Sei sulla pagina 1di 5

CREATING THE M&E

FRAMEWORK
A WORKSHOP
Instructions – PART I
 Within your table, create a Logical Framework using the matrix
suggested.
 The logframe should be related to the implementation of SMEA
 Write your answer in the manila paper provided. At the bottom,
draw a rectangular box.
 Do this within 1.5 hours SAMPLE

Leave a box below


PROGRAM MEANS OF
INDICATORS ASSUMPTIONS
GOAL
SUMMARY VERIFICATION

Overall Goal Measures Indicators


ACTIVITIES OUTPUTS PURPOSE

Specific
Measures Indicators
Objective
Expected
Measures Indicators
Results

Activities Inputs and Resources Indicators


Means of
Program Summary Indicators Assumptions
Verification
Overall Goal Measures Indicators Community members change variuos
Improve Tagumenos quality of life > Reduced incidence of diarrheal > Public health survey behaviours that impact the
Goal
disease results transmission of disease
> Reduced school absenteism > School absenteism (handwashing, open defecation, catte
rates from the school grazing, etc.)
Specific Objective Measures Indicators > Cameroon teams is able to provide
Improve the community with > Reduced household burden (i.e. > Public health improved access to and/or improved
improved access to a sufficient distance, time, number of trips) in household surveys quality of water to additional
Purpose

water supply catchment area acquiring sufficient water quantity conducted pre and post sttlements in the community
protection > Increased quantity and consistency implementation > Community is able to support and
in water supply available year round > Monthly water quality build capacity of both the water and
> Improved quality of available water and quantity tests health committees to ensure
conducted by water sustainability of water and hygiene
committee initiatives
Expected Results Measures Indicators > Community contributes 5% of
A. Water supply and quality A. Number of water supply/treatment A-D. Post construction cost of the system
infrastructures structures built Implementation > Community is willing/able to
B. Catchment protection B. Measurable area of protected report/post properly maintain the water system
mechanisms catchment around the source implementation public (contingent on fee collection)
Outputs

C. Water committee established C. Number of water committee health household > Water committee remains intact
D. Community members washing meetings per quarter/year etc. survey
hands, not grazing cattle near D. Percentage of population trained in C. Water committee
catchment area and other sanitary sanitation practices and health documents/reports
practices education activities D. Health and water
committee training logs
and notes
Activities Inputs and Resources Indicators > Establishment of a robust project
1. Baseline health survey 1-2. Baseline health survey 1-5. Pre/Post team with skills/expertise necessary
conducted/analyzed, site mapping developed/land survey recorded, assessment trip reports to address all aspects of a water
complete, water sampling results water quality tests taken. and supporting project
analyzed 3. Necessary materials documentation/data > Individual sub groups must develop
plan for water system, public health &
Activities

2. Water supply system design identified/suppliers in place 6. Budget Documents


3. Materials purchased/driller & 4. Public health education curriculum education and fundraising.
additional labor in place developed
4. Community members 5. External partners identified
educated/trained in public health 6. Project fundraising efforts
practices successful
5. Partnership agreements signed
6. Financial support for project in
place
Instructions – PART II
GALLERY WALK … W/ A TWIST
 For 30 mins., roam around and browse the other groups’
outputs.
 Write any comment, suggestion or compliments on the box
below their output.
 No need to write your name or school.
 NOTE: Refrain from writing derogatory remarks. Be
objective as possible 

Potrebbero piacerti anche