. Inc. Sunwest Water & Electric
Hydroelectric Power Libacao, Aklan 15.0 Sept 2018
(SUWECO) Co. Inc. (SUWECO)
Project
Maninila (Lower Century Peak Metals
Century Peak Energy Corporation San Remigio, Antique 4.5 Oct 2018
Cascade) Holdings Corp
Maninila (Upper Century Peak Metals
Century Peak Energy Corporation San Remigio, Antique 3.1 Oct 2018
Cascade) Holdings Corp
Century Peak Metals
Sibalom (Upper Cascade) Century Peak Energy Corporation San Remigio, Antique 4.2 Oct 2018
Holdings Corp
Sibalom (Middle Century Peak Metals
Century Peak Energy Corporation San Remigio, Antique 4.0 Oct 2018
Cascade) Holdings Corp
Century Peak Metals
Sibalom (Lower Cascade) Century Peak Energy Corporation San Remigio, Antique 4.0 Oct 2018
Holdings Corp
Basak II Meadowland Developers, Inc. Badian, Cebu 0.5 Apr 2019
Amlan (Plant B) Natural Power Sources Integration, Inc. Amlan, Negros Oriental 1.5 Jul 2019
Amlan (Plant A) Natural Power Sources Integration, Inc. Amlan, Negros Oriental 3.2 Sept 2019
Amlan (Plant C) Natural Power Sources Integration, Inc. Amlan, Negros Oriental 0.80 Sept 2019
Lower Himogaan** LGU of Sagay Sagay, Negros Occidental 4.0 Sept 2020
SCBiopower Bagasse-
San Carlos Biopower
Fired Power Generation Bronzeoak Philippines Negros Occidental 18.0 Nov-2015
Inc.
Project
MCEI Multi-Feedstock
Megawatt Clean
Biomass Power Plant Negros Occidental 10.8 May 2018
Energy, Inc.
Project
TOTAL BIOMASS 61.80
AES Philippines AES Philippines
AES Battery Storage Kabankalan, Negros
Power Partners Co., Power Partners Co., 40.0 Oct 2016
Project Occidental
LTD. LTD.
TOTAL BATTERY 40.00
TOTAL 601.11
a Revised based on REMB’s report
As of 15 October 2015