Sei sulla pagina 1di 32

College of Engineering and Design

Civil Engineering Department


Silliman University

“A Proposed Three-Storey Building For Algorithm


Computer Services Along North National Highway,
Daro, Dumaguete City”

ENAD, LUREINE MAE


PARTOSA, CHRISTIANNE E.
VELASCO, OMARIE SHAIKA

ENGR. CHRISTIAN FAITH L. CRIETA


ADVISER
ABOUT ALGORITHM COMPUTER SERVICES:

• 20-YEAR OLD ELECTRONICS STORE AIMING TO PROVIDE AS


MUCH SERVICES AS THEY CAN
• CATERS EVERY GROWING NEED FOR COMPUTER
MAINTENANCE
• SUPPLIES VARIOUS GADGETS, ACCESSORIES AND THE LIKE
• OFFERS REPAIRS AND CONSULTANCIES
• A TIMBERED BUILDING WITH MINIMAL WORK SPACES AND
LIMITED CLEARANCES
ABOUT ALGORITHM COMPUTER SERVICES:

• GROUND FLOOR: AREA FOR SALES, TECHNICIANS, AND


INVENTORY
• SECOND FLOOR: ANOTHER TECHNICIAN’S AREA,
STOCKROOM, OFFICE FOR ACCOUNTING AND THE
OWNER
• DINING AREA SITUATED AT THE BACK
• WORK SPACE FOR PROGRAMMING
“A Proposed Three-Storey Building For Algorithm Computer Services
Along North National Highway, Daro, Dumaguete City”

 EMPLOYEE’S DORMITORY
 OFFICES
 STORE
 FUNCTION ROOM
 TECHNICAL SUPPORT GROUP
 ROOF DECK
“A Proposed Three-Storey Building For Algorithm Computer Services Along North National
Highway, Daro, Dumaguete City”

STATEMENT OF THE PROBLEM:

I. WHAT WILL BE THE PRELIMINARY PROCESS?


II. WHAT WILL BE THE ARCHITECTURAL DESIGN OF THE STRUCTURE?
A.WHAT WILL BE THE FLOORING SYSTEM DESIGN?
B. WHAT WILL BE THE DRAFTING OF ELEVATIONS?
a)WHAT WILL BE THE FRONT SIDE ELEVATION?
b)WHAT WILL BE THE LEFT SIDE ELEVATION?
c)WHAT WILL BE THE RIGHT SIDE ELEVATION?
d)WHAT WILL BE THE REAR SIDE ELEVATION?
“A Proposed Three-Storey Building For Algorithm Computer Services Along North National
Highway, Daro, Dumaguete City”

STATEMENT OF THE PROBLEM:


III. WHAT WILL BE THE STRUCTURAL DESIGN OF THE STRUCTURE?
A. WHAT WILL BE THE COMPUTATION OF LOADS?
B. WHAT WILL BE THE SLAB DESIGN?
C. WHAT WILL BE THE DESIGNS FOR BEAMS AND GIRDERS?
D. WHAT WILL BE THE COLUMN DESIGN?
E. WHAT WILL BE THE ROOF DECK DESIGN?
F. WHAT WILL BE THE FOUNDATION DESIGN?
IV. WHAT WILL BE THE WORK PROCESS AND PERT-CPM FOR THIS PROJECT?
V. WHAT WILL BE THE COST ESTIMATE FOR THIS PROJECT?
VI. WHAT MATERIALS AND SPECIFICATIONS WILL BE USED AND/OR CONSIDERED?
“A Proposed Three-Storey Building For Algorithm Computer Services Along North National
Highway, Daro, Dumaguete City”

OBJECTIVES:

• TO PRESENT THE PRELIMINARY PROCESS PRIOR TO THE START OF


RECONSTRUCTION

• TO PROVIDE ARCHITECTURAL DESIGNS ACCORDING TO THE CLIENTS’


DEMANDS

• TO PROVIDE STRUCTURAL PLANS TO ACHIEVE SUSTAINABILITY AND


DURABILITY OF THE PROJECT

• TO ARRANGE AN EFFECTIVE WORK PROCESS AND MANAGEMENT


• TO PREPARE REASONABLE COST ESTIMATES
• TO STATE THE MATERIALS TO BE USED AND SPECIFICATIONS TO BE
CONSIDERED
“A Proposed Three-Storey Building For Algorithm Computer Services Along North National
Highway, Daro, Dumaguete City”

SIGNIFICANCE OF THE STUDY:

THE OWNER - WILL SUPPORT THE OWNER’S FINANCIAL NEEDS

THE COMMUNITY - PEOPLE WITH TECHNICAL DILEMMAS AND THOSE WHO


WISH TO PURCHASE COMPUTER ACCESSORIES AND GADGETS CAN DRIVE ALL
THE WAY TO THE STORE.

