Sei sulla pagina 1di 23

XL 2016 LTE modernization DCDU-12B switch

allocation

v1.1

HUAWEI TECHNOLOGIES CO., LTD.


CONTENT

1. Cabinet 3900 A Ver B


2. Cabinet 3900 A Ver D
3. Cabinet 3900 L Ver B
4. Cabinet 3900 L Ver D

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 2


1. Cabinet 3900 A Ver B
2. Cabinet 3900 A Ver D
3. Cabinet 3900 L Ver B
4. Cabinet 3900 L Ver D

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 3


Cabinet 3900 A Ver B - 2 system
Existing just 2 DCDU
DCDU-03C (Existing) Note :
- This scenario for solution P1 “pentaband + RRU 3971
(DCS+LTE)+RRU 3952 (3G), GSM using MRFU “
- solution P2 (AAU 3911), GSM using MRFU
- There is 2 DCDU existing
- there is one new DCDU-12B
- DCDU-12B insert it under DCDU-01 base on illustration picture
- DCDU-12B connect handle 2 system must use two pair power
cable 25mm2 + MCB 80 A
DCDU-01 (Existing)

DCDU-12B (Insert new DCDU)


Port Allocation for DCDU-12B as bellow

load 0 load 1 load 2 load 3 load 4 load 5


RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
sector 0 sector 0 sector 1 sector 1 sector 2 sector 2

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 4


Cabinet 3900 A Ver B - 2 system
Existing just 3 DCDU

DCDU-03C (Existing) Note :


- This scenario for solution P1 “pentaband + RRU 3971 (DCS+LTE)
+RRU 3952 (3G), GSM using MRFU “
- solution P2 (AAU 3911), GSM using MRFU
• DCDU 12B new will be allocation for - There is 3 DCDU existing
solution P1 & P2, - there is one new DCDU-12B swap DCDU-01
• Existing from DCDU 01 from P1 move to - Keep DCDU-12B existing and move connection
Load 5 so on as picture beside - Cable connection from P1 to L5, P2 to L6, P3 to L7, P4 to L8, P5
to L9 by hand made using conector DCDU 12B (existing)

DCDU-01 (Existing) DCDU-12B (New DCDU)


load 0 load 1 load 2 load 3 load 4 load 5
Swap
DCDU-12B (Existing) RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
sector 0 sector 0 sector 1 sector 1 sector 2 sector 2

DCDU-01
(Existing) P1 P2 P3 P4 P5
DCDU-12B
(Existing) Load 5 Load 6 Load 7 Load 8 Load 9

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 5


Cabinet 3900 A Ver B - 3 system
Existing just 2 DCDU
Note :
DCDU-03C (Existing) - This scenario for solution P1 “pentaband + RRU 3971
(DCS+LTE)+RRU 3952 (3G), GSM using MRFU “
- solution P2 (AAU 3911), GSM using MRFU
- There is 2 DCDU existing
- there is one new DCDU-12B swapped DCDU-01
- Keep DCDU-12B existing and move connection
- Cable connection L0, L1, L2 (for RRU GSM) & L5 (for
DCDU-03 C) by hand made

DCDU-01 (Existing) DCDU-12B (New DCDU) L0 L1 L2L3L4L5L6L7L8L9

Swap

L6 conect to fan
For RRU GSM

L5 connect to power DCDU-03 C


DCDU-12B (New DCDU)

load 0 load 1 load 2 load 3 load 4 load 5


RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
sector 0 sector 0 sector 1 sector 1 sector 2 sector 2

