Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
BY RISHABH JAIN
INTERACTION WITH LP SIR
VALUEING TIME
CONSISTENCY
PERSISTENCY
RESPECT
COMMITMENT
INTEGRITY
2
COLLEGE TO CORPORATE
The session was taken by Ankit
Tiwari sir, sir taught the
following most important things.
Be comfortable in your
professional life.
Maintain Balance between the
professional life and personal
life.
Don’t wait for the right time,
the opportunity as soon as it
comes.
3
UNDERSTANDING ISGEC BUSINESS AND
PRODUCT LINES
Mr. Raghunath sir had discussed about ISGEC businesses and also
given the idea of marketing.
He taught us about the terminology that is used in marketing.
UNDERSTANDING ISGEC BUSINESS AND
PRODUCT LINES
• Process equipment • Boilers
• EPC projects • Air pollution control
equipment
• Steel casting
• Iron casting
• Export business had been started from 1996 and weightage of export is 20% of total
turnover.
6
INTRODUCTION TO ENGINEERING
SERVICE CENTRE
The session was delivered by Mr. K Viswanathan Sir (ESC Head).
He told us that how the orders are executed. There are two stages of orders
• PRE-ORDER
o Proposal Engineering
• POST-ORDER
o Process Engineering
o Mechanical Engineering
o Structural Engineering
o Piping Engineering
o Instrumentation Engineering
o Electrical Engineering
7
INTRODUCTION TO
EPC BUSINESSES
ENGINEERING
PROCUREMENT
.
CONSTRUCTION
8
POWER OF POSITIVE ATTITUDE
People can judge us in Attitude tells
just 30 secs. So we everything about
should always have the person without
positive body saying anyword.
language
12
SITE PRACTICES GENERAL
Mr. Naveen mittal sir had discussed
ERECTION FRAMEWORK about Erection process and construction
process as well as.
One boiler needs 40,000 tonnes of
steel
Construction contributes 6-9% of GDP of
develop country
Construction is completed through the
following phases:
Initiation Phase
Planning Phase
Execution Phase
Project Closure
13
14
NEGOTIATION TO WIN
Plan to resolve Never assume a
differences fixed pie.
Treat people as they Don’t
wanted to be underestimate
treated power..
• This industry purchases raw material which is called “INGOT” and give them desired
shape by some standard processes (like: forging, machining).
• There were two presses used to give the desired shape to the heated materials
o One was having 10 tonne of capability
o Second one was having 100 tonne of capability
16
VENDOR VISIT
FORGING MACHINING
CASTING
17
70 MINUTES IN AN HOUR
Break the task into PICESES
Work according to a
and then take actions
particular schedule to save
accordingly.
time and prioritize the
activities according to their Promise and give REWARD
importance to yourself.
18
SITE VISIT The plant was sugar power plant in Mohiuddinpur
(U.P.).
19
THANK YOU!