Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Quality Metrics
Check List Check list comprising of all necessary components (supplied by the vendor)
shall be used to ensure all the components are provided as per specifications
and are in working order.
Cause & Cause and Effect Diagram shall be used to identify problems. It is important
Effect that all components are checked separately before assembling to save time.
Diagrams
Scatter During Test Phase of the aircrafts, all the data shall be plotted on scatter plots
Plots and engineers shall ensure that results are in line with the desired objectives of
each test. In case there is any problem, use the most suitable tool from this
table to identify and correct the problem.
Histogram Histograms shall be used to plot the data during flights to observe the
Charts performance overtime (specially for the battery & Communication)
Control All the data related to communication (audio & video) must be plotted in control
Charts chart with acceptable lower and upper noise reading (LCL & UCL).
All the data related to supply of current / battery output shall be plotted in
control chart with acceptable lower and upper voltage & Current readings (LCL &
UCL).
USL & LSL shall be used to raise alarm. USL shall be 5% lower than UCL; LSL shall
be 5% higher than LCL.
Description- Project Acceptable limit Industry Benchmark
Acceptable Defected
2 Parts 3 parts
Parts per 100 parts
Acceptable Signal-to-
35 dB 30 DB
Noise Ratio (SNR)
Delivery of
90 Days 90 Days
components
Delivery of
surveillance aircraft to 10 months 10 months
customer
Check points / Gates of quality
1.
Supply of
Components
by Vendors
2.
5.
Assembling
Customer
Process
Test phase
QA / QC
4. 3.
Handover to Post
customer Assembling
Phase
Factory Acceptance Test
Supply of Components by
1
Vendors
Assembling Process 2
Handover to customer 1