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 6


Cabinet 3900 A Ver B - 3 system
Existing just 3 DCDU

DCDU-03C (Existing) DCDU-12B (New DCDU) L0 L1 L2 L3L4L5 L6 L7 L8 L9

Swap

For RRU GSM L8 conect to Fan

L6 conect to BBU

DCDU-01 (Existing) DCDU-12B (New DCDU)


load 0 load 1 load 2 load 3 load 4 load 5 Load 6
Swap RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
sector 0 sector 0 sector 1 sector 1 sector 2 sector 2 Fan
DCDU-12B (Existing)
Note :
- This scenario for solution P1 “pentaband + RRU 3971 (DCS+LTE)
+RRU 3952 (3G)+ RRU 3938 (GSM)“
- solution P2 (AAU 3911) + RRU 3938 (GSM)
- There is 3 DCDU existing
- there is one new DCDU-12B swaped DCDU-01
- Keep DCDU-12B existing and move connection
- Cable connection L0, L1, L2 (for RRU GSM), L6 (for BBU), & L8
(for fan) by hand made

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 7


1. Cabinet 3900 A Ver B
2. Cabinet 3900 A Ver D
3. Cabinet 3900 L Ver B
4. Cabinet 3900 L Ver D

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 8


Cabinet 3900 A Ver D - 2 system
Existing just 2 DCDU
DCDU-12C (Existing) Note :
- This scenario for solution P1 “pentaband + RRU 3971 (DCS+LTE)+RRU
3952 (3G), GSM using MRFU “
- solution P2 (AAU 3911), GSM using MRFU
- There is 2 DCDU existing
- there is one new DCDU-12B
- DCDU-12B inserted above DCDU-01 base on illustration picture

Port Alocation for DCDU-12B as bellow


DCDU-12B (Insert - New DCDU)

load 0 load 1 load 2 load 3 load 4 load 5


DCDU-12A (Existing)
RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
sector 0 sector 0 sector 1 sector 1 sector 2 sector 2

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 9


Cabinet 3900 A Ver D - 2 system
Existing just 3 DCDU
DCDU-12C (Existing) Note :
- This scenario for solution P1 “pentaband + RRU 3971 (DCS+LTE)
+RRU 3952 (3G), GSM using MRFU “
- solution P2 (AAU 3911), GSM using MRFU
- There is 3 DCDU existing
- there is one new DCDU-12B
- DCDU-12B inserted above DCDU-01 base on illustration picture
- DCDU 12B new will be allocation for solution P1 & P2

DCDU-12A (Existing) DCDU-12B (New DCDU)


load 0 load 1 load 2 load 3 load 4 load 5
Swap RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
DCDU-12B (Existing) sector 0 sector 0 sector 1 sector 1 sector 2 sector 2

DCDU-12A (Existing) L0 L2 L4 L6

DCDU-12 A load 0 (MRFU load 2 (MRFU load 4 (MRFU


(Existing) GSM) GSM) GSM) load 6 (fan)
DCDU-12B
(Existing) Load 7 Load 8 Load 9 Load 6 DCDU-12B (Existing) L6 L7 L8 L9

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 10


Cabinet 3900 A Ver D - 3 system
Existing just 2 DCDU
DCDU-12C (Existing)

load 0 load 1 load 2 load 3 load 4 load 5


DCDU-12B (Insert - New DCDU)
RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
sector 0 sector 0 sector 1 sector 1 sector 2 sector 2

DCDU-12A (Existing) DCDU-12B (New DCDU)


Note :
- This scenario for solution P1 “pentaband + RRU 3971 (DCS+LTE)
Swap +RRU 3952 (3G)+RRU 3938 (GSM) “
- solution P2 (AAU 3911)+RRU 3938 (GSM)
- There is 2 DCDU existing
L0 L1 L2L3L4L5 L6L7L8L9 - there is one new DCDU-12B swap DCDU-12A
- Keep DCDU-12B existing and move connection
- Connecting cable terminal from DCDU-12A to DCDU-12B by
hand made
L6 conect to fan
For RRU GSM

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 11


Cabinet 3900 A Ver D - 3 system
Existing just 3 DCDU
DCDU-12C (Existing) DCDU-12B (New DCDU) L0L1 L2 L3L4L5 L6 L7L8L9

Swap
L6 conect to fan
For RRU GSM

DCDU-12B (Existing)

