COMPANY PROFILE

OF
JOHN C. CALANSINGIN
& ASSOCIATES

CONSTRUCTION MANAGER - WORKS ENGINEERS

No. 466 Apitong Street Comembo, Makati City

Tel nos.: 728-2692/729-9534


non
Mobile nos.: 09232990545/09089201185
Email Add: jc.mgnt1990@gmail.com
COMPANY PROFILE
OF
JOHN C. CALANSINGIN
& ASSOCIATES

CONSTRUCTION MANAGER-WORKS ENGINEERS


No. 466 Apitong Street Comembo, Makati City

Tel nos. 728-2692/729-9534


Mobile nos.: 0923-2290545/ 0908-9201185
Email Add: jc.mgnt1990@gmail.com
Brief History of John C. Calansingin& Associates
Construction Manager – Works Engineer
JOHN C. CALANSINGIN & ASSOCIATES is a single proprietor company
registered at Department of Trade and Industry on July 6, 2010 and renewed
until July 6, 2015. A company engages in Construction Management and
Works Engineering Services for the construction of High Rise (Residential and
Commercial) building as well as Road and Site Development Works.

To date, John C. Calansingin& Associates was Nineteen (22) years in


experience as Consultant in Construction Management and Works Engineering
Services, since it started in 1995. Engr. John C. Calansingin, a Registered Civil
Engineer, formerly worked with D.A. ABCEDE & Associates (company well
experience in Construction Management) as Resident Manager for eight (8)
years before managing the John C. Calansingin& Associates as
President/General Manager. For details, we attached herewith our Company
Resume showing our Bio data, Scope of Services, and summary of project
undertaken.

Our Engineering staffs are competent Civil Engineers and Electro-Mechanical


Engineers well experienced in the supervision and management of
construction of high-rise, (residential and commercial) buildings, as well as
road and site development works.
MISCELLANEOUS PERMITS
AND LICENSES
1.Department of Trade and Industries
2.VAT Registration
3.SSS Certification
4.Mayors Permit
JOHN C. CALANSINGIN &
ASSOCIATES COMPANY BIO-DATA
BIO – DATA

Name of Firm : JOHN C. CALANSINGIN & ASSOCIATES

New Office Address : #466 Apitong Street, Comembo, Makati City

New Telephone Number : 728-2692 / 729-9534

Business Primary Purpose : Consultant in Construction Management Services

Legal Status of the Firm : Single Proprietorship

Initial Capital Invested : Php 250,000.00

Present Working Capital : Php 1,300,000.00

Construction Manager : Engineer John C. Calansingin

Professional Civil Engineer

C.E. Reg. No. 22276

Home Address : #466 Apitong St., Comembo, Makati City


COMPANY SCOPE OF SERVICES IN
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT SCOPE OF SERVICES
1. GENERAL SCOPE OF WORKS

1.1. Pre-Construction Services. This consists preparation of budgetary cost


studies, estimates and cash flow analysis; development of work programs;
preparation and/or review of contract documents, evaluation of bids from
contractors.

1.2. Construction Stage. This consists inspection, coordination, evaluation of


work accomplishment including claims for payments submitted by contractors,
evaluation of change in the work, maintaining pertinent office and jobsite records
and file. This also includes canvassing of prices, securing proposals, review and
evaluate of bids on owner-supplied materials (OSM), equipment and other
specialty works not covered by the general contractor’s contract including
management and coordination of the same and all other works during the
construction period.

1.3 Post-Construction Services. This includes submission of all documents to the


owner, final inspection; and provides assistance in securing of occupancy
permit prior to turn-over.
2. PRE-CONSTRUCTION SERVICES

2.1. Secure design and specifications of Architectural, Structural, Electrical,


Sanitary and Fire Protection, Mechanical from the architect.
2.2. Review plans for design clarification.
2.3. Take-off detailed budgetary cost estimate to the owner
2.4. Bidding Stage
2.4.1. Prequalification of contractors for owner reference
2.4.2. Invitation to bid to qualified contractors
2.4.3. Issue Bid Proposal form to qualified contractors
2.4.4. Issue Instruction to bidders with the component of Bid Proposal
Form
2.4.5. Conduct bid conference and queries clarification to the architect
and designers
2.4.6. Submission of answers to queries
2.4.7. Submission of bids
2.4.8. Evaluation of bids
2.5. Submit recommendation for negotiation of award
2.6. Issue Letter of Award (LOA)
2.7. Issue Notice to Proceed (NTP)
2.8. Securing of bonds and insurances by the contractors
2.9. Prepare final Contract Agreement
2.10. Mobilization of contractor
2.11. Manpower of construction management as per project requirement
3.1. CONSTRUCTION STAGE

