Construction of 2 lane road from km 0/000 -351/383

(Potin-Pangin section ) of NH-13 in Arunachal


Pradesh under Arunachal Pradesh Package of roads
and highways of SARDP-NE on EPC Mode
Salient Features of Project
Existing Length (in km) : 407 Km
Proposed Length (in km) : 351.383 Km
No. of Package : The entire project has been divided into
9 packages
Districts cover : The project covers six district namely Lower
Subansiri, Kamle, Upper Subansiri, Lepa Rada ,
West Siang & Siang
Bridge : Major Bridge: 9 nos.
Minor Bridge: 33 nos.

Culvert : Reconstruction: 1528 nos.


New Construction: 311 nos.
NHs IN ARUNACHAL PRADESH
• 13 nos. National Highways aggregate length of 2537 km passes
through Arunachal Pradesh. The present proposal is part of NH 229
(new 13). NH 229 is popularly known as Trans Arunachal Highways.
It originates at Tawang in Arunachal Pradesh, passes through
Dirang, Bomdila, Nechepu, Seppa, Hoj, Potin, Pangin, Pasighat,
Meka, Alubari, Namsai, Bardumsa Jairampur, Manmao, Changlang,
Khonsa, Longdin, Kanubari & ends at Bogibeel Rail Cum Road
Bridge in Assam. The entire stretch of Trans Arunachal Highways is
being developed to two lane under SARDP-NE
STATUS OF ONGOING PROJECTS
ON NH 229
Sr. Length Cost
Name of stretch Agency Progress
no. (in km) (Rs. in Crore)

1 Tawang to Nechipu BRO 232.5


2 Nechipu to Hoj MoRTH 252.21 1486.00 94.02%
3 Hoj to Potin PWD 19.06 165.11 100%
4 Potin to Pangin MoRTH 407 1985.00 2.13%
5 Pangin to Pasighat (Pkg IV, km 57.00 PWD 14.6 103.87 96.09%
to km 71.60)
6 Pangin to Pasighat (Pkg III, km 41.30 NHIDCL 17.12 247.44 70.01%
to km 57.00)
7 Pangin to Pasighat (Pkg II, km 28.00 PWD 12.75 115.85 100%
to km 41.30)
8 Pangin to Pasighat (Pkg I, km 0.00 to NHIDCL 28 299.66 90.12
km 28.00)
9 Pasighat to Bomjur (km 550 to km 613 BRO / 52
except Sisiri bridge & approaches) PWD
Cost
Sr. Agenc Length
Name of stretch (Rs. in Progress
no. y (in km)
Crore)
10 Pasighat to Bomjur (km 583.45 to km NHIDC 22.15 244.82 7.32%
595, balance section) L
11 Bomjur to Meka & Digaru to MoRTH 17.36 764.00 99.85
Chowkham (Dibang river bridge
system)
12 Meka / Roing– Korunu – Paya – BRO / 51 - Completed
Digaru PWD
13 Digaru to Chowkham via BRO 125 This section is bypassed
Tezu&Wakro on completion of Debang
Bridge system
14 Chowkham to Namsai BRO Completed
15 Namsai to Mahadevpur/Dirak BRO / 25 Completed
PWD
16 Mahadevpur to Buridehing / NHIDC 13.1 Completed
Bordumsa L
17 Buridehing / Bordumsa to Namchik / NHIDC 22.23 189.91 89.79%
Jairampur / Lalpul L
18 LalpulManmaoChanglang 68.3 305.49 40.93%
19 Changlang to Changlang / Tirap 18.27 172.75 65.33%
district boundary
Cost
Sr. Length
Name of stretch Agency (Rs. in Progress
no. (in km)
Crore)
20 Changlang / Tirap district NHIDCL 42.84 438.32 77.76%
boundary to Khonsa
21 Khonsa– Tissa -Longding PWD 42.5 276.74 48.05%
22 Longding to Kanubari NHIDCL 47.21 522.87 40.82%
23 Kanubari to Bogibeel Assam 63.40 268.08 67.39%
PWD
BACKGROUND
MoRTH has earlier awarded the project for construction of 2
lane road from Potin to Pangin, via Yachuli, Ziro, Daporizo, Aalong on
DBFOT (Annuity) Mode to M/s Potin - Pangin Highway Private Limited.
Concession Agreement was signed on 14.08.2012 & appointed date
was declared as 08.07.2014.
The project was initially delayed due historic delay in hand over the
land to concessionaire by the State Government. Even after handing
over the land, the Concessionaire did not take up the construction of
Project Highway & maintenance of existing road and failed to achieve
the targets given to them. Even after long persuasion through series of
meeting and letters, the concessionaire did not take up the work.
Finally the contract has been terminated on 15/11/2018.
Present proposal

 The project road starts at Potin in Lower Subansiri district and ends
at Pangin (Siang District).
 Existing road is mostly Single/Intermediate lane having 3.5 - 5.5m
carriageway .
 The entire Project Road mostly falls in hilly terrain and the existing
alignment generally follows the natural contours of the hills.
 There are nos. of sub-standard curves along the existing alignment
having radius lesser than 30 m.
 Existing RoW: 14-90 m.
PRE-CONSTRUCTION ACTIVITIES

Chief Secretary, Government of Arunachal Pradesh vide letter dated


26/12/2018 informed that 100 % encumbrance free land corridor (ROW)
for construction of 2 lane Potin-Pangin road is available. Further
Commissioner PWD, Itanagar, Arunachal Pradesh dated 26/12/2018
informed that Utility Shifting completed & Forest & Environmental
Clearance has been obtained.
PLAN & PROFILE

Alignment: Improvement has been proposed with in available RoW.


