Sei sulla pagina 1di 15

Y  

  
 
   

   

÷ Thar coal reserves of Sindh are 850 TCF.


÷ They are worth of 25 trillion US dollars.
÷ Just 2% of that reserves can produce 20000 MW
electricity for next 40 years.
÷ It would cost 5.67 per unit where as existing cost is
9.27.
÷ Project Requires Just cost of 210 Billion Rupees Initial
Investment which generates 8000 mega watts.
÷ In addition, coal is a versatile fuel, it can be used as a
solid fuel or it can be converted to a gas to replace
expensive imported fuels.
Where from we get Finance?
÷ As in previous records China offered Pakistan
Government to finance on that project but they neglect
due to the giants of oil producers.
÷ But we negotiate to the oil importers country and they
agree on one point that we only produce or generates
electricity to fulfill the short fall.
÷ Our company is getting this huge finance from the
neighbor country China because they always want to
help our country for the sake of maintain good
relationship.
Countries already taking advantage of
this Natural Resource
÷ South Africa 94%
÷ Poland 93%
÷ PR China 81%
÷ Australia 76%
÷ Israel 71%
÷ Kazakhstan 70%
÷ India 68%
÷ Czech Rep 62%
÷ Morocco 57%
÷ Greece 55%
÷ USA 49%
÷ Germany 49%
Total World Electricity Generation
through different sources.
  
÷ Electricity from coal is the electric power
made from the energy stored in coal.
Carbon, made from ancient plant material,
gives coal most of its energy. This energy
is released when coal is burned.
We use coal-
coal-generated electricity
for
÷ heating,
÷ cooling,
÷ cooking,
÷ lighting,
÷ transportation,
÷ communication,
÷ farming,
÷ industry,
÷ healthcare,
÷ and much more!
Ô    
÷ A machine called a pulverizer grinds the coal into a fine powder.
÷ The coal powder mixes with hot air, which helps the coal burn
more efficiently, and the mixture moves to the furnace.
÷ The burning coal heats water in a boiler, creating steam.
÷ Steam released from the boiler powers an engine called a
turbine, transforming heat energy from burning coal into
mechanical energy that spins the turbine engine.
÷ The spinning turbine is used to power a generator, a machine
that turns mechanical energy into electric energy. This happens
when magnets inside a copper coil in the generator spin.
÷ A condenser cools the steam moving through the turbine. As
the steam is condensed, it turns back into water.
÷ The water returns to the boiler, and the cycle begins again.
x   

÷ x    First of all we investigate not as


much because as this thing is very clear that
Pakistan is facing a short fall of approximately 5000
MW of electricity supply, so we just push our idea
ahead.
÷  As we know that Pakistan is very
rich with our required raw material (coal) and our
project is to produce 8000 MW electricity that
covers the time gap of further shortage and
because the project is megaproject, it requires time.
x   

÷ x   We know that energy crises are going


on, so there is no need to take further time. And
because it is megaproject so there are more
barriers for entry.
÷ x    We start our
project, now its time to build infrastructure because
it is practical and many countries are working and
getting benefits form it.
÷  When this will complete we provide
electricity to the shortage areas with the help of
that areas electricity provider.
·  

÷ x
  ! 
 There is load sheding going
on in Pakistan and everyone is our stake holder like
Government, general public and firms.
÷ À

       Our
project is mega project in the country and because
this is for one economy that·s why it·s Micro in
nature.
÷ 
 Our idea is not imaginary.
÷  ! 
 It is applied almost in all
developed countries.
÷   ·  Our design is based on
the plants are working in different countries.
·  

÷ !"  # ! 


 Our plan is
to complete the plant in 2 to 3 years.
÷ "  $x
  
 % Complete
plant is the key performance indicator for our
project.
÷ Ô   We take expertise of
our neighbor country China because they finance the
project and we have our graduates which are creative
and smart workers.
÷ &   When project is to be completed
it will be ready to provide electricity and solve the
energy problem.
÷  ' 
·  As it started we will
see what improvements are to be required.
   

÷ As Pakistan faces short fall of electricity


to just fulfill that short fall our company
work on that project and we start our
operational activities like generating
electricity after the completion of the
project then we supply electricity with
the same infrastructure like the existing
one, just we distribute it from the grid
station according to the requirement.
Y uestionµ

Potrebbero piacerti anche