3.1. Assists in obtaining all building permits and special permits for permanent
improvement excluding permit for inspection or temporary facilities
required to be obtained directly by the various contractors. Verify that the
owner has paid all applicable fees and assessments for permanent facilities.
Assist in obtaining approvals from all the authorities.
3.2. Submission of general requirements from the contractors
3.3. Review drawings and specifications, architectural and engineering, for the
purpose of advising on site conditions, appropriate materials alternates,
construction feasibility of various system and the possible design and cost
implications of local availability of materials and labor; including of PERT CPM
from contractors.
3.4. Coordination with the architect and contractors regarding clarifications on
plans and specification and other matters to ensure expeditions performance
and completion of the work
3.5. Supervise and check building layout
3.6. Supervise and check excavation
3.7. Daily site inspection by construction management personnel on site
3.8. Supervise testing of samples of owner-supplied materials (reinforcing bars and
reinforcing bars) upon delivery on site; as well as testing of plumbing,
electrical, fire protection, and mechanical inspection
3.9. Reviewing and checking of updated as-built plans from contractors upon
completion of work (such as civil, architectural, structural, sanitary, electrical,
fire protection and mechanical works) to ensure correctness and accuracy of
the same
3.10. Require the contractor to submit shop drawings whenever necessary for
approval by the architect or engineer prior to start of work
3.11. Paper and documentary works:
3.11.1. Prepare overall construction schedule, bar chart with S-curve and owner’s cash flow
3.11.2. Prepares minutes of the meetings and agenda and presides weekly coordination meetings
with the owner, architect, construction manager, site-in-charge personnel and designers if
needed
3.11.3. Prepares minutes of the meetings and agenda and presides weekly technical meeting with
the technical staffs
3.11.4. Issue inspection report prior to concreting
3.11.5. Evaluation of Monthly Progress Billing from the contractors
3.11.6. Evaluation of change orders initiated by the owner, architect or designers
3.11.7. Evaluation of corresponding extension of time for every change order
3.11.8. Evaluation of elapse and remaining calendar days based from the schedule
3.11.9. Prepares Monthly Progress Executive Reports
3.11.10. Updating of contractor’s progress of work on weekly basis
3.11.11. Updating of cash flow of the owner as per awarded items

3.12. Pre-construction of Owner-Supplied Materials that are not yet purchased/awarded during pre-
construction stage:
3.12.1. Provide assistance in purchasing owner-supplied materials (OSM) thru review of proposals.
3.12.2. Conduct bid conference among contractors, subcontractors and manufacturers of systems
and sub-systems (owner-supplied materials); to assure that all bidders understand the
components of the bidding documents and management techniques.
3.12.3. Submit recommendation on proposed breakdown of contract works and owner-supplied
materials including list of suggested contractors and suppliers.
3.12.4. Check bid packages, drawings and specifications to eliminate overlapping jurisdiction
among the separate contractors.
3.12.5. Recommend early purchase of those specified items of equipment and materials that
require a long lead time for procurement and delivery and expedite purchase in general.
3.12.6. Evaluate bids submitted for the project
3.12.7. Provide assistance to the Architect in the preparation of contract documents for
contractors and specialty contractors in direct contract with the owner

3.13. Advise solution to contractor on how to recover from delays


3.14. Manpower of construction management as per project requirement
4. POST CONSTRUCTION

4.1. Determine final completion and provide written notice to the owner and
architect that the work is ready for final inspections. Secure and transmit
to the architect required guarantees, affidavits, releases, bonds and
waivers. Turn-over to the owner all keys, operational manuals, record
drawings, brochure of equipment’s maintenance stocks for orientation
of building maintenance of the owner
4.2. Punch listing/final inspection to identify workmanship defects prior to
turn-over and assuring that the project is completed according to plans
and details from the architect and designer and which is approved by the
owner.
4.3. Submission of complete As-Built plans from the contractors.
4.4. Issue documents for 100% completion including minutes of the
meetings, agenda, requests for information (RFI’s), requests for approval
(RFA’s), shop drawings, change orders and details of each, and punch lists
for turn-over acceptance of the owner.
4.5. With the owner’s maintenance personnel, direct the checkout of utilities,
operational systems, and equipment for readiness and assist in their
initial start-up and testing.
4.6. Securing occupancy permit by the general contractor/owner.
4.7. Manpower of construction management as per project requirement
SUMMARY OF PROJECTS
UNDERTAKEN
SUMMARY OF ON-GOING PROJECT & RECENTLY FINISHED PROJECTS
UNDER JOHN C. CALANSINGIN & ASSOCIATES
(CONSTRUCTION MANAGER- WORKS ENGINEER)

No. Description Status Owner / Architect Estimated Year

Const. Cost Completion/Comple


ted

1.0 Proposed Construction and Land On-going Wong Chu Kings Holdings Inc. Php 14 months
Developemnt on TIP3 114,000,000.00
Located at Tuctucan,Guiguinto,Bulacan (start October 2016) Alfred S. San Miguel

Cecilia A. Tolentino Floor Area


Purchasing Section Plant: 16,000.00 m2
+63 44 7943086 loc.238
0917-852-5725

2.0 Proposed Construction of Twenty Two(22) On-going Sta. Lucia Land, Inc. Php 23 months
Storey Condotel Building with Three (3) W.V. Coscolluela & Associates 470,000,000.00
Basement .Located at #77 Katipunan Ave. (start July 21, 2015)
Blue Ridge Quezon City Floor Area
Arch. Wennie Abad 19,639.15 m2 August 2017
0917-891-1259

3.0 Proposed Construction of Hotel Learning On-going One La Salle Educational Foundation Php 18 months
Center (JHIS LA SALLE) Located at 80,000,000.00
Banawag Bagac, Bataan (Start May 2016) V.R. Benito Architect and Services