- ACCESSIBLE LOCATION

THE GOVERNMENT - WILL LIFT THE STATUS OF THE CITY MAKING IT MORE
PROGRESSIVE
“A Proposed Three-Storey Building For Algorithm Computer Services Along North National
Highway, Daro, Dumaguete City”

SIGNIFICANCE OF THE STUDY:

THE JOB-SEEKERS - MORE UNEMPLOYED UNDERGRADUATES WILL BE HIRED IN


THIS BUSINESS

THE DORMERS - SAFE AND QUIET PLACE TO STAY FOR EMPLOYEES LIVING
OUTSIDE THE CITY

THE FUTURE RESEARCHERS - IT WILL BE AN OPPORTUNITY FOR THEM TO USE


THEIR CIVIL ENGINEERING BACKGROUND TO PLAN AND OVERSEE
CONSTRUCTION EFFORTS IN VARIOUS AREAS OF THIS FIELD. THEY MUST APPLY
CIVIL ENGINEERING PRINCIPLES TO ENSURE THAT THE STRUCTURES ARE
CONSTRUCTED IN A SAFE AND ECONOMICAL MANNER.
“A Proposed Three-Storey Building For Algorithm Computer Services Along North National
Highway, Daro, Dumaguete City”

RELATED LITERATURE:

 AOI GLOBAL HEADQUARTERS (SUGAR LAND, TEXAS, USA)


 MULTI-HAZARD RISK AND ASSET VALUE ASSESSMENT OF HERITAGE
BUILDINGS (ILOILO CITY, PHILIPPINES)
“A Proposed Three-Storey Building For Algorithm Computer Services Along North National
Highway, Daro, Dumaguete City”

DISADVANTAGES:

1) YOU’LL NEED TO COME UP WITH A SUBSTANTIAL DEPOSIT


2) OWNING SPACES MAY BE HARDER TO RELOCATE
3) IF YOU HAVE A VARIABLE RATE MORTGAGE, YOU ARE EXPOSED TO
INCREASES IN INTEREST RATES

4) EXTRA EXPENSES FOR MAINTENANCE, FIXTURES AND FITTINGS,


INSURANCE, DECORATION AND SECURITY

5) ANY FALL IN THE VALUE OF THE PROPERTY WILL DECREASE YOUR


CAPITAL
“A Proposed Three-Storey Building For Algorithm Computer Services Along North National
Highway, Daro, Dumaguete City”

ADVANTAGES:

1) HISTORICALLY LOW PRICES


2) EQUITY APPRECIATION
3) CASH FLOW OPPORTUNITIES
C O N C E P T U A L F R A M E W O R K
S P E C I F I C F R A M E W O R K
M A N U A L C O M P U T A T I O N W O R K F L O W
M A N U A L C O M P U T A T I O N W O R K F L O W
P R O J E C T E S T I M A T E W O R K F L O W
“A Proposed Three-Storey Building For Algorithm Computer Services Along North National
Highway, Daro, Dumaguete City”

MATERIALS USED:

1) FORMWORK: TIMBER, PLYWOOD, NAILS


2) SCAFFOLDING
3) CONCRETE
4) CHB
5) STEEL REINFORCEMENT
6) CURTAIN WALLS
7) FINISHING MATERIALS: TILES, PAINT, THINNERS, BRUSH, AND ROLLERS
“A Proposed Three-Storey Building For Algorithm Computer Services Along North National
Highway, Daro, Dumaguete City”

SPECIFICATIONS CONSIDERED:

NATIONAL BUILDING CODE OF THE PHILIPPINES PD 1096


SECTION 104. GENERAL BUILDING REQUIREMENT
SECTION 105. SITE REQUIREMENTS
SECTION 401. TYPES OF CONSTRUCTION
SECTION 701. OCCUPANCY CLASSIFIED
SECTION 704. LOCATION ON PROPERTY
SECTION 705. ALLOWABLE FLOOR AREAS
“A Proposed Three-Storey Building For Algorithm Computer Services Along North National
Highway, Daro, Dumaguete City”

SPECIFICATIONS CONSIDERED:

NATIONAL BUILDING CODE OF THE PHILIPPINES PD 1096


SECTION 707. MAXIMUM HEIGHT OF BUILDINGS
SECTION 806. SIZE AND DIMENSION OF ROOMS
SECTION 808. WINDOW OPENINGS
SECTION 1108. DEMOLITION
SECTION 1202. EXCAVATION, FOUNDATION, AND RETAINING WALLS
SECTION 1207. STAIRS, EXITS, AND OCCUPANT LOADS
GROUND FLOOR PLAN
“A Proposed Three-Storey Building For Algorithm Computer Services Along
North National Highway, Daro, Dumaguete City”
SECOND FLOOR PLAN
“A Proposed Three-Storey Building For Algorithm Computer Services Along
North National Highway, Daro, Dumaguete City”
THIRD FLOOR PLAN
“A Proposed Three-Storey Building For Algorithm Computer Services Along
North National Highway, Daro, Dumaguete City”
ROOF DECK PLAN
“A Proposed Three-Storey Building For Algorithm Computer Services Along
North National Highway, Daro, Dumaguete City”
FRONT ELEVATION
“A Proposed Three-Storey Building For Algorithm Computer Services Along
North National Highway, Daro, Dumaguete City”
RIGHT SIDE ELEVATION
“A Proposed Three-Storey Building For Algorithm Computer Services Along
North National Highway, Daro, Dumaguete City”
LEFT SIDE ELEVATION
“A Proposed Three-Storey Building For Algorithm Computer Services Along
North National Highway, Daro, Dumaguete City”
REAR ELEVATION
“A Proposed Three-Storey Building For Algorithm Computer Services Along
North National Highway, Daro, Dumaguete City”
SITE LOCATION

NORTH NATIONAL HIGWAY, DARO, DUMAGUETE CITY.


LOT AREA: 298 SQ. M.
THANK YOU.

Potrebbero piacerti anche