University of Turkish Aeronautical Association

Faculty of engineering EEE department

Supervision Presented by Presented by


Prof. Dr. Ibrahim Othman Al Darraji Omar Saadi Alshear
Mahariq Department of Electrical Department of Electrical
Department of Electrical Engineering Engineering
Engineering TAA. University TAA. University
TAA. University Ankara , Turkey Ankara , Turkey
Ankara , Turkey otomn_kh@yahoo.com omarsaad529@gmail.com
ibmahariq@gmail.com
Turkey – Ankara 10 - 5 - 2016
1
TESTING AND MAINTENANCE OF POWER TRANSFORMER
DISCUSSION

DEFINITION OF THE TRANSFORMER

TEST REQUIRMENTS

TESTING OF TRANSFORMER

ROUTINE TESTS

REGULAR MAINTENANCE FOR POWER TRANSFORMERS

2
TESTING AND MAINTENANCE OF POWER TRANSFORMER
Transformer is a static device which
transforms A.C electrical power from one
voltage to another
Voltage keeping
The frequency same by
Electromagnetic induction

3
TESTING AND MAINTENANCE OF POWER TRANSFORMER
IRON CORE

4
TESTING AND MAINTENANCE OF POWER TRANSFORMER
DISCUSSION

DEFINITION OF THE TRANSFORMER

TEST REQUIRMENTS

TESTING OF TRANSFORMER

ROUTINE TESTS

REGULAR MAINTENANCE FOR POWER TRANSFORMERS

5
TESTING AND MAINTENANCE OF POWER TRANSFORMER
TEST REQUIREMENTS

1- NAME PLATE FOR TRANSFORMER

S.N: 925 554

1=50KVA
2=100KVA
3=200KVA
4=300KVA
5=500KVA
6=800KVA
7=1000KVA
8=1500KVA

6
TESTING AND MAINTENANCE OF POWER TRANSFORMER
TEST REQUIREMENTS

2-TESTING DEVICES

7
TESTING AND MAINTENANCE OF POWER TRANSFORMER
TEST REQUIREMENTS

3- SAFETY EQUIPMENT

4 - MECHANICAL EQUIPMENT

8
TESTING AND MAINTENANCE OF POWER TRANSFORMER
DISCUSSION

DEFINITION OF THE TRANSFORMER

TEST REQUIRMENTS

TESTING OF TRANSFORMER

ROUTINE TESTS

REGULAR MAINTENANCE FOR POWER TRANSFORMERS

9
TESTING AND MAINTENANCE OF POWER TRANSFORMER
TESTING OF TRANSFORMER

Types of testing

1- Routine tests

2- Type tests

3- Special tests

10
TESTING AND MAINTENANCE OF POWER TRANSFORMER
TESTING OF TRANSFORMER

1-ROUTINE TESTS
1.1- Measurement of voltage ratio
1.2-Vector group verification
1.3-Measurement of winding resistance
1.4-Impedance voltage test(z)
1.5-Dielectrics Test
A-Measurement of insulation resistance.
B- Dissipation power factor / insulation power factor (tan∂)
C- OIL TEST
11
TESTING AND MAINTENANCE OF POWER TRANSFORMER
TESTING OF TRANSFORMER

2- TYPE TESTS
THESE TESTS ARE CARRIED OUT ON ONE TRANSFORMER OF
THE LOT.

2.1- All routine tests.


2.2- Additionally following tests are included in type
tests.

A- Lightening impulse test.


B- Temperature rise test.

12
TESTING OF TRANSFORMER

3-SPECIAL TESTS

3.1- Measurement of zero Phase sequence.


3.2- Measurement of acoustic noise level.
3.3- Measurement of harmonics of the no load current.
3.4- Magnetic balance test.

13
TESTING AND MAINTENANCE OF POWER TRANSFORMER
DISCUSSION

DEFINITION OF THE TRANSFORMER

TEST REQUIRMENTS

TESTING OF TRANSFORMER

ROUTINE TESTS

REGULAR MAINTENANCE FOR POWER TRANSFORMERS

14
TESTING AND MAINTENANCE OF POWER TRANSFORMER
Transformer Breakdowns

15
TESTING AND MAINTENANCE OF POWER TRANSFORMER
Sources of faults in transformer

16
TESTING AND MAINTENANCE OF POWER TRANSFORMER
17
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-ROUTINE TESTS

Apply Tests Routine on Power Transformer


Type: 132/33 / 11.5KV ,63 MVA
VECT. GROUP: YnYnd11

18
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-1-Measurement of voltage ratio

1- This test measures the voltage ratio as per the customer’s


requirement.

2- V1/V2 = N1/N2

3-The voltage ratio is equal to the turns ratio in a transformer. Using


this principle, the turns ratio is measured with the help of a turns ratio
meter. If it is correct , then the voltage ratio is assumed to be correct.

4- apply the rated ratio for all tab (1-17).