Bro. Rey Mejias Floor Area


0917-804-0036 780 m2
Arch. Vicente Benito
0917-890-6061
SUMMARY OF ON-GOING PROJECT & RECENTLY FINISHED PROJECTS
UNDER JOHN C. CALANSINGIN & ASSOCIATES
(CONSTRUCTION MANAGER- WORKS ENGINEER)

No. Description Status Owner / Architect Estimated Year


Const. Cost Completion/Comple
ted

4.0 Proposed Construction of Six (6) Storey On-going V.R. Benito Architect and Services Php 18 months
Residential Commercial Building with Stephanie Zubiri-Cresp 60,000,000.00
Basement Located at 6059 R. Palma St (start August 3, 2015) 0917-840-8494
Floor Area
1,800 m2

Arch. Vicente Benito February 2017


0917-890-6061

5.0 Poblacion Makati City On-going Integrated Health Prividers, Inc. Php 30 months
Juan C. Lopez and Associates/ 700,000,000.00
(start November Arch. Juan C. Lopez
9,2014) 0922-852-2276
Dr. Jerome Grageda
0917-427-7688 May 2017
UNDER JOHN C. CALANSINGIN & ASSOCIATES
(CONSTRUCTION MANAGER- WORKS ENGINEER)

No. Description Status Owner / Architect Estimated Year


Const. Cost Completion/Comple
ted

60.0 Proposed Construction of Eighteen (18) Completed W.V. Coscolluela & Associates/ Php 2016
Storey Bldg. Splendido Condotel Tower II Ach. Wennie Abad 437,346,013.19
Located at Brgy. Dayap 0917-891-1259
Laurel, Batangas
Mr. Eric Dimaculangan
0917-890-5606

59.0 Proposed Construction of Eleven (11) Completed Unihealth Quezon City Hospital Php 2015
Storey Hospital and Medical Center located Fernando Carlos, M.D. 250,000,000.00
at #20 Seminary Road corner, Fema road 0922-817-2071
brgy., Bahay Toro, Quezon City
Arch Alexander Balce
0917-898-3874

58.0Proposed Construction of Eleven (11) Completed Unihealth Pateros Hospital Php 2015
Storey Hospital and Medical Center located Fernando Carlos,M.D. 250,000,000.00
at 844 Padre Herrera St.,Brgy. Aguho, 0922-817-2071
Pateros M.M.
Arch Alexander Balce
0917-898-3874

57.0 Proposed Construction of 5-storey Hotel Completed Patts College of Aeronautics,Inc. Php 2015
Monticello with Basement Located at Jose Eduardo Valdez 270,000,000.00
Aguinaldo Highway,Brgy.Kaybagal 0922-817-2071
,Tagaytay City Arch Alfred San Miguel
0916-399-5939

56.0 Proposed Construction of Seven (7) Completed Unihealth Valenzuela Hospital Php 2015
Storey Hospital and Medical Center located Roberto M. De Leon,M.D. 250,000,000.00
at Lot 18b1 FLS-3068-D,Mc. Arthur 0922-884-6245
Highway,Brgy.Polo, Malanday,Valenzuela

Arch. Alexander Balce


0917-898-3874
SUMMARY OF ON-GOING PROJECT & RECENTLY FINISHED PROJECTS
UNDER JOHN C. CALANSINGIN & ASSOCIATES
(CONSTRUCTION MANAGER- WORKS ENGINEER)

No. Description Status Owner / Architect Estimated Year

Const. Cost Completion/Comple


ted

56.0Proposed Construction of 5-storey Hotel Completed Patts College of Aeronautics, Inc,- Php 2015
270,000,000.00
Monticello with basement located at (start December 29, Jose Eduardo Valdez/Arch. Alfredo San
Aguinaldo 2011) Miguel
Highway, Brgy. Kaybagal, Tagaytay City

55.0Proposed Construction of Seven (7) Storey Completed Unihealth Baliuag Hospital- Php 2014
Hosp. 250,000,000.00
Lot 2975-C-1 PSD-305868, Remedios (Start July 27, 2011) Esmeralda Dela Rosa, M.D/
Trinidad
Highway, Brgy. Concepcion, Baliwag, Arch. Alexander Balce
Bulacan

54.0Proposed Construction of Seven (7) Storey Completed Unihealth Valenzuela Hospital- Php 2014
250,000,000.00
Hospital and Medical Center located at Lot (Start Feb. 7, 2011) Roberto M. De leon, M.D./
18b1
FLS-3068-D, Mc Arthur Highway, Brgy. Arch Alexander Balce
Polo,
Malanday, Valenzuela City

53.0Proposed Construction of Five (5) Storey Completed Primex Printers, Inc./Alberto Z. Calaquian Php 2014
Primex Bldg. 150,000,000.00
Located at 154 Lopez-Rizal St. Brgy. (start November 27, W.V. Coscoluella & Associates/Arch Percy
Highway Hills 2012) Marquez
Mandaluyong City
SUMMARY OF ON-GOING PROJECT & RECENTLY FINISHED PROJECTS
UNDER JOHN C. CALANSINGIN & ASSOCIATES
(CONSTRUCTION MANAGER- WORKS ENGINEER)

