Sei sulla pagina 1di 20

Presented by:

ENP. JONATHAN A. LITANG


Background
The Siargao Climate Field School for Farmers and Fisherfolks (SCFSFF)
is a one-stop climate adaptation initiative provided by the Local
Government Unit of Del Carmen (LGU – Del Carmen in partnership with
the Surigao State College of Technology (SSCT) and other key agencies
and sectors to bring the government and Non-Governmental
Organizations’ (NGOs) initiatives directly to the farmers and fisherfolks
creating a climate-smart and resilient agri-fisheries community.

The DENR through the Environmental Management Bureau (EMB) has


issued Environmental Compliance Certificate No. ECC-OLR13-2018-
0164 on November 8, 2018 for the establishment of the SCFSFF.
Key Messages
Mayor Coro’s point on establishing
the Siargao Climate Field School
during the ICSC, MDFO and PSF Site
Visit on October 20, 2016

“Our next target is food security since


most of the local government units
keep on preparing for disaster, but not
for food security. The economic value
of the climate change adaptation
programs enable our municipality and
constituents to face the climate
impacts vis-à-vis food security. “

Hon. Alfredo M. Coro II


Mayor of the Municipality of Del Carmen
SCFSFF MILESTONES

Submission of
requirements DBP Assessment
Needs Assessment Submission of stated in the Aide MOA signing for Second Tranche
with CSOs Proposal at PSF Memoire with the PSF Board. Request
June to December 2015 January 5, 2016 March 29, 2017 May 24, 2019
March 7, 2018
2015 2016 2017 2018 2019
December 2, 2015 August 30, 2016 November 11, 2017 November 27, 2018
First draft of Project Conditional Full Approval of Authorization to
Proposal Approval from PSF SCFSFF from the Release First Tranche.
PSF Board
The Five (5) Main Components

Construction of the Building Installation of Solar Panels Purchase of Equipment Capacity Building Conduct of Classes and Monitoring

Climate Detection Demo Farm Livelihood an Financial


Agro-Met Facility
and Adaptation Multiplier Management
Weather Forecasting Smart and precision Each year, a new A group project will be
lectures and monitoring agriculture will be demo farm will be introduced with a seed
include localized introduced introduced in a host capital for each
materials barangay approved project.

Photo Credits: AUO Tainan Solar Panel Plant


Brief Overview on the Construction Progress
After the issuance of the Environmental Compliance
Certificate from the DENR-EMB, the construction was
started on November 6, 2018. From there, 19.9% was
completed.

On January 29, 2019, a total of 37.17% was


constructed. However, the project’s progress slowed
down since the LGU – Del Carmen failed to pay the
billed amount due to non-issuance of authorization for
the DBP from the PSF. The third billing is already
drafted by the Kodus Construction, Inc., but there is
no authorization yet from the prior requests to
disburse the funds.

There is a failure to purchase the equipment due to


one primordial concern – where to stock the
equipment with full care w/o the SCFSFF facility.
Establishment of With the current status, it can be predicted that the
SCFSFF building establishment will not meet the target which s due on
September 2019, thus a new timeline will be sought.
w/ solar panel
Contract Agreement
Accomplishment Report

37.17%
For release
of Second
Tranche
Issues and Concerns
Issue No. 1 Issue No. 2
Notes: Notes:
On Required
On Release of Funds The LGU – Del Inasmuch as the
documents LGU – Del Carmen
per Tranches Carmen wants to
maintain its lead as by the PSF would try to reach its
one of the country’s target for the
• Slows down the Gawad Galing Pook • BAC sticks on RA implementation of
construction awardee especially 9184 the SCFSFF, the
on being a current process is
• Affects the timeline of • Local PIMU and
transparent and with slowing it. The
the construction and PSF PIMU are
good financial process is
the project different
governance local overlapping and
• Inflation rate catches up government unit. • No definite listing repetitive. LGU has
every delay of documents to its own PIMU, COA
On this regard, the comply is also monitoring,
• Affects the LGU wish to request PSF is also doing
performance of the LGU • PSF Secretariat is
the PSF Team to the same and the
not pro-active
enhance or abolish documents required
• Affects the timeline of the current process • Updates from PSF are also the same.
other component on the release of is passive
funds.
Implementation Timeline
MISSION 5
Start of Class on