DCDU-12A (Existing) DCDU-12B (New DCDU) load 0 load 1 load 2 load 3 load 4 load 5 Load 6
RU RU RU RU RU RU
Swap 1800 2100 1800 2100 1800 2100
sector 0 sector 0 sector 1 sector 1 sector 2 sector 2 Fan

Note :
- This scenario for solution P1 “penta band + RRU 3971
(DCS+LTE)+RRU 3952 (3G) +RRU 3938 (GSM) “
- solution P2 (AAU 3911) + RRU 3938 (GSM)
- There is 3 DCDU existing
- there is two new DCDU-12B swap DCDU-12A & DCDU 12B
- Keep DCDU-12B existing

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 12


1. Cabinet 3900 A Ver B
2. Cabinet 3900 A Ver D
3. Cabinet 3900 L Ver B
4. Cabinet 3900 L Ver D

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 13


Cabinet 3900 L Ver B - 2 system
Existing just 2 DCDU
Note :
- This scenario for solution P1 “pentaband + RRU 3971 (DCS+LTE)+RRU
3952 (3G), GSM using MRFU “
- solution P2 (AAU 3911), GSM using MRFU
- There is 2 DCDU existing
- there is one new DCDU-12B
- DCDU-12B inserted under DCDU-01 base on illustration picture
DCDU-01 (Existing)

DCDU-01 (Existing)
Port Alocation for DCDU-12B as bellow

DCDU-12B (New DCDU) load 0 load 1 load 2 load 3 load 4 load 5


RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
sector 0 sector 0 sector 1 sector 1 sector 2 sector 2

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 14


Cabinet 3900 L Ver B - 3 system
Existing just 2 DCDU
Note :
- This scenario for solution P1 “pentaband + RRU 3971
(DCS+LTE)+RRU 3952 (3G) +RRU 3938 (GSM) “
- solution P2 (AAU 3911) + RRU 3938 (GSM)
- There is 2 DCDU existing
- there is one new DCDU-12B swap DCDU-01
- Insert new DCDU-12B
DCDU-01 (Existing)

L0 L1 L2L3L4L5 L6L7 L8L9

L6 conect to fan
For RRU GSM

DCDU-01 (Existing) DCDU-12B (New DCDU)

Swap
DCDU-12B (New DCDU) load 0 load 1 load 2 load 3 load 4 load 5
RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
sector 0 sector 0 sector 1 sector 1 sector 2 sector 2

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 15


Cabinet 3900 L Ver B - 2 system
Existing just 3 DCDU
Note :
- This scenario for solution P1 “pentaband + RRU 3971 (DCS+LTE)+RRU
3952 (3G), GSM using MRFU“
- solution P2 (AAU 3911), GSM using MRFU
- There is 2 DCDU existing
- there is one new DCDU-12B
- DCDU-12B inserted above DCDU-12B (existing) base on illustration
DCDU-01 (Existing) picture
- Move MRFU 900 3 sector from sub rack 4 to sub rack 5

MOVE
MRFU 900

DCDU-01 (Existing) DCDU-12B (New DCDU)


load 0 load 1 load 2 load 3 load 4 load 5 Load 6

Swap RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100


DCDU-12B (Existing) sector 0 sector 0 sector 1 sector 1 sector 2 sector 2 FAN

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 16


Cabinet 3900 L Ver B - 3 system
Existing just 3 DCDU

Note :
- This scenario for solution P1 “pentaband + RRU
3971 (DCS+LTE)+RRU 3952 (3G)+ RRU 3938 (GSM)“
- solution P2 (AAU 3911) + RRU 3938 (GSM)
- There is 3 DCDU existing
- there is two new DCDU-12B swapped DCDU-01
DCDU-12B (New DCDU) - Keep DCDU-12B existing
DCDU-01 (Existing)

Swap

L0 L1L2 L3L4L5 L6L7 L8 L9

L6 connect to fan
For RRU GSM

DCDU-01 (Existing) DCDU-12B (New DCDU)


load 0 load 1 load 2 load 3 load 4 load 5
Swap RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
DCDU-12B (Existing) sector 0 sector 0 sector 1 sector 1 sector 2 sector 2