No. Description Status Owner / Architect Estimated Year


Const. Cost Completion/Complet
ed

52.0Proposed Construction of Training School Completed Philippine Transmarine Carrier (PTC) Php 2014
for Philcamsat 150,000,000.00
Located at Pinagsanhan Maragondon, Cavite (start June 4, 2012) Arch Renato Manzano

51.0Proposed Construction of 42 Storey Completed/Finished Pacific Concord Properties Inc./ Php 2014
contract 1,225,000,000.00
Lancaster (condo/Hotel) Atrium Tower A (Start Jan. 05, 2009) Design Consortium Int'l.
Phase 2 at 622 Shaw Blvd. cor., Samat St. (Arch. Edwin Aguiling)
Mandaluyong City

50.0Proposed Construction of Five (5) storey Completed Kaella allyson Properties- Astra Marine- Php 23,800.000.00 2011
commercial building with roofdeck and (Start August 01, Capt. Gaudencio Morales/
2010)
penthouse located at Remedios St., cor Arch. Alfredo San Miguel
Remedios Circle, Malate Manila

49.0Proposed Construction of Three (3) storey Completed Mr. Rolf Gobbi/ Php 2011
9,990,000.00
residential building located at Sampaguita (Start November 08, Arch. Alfredo San Miguel
2010)
St., Tahanan Village, B.F. Homes,
Parañaque City

48.0Proposed Construction of 8- storey(TNKC- Completed Veritas Maritime Corporation- Mr. Eric Php 2010
100,000,000.00
VOM Dormitory) with penthouse located at (Start May 1, 2009) Marquez/Arch. Alfredo San Miguel
Paris St. and Leon Guinto St., Malate,
Manila

47.0Proposed Construction of four (4) Storey Completed Mr. Ciriaco Tan/ Php 2010
60,000,000.00
Resort Hotel (Interior and Exterior Finishes (Start April 02, 2009) Mr. Alexander Go
with Installation of MEPF-Utilities) and
Additional 4 Floors Utilities/Service Structure
Located @ Calbayog City, Samar
SUMMARY OF ON-GOING PROJECT & RECENTLY FINISHED PROJECTS
UNDER JOHN C. CALANSINGIN & ASSOCIATES
(CONSTRUCTION MANAGER- WORKS ENGINEER)

No. Description Status Owner / Architect Estimated Year

Const. Cost Completion/Comple


ted

46.0 Proposed Construction of Office & Completed

Warehouse, Concrete & Interior Finishing (Start Feb.05, 2009) Mr. Murli J. Sabnani/ Php 2010
40,000,000.00
Located at Alabang Hills, Muntinlupa City Arch.Joselito Cruz

45.0 Proposed Construction of Four (4) Storey Completed Grand Success Int'l Ventures Inc./ Php 2009
Bldg. 40,000,000.00
Located at Mañalac st., cor. Palma St., (Start Sept. 15, 2008 Fedore O. Yap & Associates
Makati City

44.0 Proposed Construction of 4 storey with Completed Sarfe Holdings Inc./ Php 2010
50,000,000.00
Penthouse(Sarfe Office Bldg) located at (Start May 1, 2009) Arch. Alfredo San Miguel
Makati City

43.0 Proposed Construction of 10-beds El nido Completed Malampaya Foundation Inc./ Php 2010
250,000,000.00
County Hospital @ El nido, Palawan Schematic Design & Arch. Lito D. Buatista

Budget Cost

(Start April, 2009)

42.0 Proposed Construction of Super 8 Store at Completed Super 8 Retail System Inc./ Php 2009
20,000,000.00
Guadalupe Commercial Complex, Makati (Start Oct. 15, 2008) Duanne Quintal & Associates
City
SUMMARY OF PROJECT UNDERTAKEN
UNDER JOHN C. CALANSINGIN & ASSOCIATES
(CONSTRUCTION MANAGER- WORKS ENGINEER)

No. Description Status Owner / Architect (Value Estimated) Year


Const. Cost Completed

41.0 Proposed Planning Design and Completed Province of Zamboanga PHP 150,000,000.00 2008
Construction and Site Del Sur
Development of Zamboanga Del
Sur Hospital (Medical Center)
Pagadian City, Philippines
40.0 Proposed Construction of 34 Completed Belle Corporation PHp 285,000,000.00 2008
Units Single Detached Homes @
Tagaytay Highlands-The Parks @
SaratogaHills @ Barangay
Suplang Tanauan City, Batangas
39.0 Proposed Planning Designed Completed Arch. Gean Flancia/ PHP 300,000,000.00 2007
Const. and Site Development of Province of Zamboanga
Zamboanga Del Norte Provincial Del Sur
Hospital Dipolog City
38.0 Proposed Construction of D.O Completed Butuan City Municipal PHP 136,800,000.00 2007
Plaza Regional Center at Butuan Government
City, Agusan Del Norte

37.0 Proposed Three (3) Level Completed Mr. Murli Sabnani / F. L. PHP 35,000,000.00 2007
Residence At Ayala Alabang Santoromana Designs
Village, Muntinlupa City (Casa Arkitektura)

