INTRODUCTION

• The definition of “sustainability” is the study of how


natural systems function, remain diverse and produce
everything it needs for the ecology to remain in
balance.
• It also acknowledges that human civilisation takes
resources to sustain our modern way of life.
• Sustainability takes into account how we might live in
harmony with the natural world around us, protecting it
from damage and destruction
To identify ways to manage waste
materials after construction by the
company.

To identify the strategies that been To analyse the application of sustainability


implemented for sustainable OBJECTIVE approach and construction management by
construction by the company. the company in site construction.

To identify the method used by the


company in planning and scheduling to
successfully complete the project.
SUSTAINABILITY IN CONSTRUCTION

Sustainable construction aims to meet present day


needs for housing, working environments and
infrastructure without compromising the ability of
future generations to meet their own needs in
times to come. It incorporates elements of
economic efficiency, environmental performance
and social responsibility and contributes to the
greatest extent when architectural quality,
technical innovation and transferability are
included.
BACKGROUND OF THE PROJECT

“Program Perumahan Rakyat” (PPR) is located at Permas Jaya,


Johor Bahru

Area of 8.02 hectare.

The construction consists of new added building which is 400


units of flat, parking lots and other utilities

Started in 22/12/2017 by Gerbang Nusajaya Sdn Bhd and will


end in 21/4/202.
PROJECT FINDINGS

Sustainable Construction Methods :

 Procurement
 Site Transportation
 Material management
 Waste Management
 Safety and health
 Integrated Building Design (IBS)
 Project Management
 Project Scheduling
Gantt Chart

Gantt charts are a project planning tool that used in this project
construction to represent the timing of tasks required to complete a
project. This chart shows a list of activities with the start, duration, and
finish of each activity shown as a bar plotted to a time scale. Bar charts
are an effective means of scheduling and recording progress on the
construction projects.
Physical S-Curve

This project performance control achieved by monitoring the actual


physical progress with the planned progress followed the actual
spending. While, a cost project is defined as a cumulative time-phased
budget that will be used to measure and monitor the current and
future project cost performance. Then, It is graphically represented in
the form of S-curve and it is an important cost monitoring tool.
CONCLUSION

Construction is one of the largest users of environmental resources and


one of the largest polluters of manmade and natural environments.
Sustainable approach in construction is an improvement from
conventional construction. It is a better way in construction. The
concept of sustainable is to balance between conserving the
environment without disturbed the process of construction.