WAYS January 2020

FORWARD MISSION 4 Completion of the Purchase of equipment


on November 2019

Completion and Publication MISSION 3


of manuals on October

Capacity building on
MISSION 2
August 2019

Completion of the
SCFSFF building on MISSION 1
September 2019
Expansion of Demo Farm

Not included in the


2019 – 2020 budget of
SSCT

CALL FOR
ACTION
Food Innovation

ICT
Designated demo farm area
REVISITING OF POs, LGUs, ACADEME, NGOs SYSTEM (PLANS)
DUE TO INDIVIDUAL IMPLEMENTATION OF MULTIPLIER
FARMS
Other
AGREA
Partners
LGU –DC

SMILES Other
SARAI BFAR
Care Inc. LGUs
SCFSFF

SSCT
Other
Academic
CALL FOR
Institutions ACTION
Legend:
Most Related
Supervised
SIKAT Related
POs
Less Related
Least Related
Crops Production Retooling
Other LGU
LGU –DC Demo Farms
Demo Farm SIKAT
AGREA

BFAR
SSCT
SCFSFF
MODECE
RA CALL FOR
PGSDN
Demo Farm SARAI
ACTION
SMILES Legend:
Care Inc. Most Related
Related
Less Related
Least Related
Animal Production Retooling
Other LGU
LGU –DC Demo Farms
Demo Farm SIKAT
AGREA

BFAR
SSCT
SCFSFF
MODECE
RA CALL FOR
PGSDN
SARAI
ACTION
Demo Farm
SMILES Legend:
Care Inc. Most Related
Related
Less Related
Least Related
Fresh Water and Marine
Production Retooling
Other LGU
LGU –DC Demo Farms
Demo Farm SIKAT
AGREA

BFAR
SSCT
SCFSFF
MODECE
RA CALL FOR
PGSDN
SARAI
ACTION
Demo Farm
SMILES Legend:
Care Inc. Most Related
Related
Less Related
Least Related
ENHANCEMENT OF THE
AGROMET FACILITY

Other LGU
LGU –DC
Demo Farms
Demo Farm
AGREA
SIKAT

SSCT BFAR
SCFSFF
MODECE
RA
CALL FOR
PGSDN
Demo Farm
ACTION
SARAI
SMILES Legend:
Care Inc. Most Related
Related
Less Related
Least Related
RETOOLING AND INVENTORY OF VECTOR –
BORNE DISEASES

Other LGU
LGU –DC
Demo Farms
Demo Farm
AGREA
SIKAT

SSCT BFAR
SCFSFF
MODECE
RA
CALL FOR
PGSDN
Demo Farm
ACTION
SARAI
SMILES Legend:
Care Inc. Most Related
Related
Less Related
Least Related
Recommendations:
The Local Government Unit of the Municipality of Del Carmen strongly recommends the
following:

1. Abolish the “per tranche” type of release, after all, 100% of the funds are already in the DBP.
Same process with the other funding agency where funds are deposited in the DBP must be
followed to meet the new target in completing the building on September 2019.
2. For clarity, maybe w can have unified detailed list of documents for submission to the PSF.
3. Maybe we can have a quarterly visit of the PSF Secretariat to address the queries and issues
and at the same time part of the evaluation and monitoring process.
4. Funds for the purchase of equipment must be release in full to save logistics and avail some
discounts to lessen the effect of inflation rate.
5. Retooling of some implementation strategies of the other components since other funding
agencies are already implementing the same ahead of the SCFSFF due to the delay of the
SCFSFF implementation.
SALAMAT
DIJO HUROT!!!

Potrebbero piacerti anche