Inspection’s
• Weekly inspection of Tower Crane, RMC plant, Cranes, Lifting
Equipments, Concrete Pumps, Electrical Equipments.
Electrical Safety
Regularly inspection of RCCB to find out they are properly
working or not.
Regularly Earthing Resistance Value Checking .
Check for water accumulation around electrical installation like
meter room, main distribution board, DG sheds, etc., if required
elevate the level for safer approach.
Do not touch any installation in or near meter room if the wall is
wet.
Reinforce all sub-distribution boards with further supports /
anchors to avoid board falling.
Inspect installed ELCB & check earth resistance prior to
monsoon.
Ensure all temporary DB’s are provided with MS enclosures,
grounding & continuity of earthling.
EHS MANSOON PLAN
Electrical Safety
Provide water proof covers over all distribution & sub-
distribution boards.
Rain protection - raincoat / umbrella, gum-boot for all
electrical personnel.
Check all the temporary joints and make them waterproof to
the extent possible and never allow any temporary joint in
water.
Poles installed for over head cabling - make them rigid / more
stable.
Do not use any Halogen at site during this period.
Avoid / arrest water leakage in all offices / buildings as this
may cause electrical faults / short-circuit in the electrical
system.
EHS MANSOON PLAN
Vehicle And Equipment
Park all construction equipments in a stable ground & at nights.
Check all the vehicles entering into the site, check thetyre
conditions (the tread grooves should be of minimum 1.5mm in
all the tyres. Look for sidewall cuts in tires, if so, replace them
immediately).
Ensure proper functioning of the break system and wipers, signal
light, tail lamp and reverse horn are in working condition.
No matter how well your vehicle is serviced, nothing substitutes
your being alert and careful while driving.
Wet-weather driving demands gentle use of all the main
controls - steering, clutch, brake and accelerator - and a larger
allowance for errors and emergencies.
EHS MANSOON PLAN
Ensure all the water drainages are not choked and free water is
ensured.
• All the lifting operation stopped for windy condition.
• Ensure Safe approaches for cranes, vehicles etc.
• Inspect all scaffolding materials, shuttering material, waste spoil
particular on construction site and shoring daily by the
competent person to avoid any incident on site.
• Ensure the all Excavated pit it is safe to work then allow to
worker to work inside the pit.
EHS MANSOON PLAN
Height Work