5-apply the rated ratio for (132 kv,33kv 11kv)

6- Equipment used : Transformer Turns Ratiometer ( T T R)


19
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-1-Measurement of voltage ratio

Type: 132/33 / 11.5KV ,63 MVA


VECT. GROUP: YnYn0d11
Rated ratio (Ynd11)H.V-L.V=( 132/ √3 ) / 11.5=6.6227 FOR TAP (9)

Tap pos. TAP Voltage (A-N) / (a-c) (B-N) / (b-a) (C-N) / (c-b) Rated Ratio
(kv) (Measured (Measured (Measured (Rated value )
value) value) value)

1 145.2 / 11.5

9 132.0 (132 ⁄ √3) ⁄ 11.5 = 6.627


10
11

17 118.8
20
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-1-Measurement of voltage ratio

TEST:
VECT. GROUP: Ynd11 FOR H.V – L.V
H.V

N A B C a
cN
b M.V
L.V TR.
b TR.
c
a n

Ratio meter

21
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-1-Measurement of voltage ratio

APPLLY THIS LAW

The no-load deviation of the turn ratios


should be ≤ % 0,5

22
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-1-Measurement of voltage ratio

The use of modern equipment

TTR (Transformer Turns Ratio) 23


TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-2-Vector Group Verification

This test is very important for an engineer to figure out


directional connectivity for transformers.
(( Dy11 ,Yd11, Dy1,Yd1))

24
TESTING AND MAINTENANCE OF POWER TRANSFORMER
Dy11
Yd11

25
TESTING AND MAINTENANCE OF POWER TRANSFORMER
Dy1

Yd1

26
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-2-Vector Group Verification

Steps to implement the test

STEP 1
Connect H.V

STEP 2
S.C
STEP 3
Take V
B-b , B-c ,C-b , C-c

27
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-2-Vector Group Verification

C-b > C-c ≈ B-b ≈ B-c B-c > B-b ≈ C-c ≈ C-b B-c ≈ C-b>B-b ≈ C-c

Dy11 Dy1 Dd0

Yd11 Yd1
Yy0
28
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-3-Measurement of winding resistance

D.C RESISTANCE

This test measures the resistance of the H.V , M.V& L.V


winding. The values of resistance should be balance for all
three phases and should match the designed values.

Equipment used : Digital resistance meter.

29
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-3-Measurement of winding resistance

Type: 132/33 / 11.5KV ,63 MVA


VECT. GROUP: YnYn0d11
FOR H.V, USES TAP POS. 1-9-17
FOR M.V , USES TAP POS. 1 - 3 - 5
FOR L.V , USES TAP POS. 1
Tap pos. A-N B-N C-N Resistance Oil Temp Rest. At
ohm ohm ohm 3-ph 75C˚

9 0.4108 0.4104 0.4192 1.2305 19C˚ 1.5023

17

30
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-3-Measurement of winding resistance

Type: 132/33 / 11.5KV ,63 MVA


VECT. GROUP: YnYn0d11
WHEATSTON BRIDGE

WIND. REST. FOR H.V


H.V

N A B C c
c
b M.V
L.V b TR.
a
a n

WHEATSTON BRIDGE
31
TESTING AND MAINTENANCE OF POWER TRANSFORMER
RESISTANCE WINDINGS AT 75 C˚

Where :
T: CONSTANT ==234.5. for copper
T1: 75C˚
T2: The temperature at which the
measurement (19C ˚).
Rt1: Resistance value at the temperature
(75C ˚).
Rt2: Resistance value at measured
temperature
Rt1=1.502326 ohm

32
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-3-Measurement of winding resistance

A V
A
Type: 132/33 / 11.5KV ,63 MVA H.V
B N
VECT. GROUP: YnYn0d11 C
VOLTMETER – AMMETER
A
Apply ohm law D.C
12V
V

B N
M.V
C
A

V L.V
C B

33
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-3-Measurement of winding resistance

Type: 132/33 / 11.5KV ,63 MVA


VECT. GROUP: YnYn0d11
WINDING REST. H.V
The use of modern equipment
H.V

2
1
N A B C c
c
TR. b
L.V b
a
a n M.V

The use of modern equipment


34
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-3-Measurement of winding resistance

What is the benefit of?

1- It is to compare the design calculations in terms of volumes


conductors used

2- Resistance winding test used in calculating copper losses

35
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-4-IMPEDANCE VOLTAGE TEST(Z)

Type: 132/33 / 11.5KV ,63 MVA


VECT. GROUP: YnYn0d11
VOLTMETER - AMMETER

A
A A

36
TESTING AND MAINTENANCE OF POWER TRANSFORMER
IMPEDANCE VOLTAGE TEST(Z)

Type: 132/33 / 11.5KV ,63 MVA


VECT. GROUP: YnYn0d11
IMPEDANCE VOLTAGE (Z) :( H.V—L.V) (1,9,17) TAP POS.
IMPEDANCE VOLTAGE (Z) :( H.V—M.V) (1,9,17) TAP POS.

