Autocorrelation

Autocorrelation
• Lebanon Example

• Errors are correlated

• Observed in time series data


– A time series is a sequence of observations taken
sequentially in time

– An intrinsic feature of a time series is that, typically


adjacent observations are dependent

– The nature of this dependence among observations of


a time series is of considerable practical interest
Autocorrelation

– Say, output of a farm regress on capital


and labor on quarterly data and there is
a labor strike on a particular quarter
affecting the output in that particular
quarter  No autocorrelation

– But if the strike affect the output in


other quarters as well  Autocorrelation
Reasons
• Inertia or sluggishness
– agricultural commodities
Supplyt = B1+ B2Pt-1+ ut
– Say at the end of period t, Pt turns out to be
lower than Pt-1, so the farmer may decode to
produce less in period (t+1) than t
• Data manipulation
– Monthly to quarterly data by averaging,
thereby damping the fluctuating of monthly
data
– Smoothness leads to systematic pattern in
disturbances
Reasons
• Model Specification errors
– Omitting relevant variable(s)
• Ex: Y=b1+b2X2t+b3X3t+b4X4t+ut but we run the
regression Y=b1+b2X2t+b3X3t+ vt, where
vt=b4X4t+ut
• If we plot v, it will not be random but exhibit a
systematic pattern  creating (false)
autocorrelation
• Lags
consumptiont=b1+b2incomet+b3consumptiont-1+ ut
Autocorrelation
ut

Time
Order of auto-correlation
Consequences of autocorrelation

• Least square estimates are linear and


unbiased but they do not have minimum
variance property

• t & F statistics are not reliable

• R2 may be an unreliable measure of


true R2
Detection
• Plotting OLS residuals against time
– No autocorrelation  errors are randomly
distributed
– Presence of autocorrelation  errors
exhibit a distinct behavior

• Correlogram Q stat
• Serial correlation LM test
• DW statistics (based on estimated
residuals) ***
Durbin-Watson statistic is not appropriate as a test
for serial correlation in this case, since there is a
lagged dependent variable on the right-hand side of
the equation.
Corrections for Serial Correlation
• Let, Yt = b1+b2X2t+b3X3t+ …+bkXkt+et …….(1)

• et = ρet – 1+ vt,  errors follow AR(1) process

• -1 < ρ <1, vt~ N (0, σv2), independent of other


errors over time

• The error process is generated by a rule


which says that the error in time t is
determined by diminishing the value of the
error in previous period (multiplying by ρ) and
then adding the effect of a random variable
Corrections for Serial Correlation
• ρ measures correlation coefficient
between errors in time period t and that
in time period (t-1)
• Assuming that equ (1) holds for (t-1) period
also
• Yt-1 = b1+b2X2t-1+b3X3t-1+bkXkt-1+et-1
• Multiplying this equation by ρ and subtracting
from equation (1)
• Yt* = b1(1- ρ )+b2X2t* +b3X3t *+…+bkXkt *+vt ..(2)
– whereYt* = Yt- ρYt-1, Xt* = Xt- ρXt-1, (et - ρet – 1) = vt
Corrections for Serial Correlation
• By construction, the transformed equation has an
error process, which is independently distributed
with 0 mean and constant variance
• OLS can give efficient estimates of all the regression
parameters
• Generalized differencing procedure would be useful
when value of ρ was known a priori
• However, this is usually not the case
• Procedures for estimating ρ
– The Cochrane- Orcutt Procedure
– The Hildreth-Lu Procedure
– ML method
Cochrane- Orcutt Procedure
• It involves a series of iterations, each of which produces a
better estimate of ρ than does the pervious one
• In the first step, OLS is used to estimate original model
[equation (1)]
• The residuals from this equation are then used to perform the
regression

êt  ρ ê t-1 + vt

• The estimated value of ρ can be substituted in equation (2)


and a new regression is run
• Substituting ‘b’s in equ (1), we get new residuals and again run
the regression
êˆt  ρ êˆ t-1 + vt
Cochrane- Orcutt Procedure
• This second set of residuals can be used to
obtain a new set of ρ
• The iterative process can be carried on for as
many steps as desired
• Standard procedure is to stop iteration
when the new estimates of ρ differ from
old ones by less than 0.01 or 0.005 or
after 20-25 estimates of ρ have been
obtained
• EViews estimates AR models using nonlinear
regression techniques.
Residuals are not random

DW is low  Autocorrelation
t, F, R2 are unreliable
Ho: No autocorrelation
Here, 0% chance
So, there is autocorrelation
Add ar(1) as regressor to rectify autocorrelation

AR(1) significant along with others and


coefficient of AR is < 1
Ho of no autocorrelation is accepted
Forecasting
• Static: Yi =24.45+0.509 Xi
• Dynamic Yt+1 = b1 + b2 Xt+1+ ρut+ vt+1
Forecasting
• Root-Mean-Squared-Error (RMSE) and Mean Absolute
Error (MAE) criteria depend on the scale of the
variable, while the Mean Absolute Percentage Error
(MAPE) and Theil inequality coefficient are insensitive
to the scale of the variable

• The smaller the error, the better is the forecasting


performance for the series

• The Theil inequality coefficient always lies between


zero and one, where zero indicates a perfect fit

• Any forecast is also said to be “good”, if the bias and


variance proportions are small so that most of the bias
should be concentrated on the covariance proportions.
Degree Days
• DDs are a practical method for determining
cumulative temperatures over the course of a season.
Originally designed to evaluate energy demand and
consumption, degree days are based on how far the
average temperature departs from a human comfort
level of 65 °F *.

• Simply put, each degree of temperature above 65 °F


is counted as one cooling degree day, and each degree
of temperature below 65 °F is counted as one heating
degree day

• Degree days are determined by subtracting average


daily temperature from 65° F. Example: average daily
temperature is 25° F, (65 – 25 = 40) then we have
accumulated 40 degree days on this date.

Potrebbero piacerti anche