36.0 Construction of Catholic Church Completed Mary Mirror of Justice PHP 15,000,000.00 2007
(Mary Mirror of Justice) @ Parish / Arch. Jennifer
Comembo, Makati City Cruz
SUMMARY OF PROJECT UNDERTAKEN
UNDER JOHN C. CALANSINGIN & ASSOCIATES
(CONSTRUCTION MANAGER- WORKS ENGINEER)

No. Description Status Owner / Architect (Value Estimated) Year


Const. Cost Completed

35.0 Design, Site Development & Completed Cagayan Valley Provincial PHP 213,795,000.00 2006
Construction of Cagayan Town Gov't Finance thru Bond
Center @ Rizal cor. Aguinaldo Floatation by RCBC (Bank)
Sts., Tuguegarao City, Cagayan

34.0 Construction of Eight (8) Storey Completed Greenhills Christian PHP 200,000,000.00 2006
Building with Two (2) Basement Fellowship (GCF) c/o Mr.
And Roof Deck-Greenhills Alex O. Tan & Arch. Mike
Christian Fellowship (GCF) @ Pena/ Arch. Eduardo A.
Garnet Road, Ortigas Complex, Madulid
Pasig City
33.0 Design, Site Development & Completed Carmona Municipal Gov't/ PHP 130,000,000.00 2006
Construction of Carmona Finance thru Bond
Housing Project @ Brgy. Floatation by DBP (Bank)
Milagrosa, Carmona, Cavite
32.0 Proposed Construction of Pad Completed Belle Corporation PHP 40,000,000.00 2006
328 (LSF-1A Model) at The
Woodlands, Tagaytay City

31.0 Proposed New Toledo City Completed City Government of Toledo / PHP 125,000,000.00 2006
Passenger Terminal, Commercial Finance thru Bond
Arcade and Traveller's Inn @ Floatation by RCBC (Bank)
Brgy. Poblacion, Toledo City

30.0 Proposed 7 Storey Residential Completed Mr. Peter Y. Ty / LG + FMW PHP 60,000,000.00 2005
Building Grand 21 Place @
Capitolyo, Pasig City
SUMMARY OF PROJECT UNDERTAKEN
UNDER JOHN C. CALANSINGIN & ASSOCIATES
(CONSTRUCTION MANAGER- WORKS ENGINEER)

No. Description Status Owner / Architect (Value Estimated) Year


Const. Cost Completed
29.0 Design, Site Development & Completed Tacloban Leyte Provincial PHP 193,880,000.00 2005
Construction of Facilities of Leyte Gov't Finance thru Bond
Academic Center @ Pawing, Floatation by DBP (Bank)
Palo, Leyte – Thru Bond
Floatation
28.0 Two (2)-Storey – 8 Bldgs. Salem Completed Salem Investment Corp. / PHP 140,000,000.00 2004
Inter. Commercial Center @ Arch. Ofelito C. Bautista
Domestic Road, Domestic
Airport, Pasay City

27.0 Two (2) Storey Maru Residence Completed Mrs. Eva Socorro L. Maru / PHP 20,000,000.00 2004
@ Kanlaon St., Ayala Alabang + Associates
Village, Muntinlupa City

26.0 Construction of Convention Completed Tagaytay City Municipal PHP 208,000,000.00 2002
Center & Lodging Facilities @ Gov't Finance thru Bond
Tagaytay City – Thru Bond Floatation by PNB (Bank)
floatation

25.0 Construction of 3-Storey Office Completed JOM Const. Corp. / Mr. PHP 10,000,000.00 2002
Building @ Bagong Kalsada Rodney Tagle
Ususan, Taguig City
24.0 3-Floors of Interior Works of Completed Triumph International PHP 15,000,000.00 2002
Triumph Int'l. (Phil.) Corp. Main (Phil.) Corp. / Arch. Alfredo
Office @ Buendia Ave., Makati San Miguel
SUMMARY OF PROJECT UNDERTAKEN
UNDER JOHN C. CALANSINGIN & ASSOCIATES
(CONSTRUCTION MANAGER- WORKS ENGINEER)

No. Description Status Owner / Architect (Value Estimated) Year


Const. Cost Completed
23.0 Construction of Two (2) Storey Completed Bauang , La Union municipal 2002
Public Market @ Bauang, La Government PHP 20,000,000.00
Union
22.0 Construction of Seven (7) Storey Completed Bahaghari Dev. Corp. / Arch. 2001
(Dormitory) Building @ Fidela A. Jun Gallego PHP 65,000,000.00
Reyes St., Malate

21.0 Construciton of Four (4) Storey Completed UMBN Broadcasting Inc. / 1999
Building w/ One (1) (Tower-Inn Arch. Digna Claudio PHP 60,000,000.00
Hotel) Basement at Pasay Road,
Makati City
20.0 Construction of Proposed Two Completed Arch. Albert Yu 1999
(2) Storey Residence with Attic @ PHP 16,000,000.00
Greenmeadows Subdv., Quezon
City
19.0 Construction of Two (2) Storey 8 Completed Arch. Dong Caritativo 1999
Units Single Detached Residence PHP 20,000,000.00
(La Louviere) @ Maclang St., San
Juan, Metro Manila
18.0 Construction of Three (3) Storey Completed Olympia Housing Inc. / Arch. 1998
SWISS Hotel @ Paco, Manila William Coscolluela PHP 60,000,000.00
Construction of Two (2) Storey
Nissan Showroom @ Carmona,
Cavite
SUMMARY OF PROJECT UNDERTAKEN
UNDER JOHN C. CALANSINGIN & ASSOCIATES
(CONSTRUCTION MANAGER- WORKS ENGINEER)

