Sei sulla pagina 1di 11

Applications of

Virtual Reality for the AEC Industry

Presented by :

Mr. John Rewolinski


VDC Industry Pioneer
History of BIM

2006 2012
1982 BIM and 3D modelled BIM reaches 80%
AutoCAD is released projects reach 25% industry adoption
industry adoption.

2000 2009 2016


Revit is released to BIM reaches 50% VR technology is
create the first “BIM” industry adoption. available commercially
system.

3
Components of VR
3D Model Information
(Revit, Sketchup) (Materials, Cost, Schedule)

VR
System

3D VR
Engine Headset

Function
(Lights, Elevators,
Equipment)

4
VR Process
The VR Process is fairly simple to take a design from concept to presentation

Model Information Programming Present


1 2 3 4

Design Team Conceptualizes Building Information VR Engine Programming VR Model Presentation


As soon as the design team has come Established All of the components are imported The VR model is presented to
up with a conceptual design in 3D a Functionality and information are to the VR Engine and processed for internal and external stakeholders.
VR model can be created added to the model. presentation.

5
Current
Limitations of VR

Technological Practical
As with all new technology, there There are also some practical
are some limitations to the VR limitations which may not be
System for Applications in BIM. solved with time.
These limitations will dissipate as
the technology advances.

The complexity of Revit models can It is hard to focus on the VR model if


be too much for the system you have bad vision.

Model clarity depends on hardware Some VR equipment wearers report


used and skillset of the developer motion sickness when walking.

Technology may seem too “futuristic”


Very few construction professionals
for widespread adoption by traditional
with VR experience
construction professionals

6
How much
Does VR Cost? VR is incredibly cost effective given the
benefits, and falls in line with other short
term professional services.

~$150/hr – Professional Services


The cost of professional services is in line with other
similar consultants. Though VR projects take a fraction
of the time.

$1000 - Equipment
The VR equipment and the cost of the VR engine

7
Benefits of VR Implementation

Improved Communication Business Development Cost/Schedule Savings Public Outreach Stay Cutting Edge
Limit miscommunication and receive Competitive advantage and Reduce the cost and schedule Communicate your vision more VR implementation proves that
faster owner acceptance, faster review greater communication of vision, impacts due to change orders, issue effectively to community a firm is willing to stay cutting
times and greater clarity of scope. especially for architecture and resolution and design flaws. stakeholders. edge to provide the best
design/build firms. services for their client.
8
Capabilities of VR

Show Construction Over Time in 3D


Similar to 4D scheduling software, the VR construction model can be
attached to a schedule to show construction development over time.

Integrated Cost Data


Show costs of components, assemblies, and equipment while looking at
the project.

Remote Jobsite Walkthroughs


With Drone LADAR scanning or a 3D camera, remotely view jobsite progress in
geographically diverse programs.

Show Projects in Operation


Able to virtualize operations, such as a functioning transit system, manufacturing
process, or pre-sell residential/retail space.

9
Contact Me
If you would like to speak further regarding Virtual Reality for the Architecture, Engineering & Construction Industry, please feel free
to contact me.

Phone
Mobile : 541-621-1533

Email
me@johnrewolinski.com
Questions?

Thanks for Your Time

Potrebbero piacerti anche