Tap pos. A-B B-C C-A A B C

1 420V 422V 429V 3.5AMP 3.3AMP 3.4AMP

17

37
TESTING AND MAINTENANCE OF POWER TRANSFORMER
IMPEDANCE VOLTAGE TEST(Z)

Why do we apply the equation below?

FOR EXAMPLE:
Rated voltage =145.2kv , Rated current =250.5
Applied voltage Measured current Z=+ -7.5% FOR TWO
AB=420 A=3.5 WINDINGS
BC=422 B=3.3
CA=429 C=3.4 Z=+ - 10%FOR THREE
Apply the law : WINDINGS

38
TESTING AND MAINTENANCE OF POWER TRANSFORMER
IMPEDANCE VOLTAGE TEST(Z)

What is the benefit of?


1- In the case of connecting a power transformer in parallel with the other
Test engineer must calculate the value of impedance. A impedance value should
be close.

2- When measuring three windings currents, they are roughly equal. In the case
of a damage in one winding .the current size. it will be bigger than two windings
remaining. This gives an indication of the presence of a defect in winding.

3- Read the short circuit level


FOR EXAMPLE:
Rated voltage =145.2kv , Rated current =250.5

39
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-5-Dielectrics Test

The dielectrics are separation between the parts of the


electrical system, and it may be solid or gaseous or liquid or
free space , and there is no insulating material full electrical
insulation , there is a certain electric current passes through it ,
in spite of the low value of the electric current .You should
know the value of this electric current.

The dielectric value less over a period of time. Because of their


exposure to different pressures

40
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-5-Dielectrics Test

Types of dielectric tests

1- Measurement of insulation resistance

2- Dissipation power factor / insulation power factor (tan∂)

3- Test oil

41
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-5-1- Measurement of insulation resistance.

1- Measures the insulation resistance of HV & LV windings with respect


to earth (body) and between LV & HV winding.

2- Voltage used: 1000 V to 5000 V

3- Recommended Values are ( M)Ohms for HV & 500 Mohms for LV.

4- Equipment used: MEGGER IS USED.

42
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-5-1- Measurement of insulation resistance.

Type: 132/33 / 11.5KV ,63 MVA


VECT. GROUP: YnYn0d11
insulation resistance :( H.V—L.V)

H.V 132kv

N A B C c
c
L.V 11.5kv b
b TR.
a
a n
M.V33kv

43
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-5-1- Measurement of insulation resistance.

44
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-5-2-Dissipation power factor

this test done on the electrical transformer to see the quality


of isolators used in the TRANSFORMER WINDINGS . and
isolators operate among themselves capacitors as in the
illustration.

132 kv

33 kv

11.5 kv

45
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-5-2-Dissipation power factor

1- In capacitor ideal has no losses. The electric current


precedes voltage an angle of (90˚).

46
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-5-2-Dissipation power factor

2- In practical, all capacitors find where the loss in


insulation

47
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-5-2-Dissipation power factor

48
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-5-2-Dissipation power factor

49
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-5-2-Dissipation power factor

TESTING H.V 132kv

N A B C c
c
L.V 11.5kv b
b TR.
a
a n
M.V33kv
e

REPEAT THIS TEST: Tan


M-HLE :MEDIUM – HIGH , LOW , EARTH
L-HME : LOW – HIGH , MEDIUM , EARTH
H-M / H-L / M-L / 50
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-5-2-Dissipation power factor

To find good values

51
TESTING AND MAINTENANCE OF POWER TRANSFORMER
1-5-3- OIL TEST

1- Oil breakdown voltage is checked


as per IS-335.
100 mm L X 70 mm B X 80 mm Ht.
glass pot.
500ml Oil sample.

2- Spherical electrodes with gap of 2.5


mm
3- Recommended value : 60KV
4- Equipment used : OIL BDV TEST SET.

52
TESTING AND MAINTENANCE OF POWER TRANSFORMER
DISCUSSION

DEFINITION OF THE TRANSFORMER

TEST REQUIRMENTS

TESTING OF TRANSFORMER

ROUTINE TESTS

REGULAR MAINTENANCE FOR POWER TRANSFORMERS

53
TESTING AND MAINTENANCE OF POWER TRANSFORMER
Regular maintenance for power transformers

1- Periodic checking of
any loose connections of
the terminations of HV &
LV side.

54
TESTING AND MAINTENANCE OF POWER TRANSFORMER
Regular maintenance for power transformers

2-Breather examination.
Dehydration of Silica gel if
necessary.
3-Explosion vent diaphragm
examination.
4-Conservator to be cleaned
from inside after every three
years.

55
TESTING AND MAINTENANCE OF POWER TRANSFORMER
Regular maintenance for power transformers

5- Regular inspection of OIL &


WINDING TEMPERATURE METER
readings.
6- Cleanliness in the Substation yard
with all nets, vines, shrubs removed.

56
TESTING AND MAINTENANCE OF POWER TRANSFORMER
University of Turkish Aeronautical
Association
Faculty of engineering EEE department

TESTING AND MAINTENANCE OF POWER


TRANSFORMER

Thank you for your


attention!

Questions?

57