Sei sulla pagina 1di 1

ABOUT:

• THE ORBIT CORPORATE PARK IS SMARTLY CONNECTED TO EVERY MODE


OF TRANSPORT.
• CNSTRUCTION: POST TENSION SLAB,RAISED TOILETS(NO SUNK).
• FAÇADE MATERIAL: STRUCTURAL GLAZING (UNITIZED SYSTEM) AND ACP
SHEETS.
• CENTRALLY DESIGNED CORE.
• G + 18 STRUCTURE , 13TH FLOOR IS REFUGE FLOOR.
• 8 UNITS ON EACH FLOOR, WITH TOILET FACILITIES.
• 12 FEET CEILING HEIGHT FOR EVERY FLOOR.
• PROVISIONS FOR SEGMENTS LIKE CONFERENCE HALL, MINI THEATRE.
• 3 HIGH-SPEED ELEVATORS.
• 1 LAKH LITRES WATER IN UNDERGROUND TANK AND 50,000 LITRES WATER
IN OVERHEAD TANK.

FIRE ESCAPE ROUTE BASEMENT FLOOR PLAN GROUND FLOOR PLAN

ARCHITECT: DIMENSIONS ARCHITECT


SITE AREA: 1 ACRE
NO. OF FLOORS: 1 BASEMENT+19 FLOORS
NO. OF PARKING: 140 CARS
COMPLETION YEAR: 2012

LOCATION:
•THE ORBIT CORPORATE PARK
•PLOT - 15, SECTOR - 18, VASHI, NAVI
MUMBAI, MAHARASHTRA 400703.

• 2M WIDE STAIRCASE.
• 12 STAIRS/FLIGHT. TYPICAL FLOOR PLAN TYPICAL FLOOR PLAN TYPICAL FLOOR PLAN REFUGE FLOOR PLAN
• 13TH FLOOR- REFUGE FIRST FLOOR PLAN 2ND , 5TH , 8TH , 11TH , 14TH , 17TH 3RD , 6TH , 9TH , 12TH , 15TH , 4TH , 7TH , 10TH , 16TH FLOOR 13TH FLOOR
FLOOR. FLOOR 18TH FLOOR
• SMOKING AREA FREE OF
FSI.

AREA STATEMENT SQ.M


A. AREA OF THE PLOT 3074.5
B. PERMISSIBLE F.S.I. 1.5
C. PERMISSIBLE BUILT UP AREA 4611.75
D. TOTAL BUILT UP AREA 4604.85
E. PROPOSED F.S.I. 1.497
F. BALANCED AREA 6.896
G. TOTAL COMMERCIAL AREA 4604.85
H. BASEMENT AREA 2666.30
I. STILT GROUND AREA 686.79
J. STILT FIRST AREA 410.01
K. TOTAL AREA 3763.11

SECTION
NORTH RAVINA PATIL.
SURABHI ROKADE.

THE ORBIT CORPORATE PARK,VASHI PRANALI SAGARE.


KAJOL SANAS.
NILAM SONAWANE.

Potrebbero piacerti anche