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 17


1. Cabinet 3900 A Ver B
2. Cabinet 3900 A Ver D
3. Cabinet 3900 L Ver B
4. Cabinet 3900 L Ver D

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 18


Cabinet 3900 L Ver D - 2 system
Existing just 2 DCDU
Note :
- This scenario for solution P1 “pentaband + RRU 3971 (DCS+LTE)+RRU
3952 (3G), GSM using MRFU “
- solution P2 (AAU 3911), GSM using MRFU
- There is 2 DCDU existing
- there is one new DCDU-12B
- DCDU-12B inserted under DCDU-01 base on illustration picture
DCDU-12A (Existing)

DCDU-12A (Existing)
Port Allocation for DCDU-12B as bellow

DCDU-12B (New DCDU) load 0 load 1 load 2 load 3 load 4 load 5


RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
sector 0 sector 0 sector 1 sector 1 sector 2 sector 2

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 19


Cabinet 3900 L Ver D - 3 system
Existing just 2 DCDU
Note :
- This scenario for solution P1 “pentaband + RRU 3971
(DCS+LTE)+RRU 3952 (3G) +RRU 3938 (GSM) “
- solution P2 (AAU 3911) + RRU 3938 (GSM)
- There is 2 DCDU existing
- One new DCDU-12B swapped DCDU-12A
- Insert new DCDU-12B
DCDU-12A (Existing)

L0 L1L2 L3L4L5 L6L7L8 L9

L6 connect to fan
For RRU GSM

DCDU-12A (Existing) DCDU-12B (New DCDU)

Swap
DCDU-12B (New DCDU) load 0 load 1 load 2 load 3 load 4 load 5
RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
sector 0 sector 0 sector 1 sector 1 sector 2 sector 2

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 20


Cabinet 3900 L Ver D - 2 system
Existing just 3 DCDU
Note :
- This scenario for solution P1 “pentaband + RRU 3971 (DCS+LTE)+RRU
3952 (3G) +RRU 3938 (GSM) “
- solution P2 (AAU 3911) +RRU 3938 (GSM)
- There is 2 DCDU existing
- there is one new DCDU-12B
- DCDU-12B swap DCDU-12A base on illustration picture
- - Move MRFU 900 3 sector from sub rack 4 to sub rack 5
DCDU-12A (Existing)

MOVE
MRFU 900

DCDU-12A (Existing) DCDU-12B (New DCDU)


load 0 load 1 load 2 load 3 load 4 load 5 Load 6
Swap RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
DCDU-12B (Existing) sector 0 sector 0 sector 1 sector 1 sector 2 sector 2 FAN

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 21


Cabinet 3900 L Ver D - 3 system
Existing just 3 DCDU Note :
- This scenario for solution P1 “pentaband + RRU
3971 (DCS+LTE)+RRU 3952 (3G)+ RRU 3938 (GSM)“
- solution P2 (AAU 3911) + RRU 3938 (GSM)
- There is 3 DCDU existing
- there is two new DCDU-12B swapped DCDU-12A
- Keep DCDU-12B existing

DCDU-12A (Existing) DCDU-12B (New DCDU)

Swap

L0 L1L2 L3L4L5 L6L7 L8 L9

L6 connect to fan
For RRU GSM

DCDU-12A (Existing) DCDU-12B (New DCDU)


load 0 load 1 load 2 load 3 load 4 load 5
Swap RU 1800 RU 2100 RU 1800 RU 2100 RU 1800 RU 2100
DCDU-12B (Existing) sector 0 sector 0 sector 1 sector 1 sector 2 sector 2

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 22


Thank you
www.huawei.com

Copyright©2013 Huawei Technologies Co., Ltd. All Rights Reserved.


The information contained in this document is for reference purpose only, and is subject to
change or withdrawal according to specific customer requirements and conditions.

Potrebbero piacerti anche