 India has a road network of over 5,903,293 kilometers
 The second largest road network in the world
 Indian roads can be broadly classified in four categories as
shown in the table below.

1 National Highways/Expressways 66754 km


2 State Highways 128000 km
3 Major and other District Roads 470000 km
4 Rural Roads 2650000 km
 The Department of Road Transport and Highways under the
Ministry of Shipping, Road Transport and Highways (MOSRTH) is
responsible for construction and maintenance of National Highways
(NH)
 The responsibility for development of other categories of roads rests
with the states/Union Territories.
 National Highways Authority of India (NHAI)
 National Highways Development Project (NHDP)
An Innovative Solution for Embankment Slope Protection

Location Sambalpur – Rourkela, Odisha


Principal Client Odisha Works Department
Client Larsen & Toubro Sambalpur
Rourkela Tollway Limited (L&T
SRTL), a 100% owned SPV of L&T
IDPL
Application Slope erosion protection with
StrataWeb®
 Side slope erosion has always been an issue for highway
embankments. Especially during the monsoons, these slopes pose
a challenge.
 The Larsen & Toubro-IDPI SPV, constructing its 163km long
Rourkela-Sambalpur toll-way road project in Odisha faced this
issue.
 The project is along the state highway SH-10, extending the original
two lanes to four lanes.
 Odisha, a state on the East Coast of India is known for high
intensity rains for long durations. The embankment slope lengths
were as long as 16 metres with a slope gradient of 2H : 1V
Initial Stage StrataWeb
The Solution

 Stone pitching is a conventional erosion control technique for


embankment slopes. stone procurement provokes environmental
concerns
 It requires skilled workmen
 With these factors and the new government policies emphasizing
green highways with low carbon footprint, the StrataWeb® system
is the best option.
Installation

StrataWeb
Advantages

 5 times faster installation due to ease of StrataWeb® transportation


and use of locally available and cheaper materials
 Saves up to 50% of the cost vs. stone pitching
 Increased life span with lower maintenance
 Environment friendly, low carbon emission
 A very good-looking green highway.
Total Duration Of Training

May

Technical Training - 16 Hrs


Doubt Clarification- 0 Hrs

June
Technical Training - 40 Hrs
Doubt Clarification- 32 Hrs
July
Technical Training - 112 Hrs
Doubt Clarification- 0 Hrs
Product Information Session

Revit Structure + Etabs -Anna Nagar, calicut

Revit Architecture + Structure - Tiruvella,mavellicara,kottyam

Potrebbero piacerti anche