Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
if problem is not
recovered--
3) Recycle MAB—
MAB Recycling Procedure
MAB
4) If the problem is still not
recovered
Conduct Air Brake Self Test.
Secure the Formation.
(Auto Brake to Emergency)
Put Skids/Wedges. On wheels
Close BP/FP Pipe between the
Loco and Formation.
.
Ensure no leakages of Air from
BP/FP//BCEQ/MREQ on
both ends of the Loco, and
no leakages from Air Dryer,
MR-1, MR-2, J- Filters, ABD
Valves, Sanders, Radar
Blow etc.
Minimum MR Pressure on
Gauge should be
8Kg/Cm2.
Ensure Control Stand is
secured.
REV-Neutral.
TH- Idle
ER & GF-Off.
Isolation Switch-
Isolate
Ensure Working Control
Stand L/T Switch is in
Lead and Non-Working
Control Stand in Trail.
On Working Control Stand Auto
Brake and DIR Brake
should be released and
on Non-Working Control
Stand Auto Brake should
be in FS and Independent
Brake should be in Full
Position.
On EM-2000 DDHU Press
Main Menu
Self Test
(Next Page )
Air Brake Test.
Press START to Continue.
(EM-2000 will display Air
Brake Test in Progress)
Wait till
“Test Successful ,
No Defects found”