Radio Network
Optimization Work Flow
The RNP&O services are present throughout the network lifecycle, divided by
four parts: Scheme Traction, Radio Network Planning (including Nominal
Planning, Site Selection, Detail Planning), Radio Networking Optimization
(including Initial Tuning, Network Performance Improvement), On-going
Software
Debugging
RNP Service
Parameters
Checking RNP participate
Single Site
Verification
Test and
Analysis (DT)
RF Trouble
Shooting
Test for Comparison
(for swap)
Initial Tuning Report
Key Point:
How to find the solution for engineering quality problems and push it
Implementation Maintenance
Key points:
The manners and contents of Acceptance test: test by cluster, test the whole network
It is different between network performance acceptance test and equipment acceptance test. The performance
acceptance test is to check whether the KPI meet the requirement mentioned in the contract.
RF Optimization
Attentions:
• Simulative test with load should be taken
for trial network
• Follow the RF and engineering parameters
Engineering parameters tuning scheme
optimization work flow
• ENGINEERING PARAMETER • The optimization
TABLE methods • along
Engineering
the region Parameter table
• Drive Test Data border should be consulted to each other.
• Alarm data/Cells status
• Problems tracing table
• The neighbor cell list setting should be
• Traffic statistic data considered during engineering
• DT and traffic statistic comparison
parameters
• Coverage target range adjusting.
• Hardware and parameters
report after optimization
• All the adjusting should be informed to the
configuration related persons.
Interference Analysis
The interference is exist during all phases of the optimization process. There
are two sorts of the interference, system internal and external.
• DT result
• Traffic statistic report Attentions:
• Network engineering The parameters
solution responsibility of external
and topographical map interference should be due to the
• User complaint and equipmentcustomers. And the local Radio
alarm data Committee should take part in the
• The antenna configuration
interference clearance if necessary.
• The other related information • NETWORK INTERFERENCE
about the customer Import ANALYSIS REPORT
• Spectrum resource
• Instrument
• The references
Set the suitable neighbor cell list and handover parameters, to ensure
the smooth handover of the network.
Attentions:
• The unloaded drive test should
• Network engineering parameters
be performed during neighbor
and topographical map cell optimization
• The drive test result • The drive test route should be
bidirectional.
• The neighbor list table, the
handover parameters
• The signaling tracing data
•The optimization documents
• The traffic statistic data
• The references •Network adjusting application
import
•DT and traffic statistic
comparison report after adjusting
RF parameters optimization
Key points:
• The adjusting application should be review by the TS team
• The network KPI and coverage should be monitored after adjusting
VIP guarantee
Attentions:
• VIP users information
The VIP guarantee relates to the
customers’ satisfaction to the
• Marketing information
optimization work, and even relates
• Testing instruments
to the marketing development.
• VIP communication quality
estimation • VIP users communication quality
guarantee scheme
• VIP user issues resolve report
The network performance will meet the requirement of acceptance after the
optimization. But before the official acceptance test, continuous monitoring should
be taken to ensure the prosperous acceptance.
Attentions:
• For swap or expansion project, the network
performance before and after the implementation
should be included in the optimization report.
• The optimization• scheme
To have a self-check to confirm if the performance
• Daily network performance
meet the acceptance requirement, and take the
monitoring measurecorresponding solution procedure according to the
self-check result.
• The network information, including
KPI, traffic statistic, parameters • Daily network monitoring form
configuration • Network pre-alarm analysis report
• Daily optimization report
Customer Acceptance
After getting across the self-check, apply the acceptance to the customer, and
prove that the network performance Attentions:
meet the requirement of the acceptance
through• The
theacceptance
traffic statistic, CQT and
test principles DT result.
should be confirmed with the
customers before the official test.
• It should take the acceptance test separately by clusters for large-
• Acceptancescale network.
application report
• It should be divided into importance and common areas for the test
• Equipment commissioning report
areas.
• Engineering installation acceptance report
• The test route and spot should be consulted with the customers.
• RF optimization report
• The test instruments
• Acceptance• test performance
Various index be taken into consideration before test.
accidents should
• Acceptance• methods
Know about the acceptance test personnel, and know about their
• Test instrument preparation
concern points.
• The references
•Never give the indiscreet promises during the acceptance test.
•The network performance acceptance is different from the equipment
•RF OPTIMIZATION REPORT
installation acceptance.
Export •ACCEPTANCE REPORT
RNP
Network Preliminary Planning
Site Selection
Detail Planning
RNO
Radio Network Initial Tuning
Network Performance
Improvement