No. Description Status Owner / Architect (Value Estimated) Year


Const. Cost Completed
17.0 Construction of Two (2) Storey Completed Arch. William Coscolluei PHP 10,000,000.00 1998
Residence at Bel-Air Village,
Makati City
16.0 Construction of Interior Finishes Completed Far East Bank / Arch. Gilbert PHP 5,000,000.00 1998
of Fareast Bank Branch @ Rufino Yu
Tower @ Ayala Ave., Makati City

15.0 Construction of On (1) Storey St., Completed St. John Mary Parish PHP 8,000,000.00 1998
John Mary Parish Church at
Antipolo Rizal

14.0 Construction of Two (2) Storey Completed Eng'r. Dot Escalona PHP 12,000,000.00 1998
Building IZUMO GARMENT @
Maybunga Pasig, Metro Manila

13.0 Construction of Four (4) Storey Completed Mr. Prudentio Tan PHP 8,000,000.00 1998
Office Building @ J. Abad Santos
St., San Juan, Metro Manila

12.0 Construction of Four (4) Storey Completed Arch. William Coscolluela PHP 60,000,000.00 1997
La O Commercial Centre Bldg, at
Pasay Road, Makati City
SUMMARY OF PROJECT UNDERTAKEN
UNDER JOHN C. CALANSINGIN & ASSOCIATES
(CONSTRUCTION MANAGER- WORKS ENGINEER)

No. Description Status Owner / Architect (Value Estimated) Year


Const. Cost Completed
11.0 Construction of Two (2) Storey Completed Arch. William Coscolluei PHP 15,000,000.00 1997
Residence at North Forbes Park
#04 Banaba Circle, Makati

10.0 Construction of Interior Finishes Completed Arch. Gilbert Yu PHP 10,000,000.00 1997
of Fareast Bank Branch @ Rufino
Tower @ Ayala Ave., Makati City

9.0 Construction of One (1) Storey Completed Arch. Jimmy Biglangawa PHP 25,000,000.00 1997
(Wet & Dry Market) @ Molina,
Bacoor, Cavite
8.0 Construction of Four (4) Storey Completed Arch. Jimmy Biglangawa PHP 100,000,000.00 1997
Building Novaliches Mall @
Quezon City
7.0 Construction of Cold Storage Completed Mr. Joselito Ignacio PHP 10,000,000.00 1997
(Phase II) @ Manggahan, Pasig,
Metro Manila
6.0 Construction of Four (4) Storey Completed Polygon Ventures Inc. / Arch. PHP 12,000,000.00 1997
Dormitory @ Nagtahan, Sta. Ezra Castillo
Mesa, Manila
SUMMARY OF PROJECT UNDERTAKEN
UNDER JOHN C. CALANSINGIN & ASSOCIATES
(CONSTRUCTION MANAGER- WORKS ENGINEER)

No. Description Status Owner / Architect (Value Estimated) Year

Const. Cost Completed


5.0 Construction of Four (4) Storey Completed Arch. William Coscolluela PHP 10,000,000.00 1997
Pulse Bldg. @ Bo. Kapitolyo,
Pasig, Metro Manila

4.0 Branch Office of Fareast Bank @ Completed Arch. Antonio Zuniga PHP 8,000,000.00 1996
Navotas, Metro Manila

3.0 Construction of Two (2) Storey Completed Mr. Joselito Ignacio / Mr. PHP 8,000,000.00 1996
Office Building & Cold Storage Michael Aguilar
Phase I at Pasig, Metro Manila

2.0 Construction of Two (2) Storey Completed Mr. Michael Aguilar PHP 5,000,000.00 1995
Residence of Michael Aguilar at
Dasmariñas Village, Makati City

