BARAUNI THERMAL
POWER STATION
1
INTRODUCTION OF THE THERMAL
POWER PLANT
It was established in 1983.
It is located at the left bank of the GANGA RIVER at the
upstream of Simariya Pool.
1st & 2nd units are of 110MW each.
3rd ,4th & 5th units are of 210MW.
6th & 7 unit of 195MW.
Total generation capacity
(110+110+210+210+210+195+195)=1240MW
Favourable condition
Good transport facility.
Abudant quantity of clean cooling water.
2
INSTALLED CAPACITY
STAGE Unit number Installed Data of Status
capacity(MW) comisioning
Stage1 1 110 January, 1983 Running
3
Main Parts of Barauni ThermalPower
Station
• Principal
• Layout
• Coal handling plant
• Boiler
• Super heater
• Steam Turbine
• Economizer
• Generator
• Water Treatment Plant
• Ash handing plant
• Control Room
4
Thank You..
6
COAL MINING
SurfaceMining
Strip Mining
Underground Mining
7
Wagon unloading system
Unload the coal from
wagon to hopper with
the help of wagon
tripler.
Hopper allow to pass
coal pieces<200mm.
From hopper coal fall
on vibrator which is
supported by roller.
8
Conveying system
Belt are used to convey
coal from handling plant
to furnace.
Specification
• Belt width:1400mm
• Speed: 2.2m/sec
• Total install power:
360kw
• capacity:
1350/750ton/hr
• No. of conveyor:38
9
Crushing system
Crusher house:- it
consist of crusher which
are used to crush the
coal to 20mm size.
Two type
Primary crusher
• Rail crusher
• Rotary breaker
Secondary crusher
10
Boiler
It is a closed vessel in which water under pressure is
converted into steam.
Hot water or steam used to transfer heat to a process.
A boiler is always designed to absorb maximum
amount of heat released in process of combustion.
Furnace-it is primary part of boiler where the fuel is
burnt to liberate the heat energy.
Chemical
Thermal
energy of energy by
fuel combustion
11
BOILER
12
Super heater
Super heater consist group of tubes.
13
Steam Turbine
It is a machine in which
a shaft is rotated steadily
by reaction of steam , air
upon blades of wheel.
It is works on modified
Rankine cycle.
14
Economizer
Economizer is a device which recover the heat
from the flue gases on their way to chimney.
15
ECONOMISER
16
GENERATOR
An electrical generator
is a machine which
converts mechanical in
to electrical energy
through electro
mechanical energy
conversion.
The generator is
driven by directly
coupled steam turbine
at a speed of 3000
r.p.m.
Mechanical electrical
energy energy
17
Water Treatment Plant
Pressure filter removes
undisclosed impurities
from raw water.
Carbon filter removes
excess chlorine from
clarified water.
D.M plant removes
dissolved impurities from
clarified water.
Conductivity , ph&silica
content of this water must
be checked time to time.
18
Ash Handling Plant
In thermal plants
25% is furnace
bottom ash and
75% is pulverized
fuel ash.
Electrostatic
Precipitator is used
in ash handling
plant to remove fly
ash.
Control
Room
21
22
23
Coal Power Plant Operation
24
Typical Coal Thermal Power Station
25
Electric grid
26
Efficiency
27
ADVANTAGE & DISADVANTAGE
ADVANTAGE
• It require less space as compared to hydro power plant.
• Less Initial cost as compare to other generating plant.
• Cost of generation is less than that of diesel power plant.
• The fuel used is quite cheap.
• It can be installed at any place irrespective of the existence of coal.the coal
can be transported to the site of the plant by rail or road.
DISADVANTAGE
• It pollutes the atmosphere due to production of large amount of smoke and
Fumes.
• It is costlier in running cost as compared to hydro electrical plants.
28