Title Unit Particulars
Project Town Name KALA AMB

District, State Name SIRMAUR (H.P.)


AMI for Industrial & Outage Management with
Proposed Smart Grid Project Application
Peak Load Management
Total Area of Coverage Sq. km 170

Total Population (as per 2001 census) No. 25240


Total Number of Offices including Regional,
No. 4
Circle, Division, Sub-division etc.
Number of Metered Consumers No. 7601

Number of Unmetered Consumers No. 0

Residential No. 5749

Commercial No. 862

Industrial No. 561

Agricultural consumers No. 198

Others No. 231


2
Title Unit Particulars
Annual Energy Input of FY 2010-11 MUs 543.54

Annual Metered Energy Sales of FY 2010-11 MUs 533.58

Annual Assessed Energy in FY 2010-11 MUs 533.58

Total Connected Load MW 296

Billing Rs. Cr. 199.38

Revenue Collection Rs. Cr. 199.35

Collection Efficiency % 99.98 %

AT&C Loss in the System % 1.86 %

6.30 PM – 9.30 PM Winter


Peak Hours duration
7 PM - 10 PM summer

3
Title Unit Particulars

Power Transformers for project area


132/11 KV No. 1 x 31.5 (31.5 MVA)
132/33 KV No. 2 x 31.5 (63 MVA)
33/11 KV No. 2 x 10 (20 MVA)
Distribution Transformers in project area
25KVA No. 25
50KVA No. 3
63KVA No. 15
100KVA No. 23
200KVA No. 2
250KVA No. 9
400KVA No. 4
Total Number No. 82
Total Capacity KVA 7645

4
Title Details
Automated feeder switches None

Automated capacitors Manually operated at 33 & 11 KV level

Automated Regulators None at Feeder level


Feeder monitors None (Only MFMs)

Remote fault indicators None


Transformer monitors(Line) None
Smart relays Partial (Numerical Relays, O/C & E/F Only)
Fault current limiter None
Other devices Auto-reclosers at 4 consumers (33 KV)
AVR at one 33/11 KV Transformer,
Voltage Management Measures provided Rest all Power Transformers with OLTC

5
 AMI for all Industrial, Commercial, & other Consumers (except Domestic
and agricultural consumers) including 100% DTRs and Ring fencing of
project area (4 nos. Import Export points – 33KV & 11 KV))
 Demand Side Management & Demand Response Management System
(Direct Load Control – in Ph-II)
 GIS Based OMS – Additional functionalities for Outage, Customer
Complaints & Work force management system
 Distribution Management System to reduce losses and down time and
improve loss of revenue due to un-served consumers
 Integration of these systems with each other based on their logical data
exchange requirements based on standards and also Integration of
proposed systems with CRM and MBC, ERP, GIS and other business
process automation
 Training on the deployed technologies – Class room, on-site and existing
installations elsewhere in the world
 `Consumer Training
S. No. Item Description Total Price (Rs.)

1 Smart Meters & AMI System 4,71,13,000


2 Substation Automation for 1x132 KV S/S, 71,00,000
1 x 33 KV S/S
3 Remote Controlled LBS and FPIs (11 KV) 1,57,50,000
4 TMUs for 100 nos. DTRs 1,38,00,000
5 Control Center Set-up 14,19,07,000
6 Trainings & Customer Outreach programs 1,15,00,000
Sub total 23,71,70,000
7 Contingency and O&M charges 14%) 3,32,03,800
8 Civil infrastructure including furniture etc. 25,00,000

9 FMS for three years (10%) 2,37,17,000


Total 29,65,90,800