MUMBAI METRO RAIL LINE 3

UGC-03
MUMBAI METRO RAIL CORPORATION LTD

BIM PROGRESS REVIEW


28-06-2019

1
CONTENTS
• CONTEXT
• DESIGN AND BIM STATUS
• HOLDING UP POINTS
• MINIMAL VIABLE BIM MODEL
• WALKTHROUGH

2
CONTEXT
UGC-03

U R B A N FA B R I C O F 5 K M C O R R I D O R
BETWEEN PROPOSED MUMBAI
C E N T R A L A N D W O R L I M E T R O S TAT I O N
I S C H A R A C T E R I Z E D M A I N LY B Y
MODERN ARCHITECTURE. TREND OF
TRANSITION FROM COLONIAL
A R C H I T E C T U R E O F S O U T H B O M B AY TO
MODERN ARCHITECTURE OF WORLI IS
C L E A R LY S E E N T H R O U G H T H I S
S T R E TC H O F . F I V E S TAT I O N S .

B I M R E V I E W- 0 4 - 0 2 - 2 0 1 9
SUBMISSION STATUS
DESIGN & BIM STATUS

CIVIL PACKAGE
DISCIPLINE Plumbing & Fire
Architecture Structure Electrical
fighting
STATION DD Model Submitted DD Model Submitted DD Model Submitted
DD Model Submitted
MUMBAI 17/06/2019 / R0
17/06/2019 / R0 18/06/2019 / R0 18/06/2019 / R0
CENTRAL
STATION DD Model Submitted DD Model Submitted DD Model Submitted DD Model Submitted
MAHALAXMI 17/06/2019 / R0 17/06/2019 / R0 18/06/2019 / R0 18/06/2019 / R0

STATION
DD Model Submitted DD Model Submitted DD Model Submitted DD Model Submitted
SCIENCE 17/06/2019 / R0 17/06/2019 / R0 18/06/2019 / R0 18/06/2019 / R0
MUSEUM
STATION
ACHARYA DD Model Submitted DD Model Submitted DD Model Submitted DD Model Submitted
ATREY 17/06/2019 / R0 17/06/2019 / R0 18/06/2019 / R0 18/06/2019 / R0

CHOWK
STATION DD Model Submitted DD Model Submitted
DD Model Submitted DD Model Submitted
17/06/2019 / R0 17/06/2019 / R0
WORLI 18/06/2019 / R0 18/06/2019 / R0

IN PROCESS. WILL BE SUBMITTED BY 26/07/2019


TUNNEL IN PROCESS. WILL BE SUBMITTED BY 12/07/2019

4
SUBMISSION STATUS
DESIGN & BIM STATUS

SYSTEMS
DISCIPLINE 05 TVS & 06 RS
01 AFC 02 STPT 03 OCS 04 PSS
ECS
STATION
MUMBAI X X X X X X
CENTRAL
STATION
X X X X X X
MAHALAXMI
STATION
SCIENCE X X X X X X
MUSEUM
STATION
ACHARYA
X X X X X X
ATREY
CHOWK
STATION
X X X X X X
WORLI
TUNNEL X X X X X X

5
SUBMISSION STATUS
DESIGN & BIM STATUS

SYSTEMS  THIS STATUS IS FOR SEPARATE


DISCIPLINE
07 LIFT 08 Escalator 09 SSS SUBMISSIONOF BIM MODELS AS
STATION THE PROSEDURE SET BY GC.
MUMBAI X X X
CENTRAL  ALL OUR DRAWINGS (FROM PD TO
STATION DD)WERE ALREADY EXTRAXTED
X X X
MAHALAXMI FROM BIM PROCESS .
STATION
SCIENCE X X X
MUSEUM
 ARCHITECTURE DD IS ALREADY
CLOSED AND SAME MODELS
STATION
ACHARYA WERE PART OF THE DD AS
X X X SOFTCOPY.
ATREY
CHOWK
STATION
X X X
WORLI

TUNNEL X X X

6
HOLDING UP POINTS
ARCHITECTURE

Public Area Finishing and Above Ground Structures shown in the models is indicative and will be finalised
after receiving finishing guidelines from GC.

MEP

1. CSD model will be finalised after receiving inputs from SWCs in BIM format.
2. MEP model for tunnel will be submitted by 30/07/2019.

TUNNEL

Tunnel Model is completed and integration with stations is in process. Complete Integrated model will be
submitted separately.

7
MINIMAL VIABLE BIM MODEL
BIM MODELS
STATION PLUMBING & FIRE
ARCHITECTURE STRUCTURE ELECTRICAL
FIGHTING
01 AFC

02 STPT

03 OCS

04 PSS

05 TVS & ECS

06 RS

07 LIFT

08 ESCALATOR

09 SSS

8
WALK THROUGH

9
THANK YOU

10