Regulations On General Conditions for
connecting Solar PV Generation sources
• All Solar Farm supplying to National Grid must be sold to only
EDC under a PPA approved by EAC.
2
Regulations On General Conditions for
connecting Solar PV Generation sources
• The maximum capacity of the Solar Power Project, shall not be
more than 50% of the Contract Demand in kW( Power Factor of
0.90)
3
Solar PV Project
Grant aid by NEDO :
4
Customer side Solar PV
• CocaCola with installed capacity of 2MWp in PPSEZ (Pilot
Project).
5
Customer side Solar PV
• Donbosco with installed capacity of 200kWp in Sihanouk Ville.
6
Large scale solar PV
• Solar farm in Barvet City with installed capacity of 10MWp.