1.0 Interior Finishes of FANBI Completed Mr. Michael Aguilar PHP 500,000.00 1995
Garments Store at Makati
Greenbelt Mall
PHOTOS OF SOME PROJECTS
UNDERTAKEN
PROPOSED CONSTRUCTION OF METRO BACOLOD HOSPITAL AND MEDICAL CENTER
Bacolod Granada Road, Camingawan, Brgy. Estefania, Bacolod City, Negros Occidental
PROPOSED 11-STOREY UNIHEALTH QUEZON CITY HOSPITAL
AND MEDICAL CENTER
Fema Road, Brgy., Bahay Toro, Project 8, Quezon City
PROPOSED 11-STOREY UNIHEALTH PATEROS HOSPITAL
AND MEDICAL CENTER
PADRE HERRERA ST., BRGY. AGUHO, PATEROS METRO MANILA
PROPOSED 8- STOREY UNIHEALTH BALIWAG HOSPITAL & MEDICAL
CENTER DOÑA REMEDIOS TRINIDAD HIGHWAY, BRGY. PINAGBARILAN,
BALIWAG, BULACAN
PROPOSED 7- STOREY UNIHEALTH VALENZUELA HOSPITAL AND
MEDICAL CENTER
MC ARTHUR HIGHWAY, VALENZUELA CITY
THE PLANNING, DESIGN, CONSTRUCTION AND SITE DEVELOPMENT
OF ZAMBOANGA DEL SUR HOSPITAL (MEDICAL CENTER)
PADAP COMPOUND, DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR
PLANNING, DESIGN, CONSTRUCTION AND SITE DEVELOPMENT OF ZAMBOANGA
DEL NORTE PROVINCIAL HOSPITAL
SICAYAB, DIPOLOG CITY, ZAMBOANGA DEL NORTE
PROPOSED CONSTRUCTION OF TWO (2) 26 STOREY PORTOVITA
P. TUAZON COR. 14TH AVE., ARANETA CENTER, QUEZON CITY
PROPOSED FIVE (5) STOREY HOTEL MONTICELLO PROJECT
BRGY. KAYBAGAL, TAGAYTAY CITY
PROPOSED CONSTRUCTION OF FIVE (5) STOREY PRIMEX BUILDING
154 LOPEZ-RIZAL STREET, BRGY. HIGHWAY HILLS, MANDALUYONG CITY
PHILIPPINE CENTER FOR ADVANCE MARITIME SIMULATION AND TRAINING INC.
(PHILCAMSAT)
Brgy Pinagsanhan, Maragondon Cavite
PROPOSED CONSTRUCTION OF 42 STOREY BLDG.
LANCASTER ATRIUM TOWER A PHASE 2
622 SHAW BLVD. COR. SAMAT ST., MANDALUYONG CITY
PROPOSED THREE (3) STOREY RESIDENTIAL
#37 Sampaguita St., Tahanan Village Homes, Parañaque City
PROPOSED CONSTRUCTION OF KAELA-ALLYSON BUILDING
REMEDIOS ST., COR. REMEDIOS CIRCLE, MALATE, MANILA
THREE (3) STOREY OFFICE/WAREHOUSE BUILDING
DON JESUS AVENUE, ALABANG CITY
PROPOSED CONSTRUCTION OF VOM HOTEL- DORMITORY
PARIS ST., LEON GUINTO, MALATE, MANILA
PROPOSED CONSTRUCTION OF 4-STOREY COMMERCIAL/ OFFICE
BUILDING
FINLADIA ST., MAKATI CITY
FOUR (4) STOREY CIRIACO HOTEL & RESORT
BRGY. BAGACAY, CALBAYOG CITY, SAMAR
NEW TOLEDO PASSENGER’S TERMINAL,
COMMERCIAL ARCADE AND TRAVELLER’S INN
BAHAGHARI BUILDING
MALATE, MANILA
COMPANY
FINANCIAL STATEMENT
COMPANY
ORGANIZATIONAL CHART
RESUME OF:
JOHN C. CALANSINGIN
JOHN C. CALANSINGIN
I. PERSONAL DATA

Address : #466 Apitong Street, Comembo, Makati City


Date of Birth : June 03, 1955
Place of Birth : Pagsanjan, Laguna
Citizenship : Filipino
Civil Status : Married
Height : 1.73mts.
Weight : 68.00 kgs.
TIN No. : 130-885-948
SSS No. : 03-5209160-2
Religion : Roman Catholic
Telephone Number: 728-2692 / 729-9534

II. EDUCATIONAL ATTAINMENT:

Bachelor of Science in Civil Engineering


University of the East (October 1978)

III. BOARD GOV’T EXAMINATION TAKEN:

Board of Examination of Civil Engineer


Passed CE License No. 22276 Dated May 27, 1980
IV. SEMINAR/WORKSHOP:
Construction Manpower Development Foundation (CMDF) in cooperation with the
Philippines Construction Association, Inc. (PCA)

1. Project Planning, Scheduling and Network Analysis


2. Construction Quality Management (Project Management Series)

V. WORK RECORDS:

NO. NAME OF COMPANY DESIGNATION INCLUSIVE


DATES
1.0 JOHN C. CALANSINGIN Owner/ January 16, 1992
& ASSOCIATES Const. Manager to Present

2.0 D.A. ABCEDE & ASSOCIATES Residence August 1, 1987


Construction Manager - Works Engr. Manager January 5, 1992

3.0 SPECIFIED CONTRACTORS, INC. Operation January 31, 1987


Building and General Contractor Manager July 1987
Rm. 205 Union Ajinomoto Building,
Sen. Gil Puyat Ave. Makati City

4.0 ASIA CONSTRUCTION & Senior June 27, 1986


DEVELOPMENT CORP. Supervisor January 27, 1987
Building and General Contractor
2/F Union Ajinomoto Building,
Sen. Gil Puyat Ave. Makati City
NO. NAME OF COMPANY DESIGNATION INCLUSIVE
DATES

5.0 SHASHARIKAT KEMJUAN Senior October 16, 1985


PEIMBANBU NEM PTE. Superior June 20, 1986
Building and General Contractor
SDN-BHD, BRUNEI
In Association with M.S. Electrical
Construction (Phil. Partner)

