The project road starts at Potin in Lower Subansiri district and ends
at Pangin (Siang District).
Existing road is mostly Single/Intermediate lane having 3.5 - 5.5m
carriageway .
The entire Project Road mostly falls in hilly terrain and the existing
alignment generally follows the natural contours of the hills.
There are nos. of sub-standard curves along the existing alignment
having radius lesser than 30 m.
Existing RoW: 14-90 m.
PRE-CONSTRUCTION ACTIVITIES
Reconstruction/New
Construction
BC: 40 mm
DBM: 85 mm
WMM:250 mm
GSB: 200 mm
TCS
TCS TCS 1 TCS 2 TCS 3 TCS 4
Plain
One side Built up
TCS Type Area/Open Box Cutting
cutting/Hill Section *
area
Carriageway 7m 7m 7m 7m
Paved
- - - 2x1.5 m
shoulder
Granular 2 x 2.5 m
2.5+1.6 m 1.6+1.6 m -
Shoulder
* In built up area CC drain has been proposed & 100 mm paver block proposed in
between CC drain & edge of black top
Details of CD & Protection works
Length (km)
44.35 33.61 39.61 46.03 43.07 40.39 37.87 29.33 37.14 351.38
Existing
164 135 139 248 262 245 226 221 187 1827
Recons.
Culverts 160 123 112 236 222 194 139 181 161 1528
New Cons.
60 56 56 22 24 37 16 4 36 311
Major
1* 0 1 2 1 2 2 1 0 10
Bridges Minor
3 2 2 4 4 3 5 2 8 33
Total
4 2 3 6 5 5 7 3 8 43
Cover (km)
17.42 15.40 15.06 3.12 19.4 11.88 6.78 3.88 16.98 109.92
Drain
Open(km)
45.37 30.259 40.82 59.22 42.6 44.27 59.75 37.32 45.31 404.92
Retaining
2.972 3.527 3.294 3.545 3.466 5.265 2.675 4.365 3.15 32.26
Protectio wall (km)
n work Breast wall
6.61 6.59 7.880 9.44 6.91 5.79 12.31 8.79 13.34 77.66
(km)
Abstract Cost
Cost as modified in Per Km cost
Cost proposed by
Chainage(km) Ministry (Rs. In Cr/km)
Package PWD) (Rs. In Cr)
Km (Rs. In Cr)
No.
From To Civil Cost TPC Civil Cost TPC Civil Cost TPC
I 0.000 44.350 44.350 403.16 481.70 347.10 404.26 7.83 9.12
III 77.950 117.560 39.610 357.1 425.7 362.41 422.09 9.15 10.66
VII 247.050 284.920 37.870 448.95 535.28 481.85 561.20 12.72 14.82
VIII 284.920 314.250 29.330 315.10 375.56 299.04 348.29 10.20 11.87
Length
44.4 33.6 39.6 46 43.1 40.4 37.9 29.3 37.1 351.4
(Km)
Earth Work 65.30 68.11 80.21 138.97 88.15 94.82 199.90 49.38 52.35 837.19
Pavement
100.43 77.82 94.71 101.01 104.08 91.32 85.04 66.38 81.51 802.3
Work
Culverts 66.81 50.25 46.37 68.70 60.95 59.90 44.44 47.06 42.41 486.89
Protection
59.44 56.97 59.82 71.58 58.50 70.18 77.18 79.79 85.16 618.62
Works
Drain 35.27 27.61 30.25 23.34 36.40 29.05 26.76 15.42 40.16 264.26
Bridge 11.96 6.57 42.21 55.11 30.77 63.94 40.38 34.47 29.62 315.03
Civil Cost 347.10 294.5 362.41 466.94 387.49 418.4 481.85 299.0 339.01 3396.8
TPC 404.26 343.0 422.09 543.84 451.30 487.4 561.20 348.29 394.8 3956.2
TCS IN OPEN AREA
TCS IN ONE SIDE HILL CUTTING
SECTION
TCS IN BOX CUTTING SECTION
TCS IN BUILT UP SECTION
TCS AT BRIDGE LOCATION
Photo Gallery
Poor Condition of Road Presence of Pot Holes
Void created on Bridge Deck Crack and Uneven surface on Bridge Deck
Subansri Bridge Repairs Undertaken Re-plating of Subansri Bridge Deck