In most of the section it follow existing alignment except in bypass
location.
Horizontal curve: Horizontal curve in hill section has been
designed with minimum speed of 30 kph, however in hairpin bends
design speed of 20 kph has been adopted in accordance to in
accordance IRC:73-1980.
Longitudinal gradient: Maximum 6-7 % longitudinal gradient
has been adopted in the project stretch as per IRC:73-1980.
Pavement Design
 Traffic: Average traffic in the project zone varies from 60-190 CVD.
However pavement has been designed with following criteria in
accordance to IRC:SP:73-2018:
– Design life : 15 years
– Design CBR : 8%
– Design traffic : 20 MSA
 Crust Composition:

Reconstruction/New
Construction
BC: 40 mm
DBM: 85 mm
WMM:250 mm
GSB: 200 mm
TCS
TCS TCS 1 TCS 2 TCS 3 TCS 4
Plain
One side Built up
TCS Type Area/Open Box Cutting
cutting/Hill Section *
area

Carriageway 7m 7m 7m 7m

Paved
- - - 2x1.5 m
shoulder

Granular 2 x 2.5 m
2.5+1.6 m 1.6+1.6 m -
Shoulder
* In built up area CC drain has been proposed & 100 mm paver block proposed in
between CC drain & edge of black top
Details of CD & Protection works

Package I II III IV V VI VII VIII IX Total

Length (km)
44.35 33.61 39.61 46.03 43.07 40.39 37.87 29.33 37.14 351.38
Existing
164 135 139 248 262 245 226 221 187 1827
Recons.
Culverts 160 123 112 236 222 194 139 181 161 1528
New Cons.
60 56 56 22 24 37 16 4 36 311
Major
1* 0 1 2 1 2 2 1 0 10
Bridges Minor
3 2 2 4 4 3 5 2 8 33
Total
4 2 3 6 5 5 7 3 8 43
Cover (km)
17.42 15.40 15.06 3.12 19.4 11.88 6.78 3.88 16.98 109.92
Drain
Open(km)
45.37 30.259 40.82 59.22 42.6 44.27 59.75 37.32 45.31 404.92
Retaining
2.972 3.527 3.294 3.545 3.466 5.265 2.675 4.365 3.15 32.26
Protectio wall (km)
n work Breast wall
6.61 6.59 7.880 9.44 6.91 5.79 12.31 8.79 13.34 77.66
(km)
Abstract Cost
Cost as modified in Per Km cost
Cost proposed by
Chainage(km) Ministry (Rs. In Cr/km)
Package PWD) (Rs. In Cr)
Km (Rs. In Cr)
No.

From To Civil Cost TPC Civil Cost TPC Civil Cost TPC
I 0.000 44.350 44.350 403.16 481.70 347.10 404.26 7.83 9.12

II 44.350 77.950 33.600 327.16 390.93 294.54 343.04 8.77 10.21

III 77.950 117.560 39.610 357.1 425.7 362.41 422.09 9.15 10.66

IV 117.560 163.590 46.030 488.62 582.3 466.94 543.84 10.14 11.81

V 163.590 206.660 43.070 411.03 490.5 387.49 451.3 9.00 10.48

VI 206.660 247.050 40.390 427.56 509.06 418.49 487.41 10.36 12.07

VII 247.050 284.920 37.870 448.95 535.28 481.85 561.20 12.72 14.82

VIII 284.920 314.250 29.330 315.10 375.56 299.04 348.29 10.20 11.87

IX 314.250 351.383 37.133 359.36 428.73 339.01 394.84 9.13 10.63

TOTAL 351.383 3538.04 4219.76 3396.87 3956.27 9.67 11.26


Break up of Cost
(Rs. in Crore)

Package I II III IV V VI VII VIII IX Total

Length
44.4 33.6 39.6 46 43.1 40.4 37.9 29.3 37.1 351.4
(Km)

Earth Work 65.30 68.11 80.21 138.97 88.15 94.82 199.90 49.38 52.35 837.19

Pavement
100.43 77.82 94.71 101.01 104.08 91.32 85.04 66.38 81.51 802.3
Work

Culverts 66.81 50.25 46.37 68.70 60.95 59.90 44.44 47.06 42.41 486.89

Protection
59.44 56.97 59.82 71.58 58.50 70.18 77.18 79.79 85.16 618.62
Works

Drain 35.27 27.61 30.25 23.34 36.40 29.05 26.76 15.42 40.16 264.26

Bridge 11.96 6.57 42.21 55.11 30.77 63.94 40.38 34.47 29.62 315.03

Civil Cost 347.10 294.5 362.41 466.94 387.49 418.4 481.85 299.0 339.01 3396.8

TPC 404.26 343.0 422.09 543.84 451.30 487.4 561.20 348.29 394.8 3956.2
TCS IN OPEN AREA
TCS IN ONE SIDE HILL CUTTING
SECTION
TCS IN BOX CUTTING SECTION
TCS IN BUILT UP SECTION
TCS AT BRIDGE LOCATION
Photo Gallery
Poor Condition of Road Presence of Pot Holes

Absence of Valley Protection Pavement Failure


Land-sliding Road Edge Failure

Earthen Narrow Road Road Blockage due to hill-slide


Failed Pavement Water logging on Road

Pot Holes Unprotected Hill Side


Failure of Bridge Deck Multiple voids on Deck

Void created on Bridge Deck Crack and Uneven surface on Bridge Deck
Subansri Bridge Repairs Undertaken Re-plating of Subansri Bridge Deck

Subansri Bridge Repair in progress Replacing Faulty Deck Subansri Bridge


Tamin Bridge Repairs Undertaken Replacement of Tamin Bridge Cables

Tamin Bridge Repair in progress Replacing Tamin Bridge Truss Members