6.0 D.A. ABCEDE & ASSOCIATES Resident February 1, 1982


Construction Manger/Works Manager October 15, 1985
Engineers
#104 Perea Street, Legaspi Village,
Makati City

7.0 TEAM MANAGEMENT DEV'T. Project Engineer/ June 1, 1979


CORPORATION Executive Officer November 30, 1981

8.0 R.T. TUAZON CONSTRUCTION Junior August 1, 1978


Building & General Contractor Superior May 30, 1979
Suite 203 Gil. Preciosa Bldg., #75
Timog Avenue, Quezon City
VI. PROJECT HANDLED

NO. NAME OF PROJECT CONSTRUCTION STATUS


COMPANY COST

1.0 JOHN C. CALANSINGIN Construction of 18-Storey Php. 180,000,000.00 Completed


& ASSOCIATES One (1) Wilson Place at
Wilson St., San Juan, Metro
Manila

Construction of Seven (7) 65,000,000.00 Completed


Storey Building at Fidela A.
Reyes Street, Malate, Manila

Construction of Proposed 60,000,000.00 Completed


Four (4) Storey Building with
One (1) Basement located
at Pasay Road, Makati City

Construction of Proposed 16,000,000.00 Completed


Two (2) Storey Residence
with Attic located at
Greenmeadows Subd. Q.C.

Construction of Thirty (30) 300,000,000.00 Completed


Storey Pacific Ctr. Bldg., with
Five (5) Basements Office/
Residence at San Miguel
Ave., Ortigas Ctr., Pasig City
NO. NAME OF PROJECT CONSTRUCTION STATUS
COMPANY COST

Construction of Five (5) 100,000,000.00 Completed


Storey Bldg., with Two (2)
Basements NOVALICHES
PLAZA MALL at Quirino
Highways, Novaliches,
Quezon City

Construction of One (1) 25,000,000.00 Completed


Storey (Wet & Dry Market)
located at Molina, Bacoor,
Cavite

Construction of Cold Storage 10,000,000.00 Completed


(PHASE II) at Manggahan,
Pasig M.M.

Construction of Two (2) 10,000,000.00 Completed


Storey Residence at Bel-Air
Village, Makati City

Construction of One (1) 8,000,000.00 Completed


Storey ST. JOHN MARY
PARISH CHURCH at
Antipolo, RizaL
NO. NAME OF PROJECT CONSTRUCTION STATUS
COMPANY COST

Construction of Three (4) 60,000,000.00 Completed


Storey La O CENTRE
at Pasay Road, Makati City

Construction of Two (2) 8,000,000.00 Completed


Storey Office Building &
Cold Storage Phase I at
Pasig, Metro Manila

Construction of Four (4) 12,000,000.00 Completed


Storey Dormitory at
Nagtahan, Sta. Mesa
Manila

Construction of Two (2) 5,000,000.00 Completed


Storey Residence of Michael
Aguilar at Dasmariñas
Makati City

2.0 D.A. ABCEDE & Alexandra Condominium 800,000,000.00 Completed


ASSOCIATES Complex consisting of Eleven
Construction (11) building, Clubhouse
Management – Works Sport Complex & Swimming
Engineers Pool
NO. NAME OF PROJECT CONSTRUCTION STATUS
COMPANY COST

3.0 SPECIFIED Manila Garden General 15,000,000.00 Completed


CONSTRUCTOR, Renovation Works
INC.
Building and General
Contractor

4.0 ASIA CONST. Six (6) Storey Service Block 65,000,000.00 Completed
& DEVELOPMENT Bldg., for ADB General
Headquarters at EDSA, cor
Quadrix St., Mandaluyong

5.0 SHASHARIKAT Gadong Police Training 7,205.000.00 Completed


KEMAJUAN Complex Sewerage Dev.
PEINBANGGUANA Phase II at Lime No. 12,
PTE Jalan Maura, Brunei

6.0 D.A. ABCEDE & Tweleve (12) Storey Four (4) 95,500.000.00 Completed
ASSOCIATES Tower Bldg. Olympia Condo.
at Makati city

7.0 TEAM MANAGEMENT #250 Unit Two (2) Storey 75,000.000.00 Completed
DEVELOPMENT CORP. Ecology Condo. Complex
Phase II Inclusive of Site
Land dev. (road & drainage
system) at Pasong Tamo
Ext. Makati City
NO. NAME OF PROJECT CONSTRUCTION STATUS
COMPANY COST

8.0 R. T. TUAZON Twelve (12) Units Two (2) 9,800.000.00 Completed


CONSTRUCTION Storey Ecology Condominium

VII. REFERENCES:

1.0. ENGR. DENNIS ABCEDE


President & General Manager
D.A. ABCEDE & ASSOCIATES
Construction Manager - Works Engineer

2.0 ARCH. WILLIAM V. COSCOLLUELA


Principal Architect
W.V. COSCOLLUELA & ASSOCIATES
Architect - Engineering Consultant

3.0 ARCH. ROGER G. VILLAROSA


R. VILLAROSA & ASSOCIATES
Principal Architect

Note: For update of projects done by John C. Calansingin& Associates please refer to attached
Summary of Project Undertaken as August 30, 2008.