Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
RYDAIR
Electronic Air Cleaner
EAC at AHU, Complete Assembly
Innovations in Green Buildings
3-in-1 design
• Pressure Independent Control
• Automatic balancing
• Commissioning
• 2 in 1 design.
• (Automatic balancing and
control valve)
• Provide on/off or 0-10V
modulating control.
• Save installation time.
• Eliminate commissioning time.
• Ensure design performance
Innovations in Green Buildings
REGENERATIVE LIFTS
The power generated by lifts traction machines are dissipated as heat.
Regenerative Converter transmits the power back to the electrical
distribution system.
Normal mode
• heavy load up
• light load down
Regenerative mode
• heavy load down
• light load up
Auto-Tube Cleaning System
• Use of rubberized ball or brush to clean heat condenser
water tubes
14
Innovations in Green Buildings
Auto Condenser Tube Cleaning System
Cleaning of condenser tube automatically
- eliminate manual cleaning
wonderball_newtemplate_20071212 16
System Operation
2. Collection cycle
wonderball_newtemplate_20071212 17
Automatic On-line Condenser Tube Cleaning System
wonderball_newtemplate_20071212 18
Strainer
Benefits
• Optimal heat transfer in the cooling system
• Reduce electricity consumption
• Reduce costly equipment downtimes
• Lessen the usage of chemical
• Extend tube life by removing corrosive deposits
• Eliminate high cleaning cost (mechanical & chemical) in tubes
wonderball_newtemplate_20071212 20
•Air and Dirt in Chilled Water
System
Innovations in Green Building
• Air and Dirt
• Separator in
Chilled
• Water System
Innovations in Green Building
• Air and Dirt
• Separator in Chilled
• Water System
Where to install – Air & Dirt Separator
compressor
evaporator air-cooled
condenser
expansion
Chilled Water Loop device
Airside Loop (CHWP, Piping & Refrigeration Loop
(AHU & Air Duct) Cooling Coil) (Air-cooled Chiller)
Innovations in Green Buildings
80°F
(26.7°C) 54°F 50°F 110°F 97°F
(12.2°C) (10°C) (43.3°C) (36.1°C)
condenser
pump
Chilled Water Loop Refrigeration Loop Condenser Water Loop
Airside Loop (CHWP, Piping &
(AHU & Air Duct) (Water-cooled Chiller) (CWP, Piping & Cooling Tower)
Cooling Coil)
Where to install VD & ADS Best
Control
Valve Compressor Control
Valve
Filters
54°F 50°F 110°F 97°F
80°F
(12.2°C) (10°C) (43.3°C) (36.1°C
(26.7°C) )
Evaporator Condenser
AHU
Cooling
44°F 41°F 100°F 87°F tower
55°F
(12.8°C) (6.7°C) (5.0°C) (37.8°C) (30.6°C)
Expansion
Pump Valve Pump
Option
Airside Loop Chilled Water Loop Refrigeration Loop Condenser Water Loop
(AHU & Air Duct) (CHWP, Piping & (Water-cooled Chiller) (CWP, Piping & Cooling Tower)
Cooling Coil)
Vacuum Degasser – Where to install
• Installed on the return side of the chilled water system
where the pressure is more stable at that location as it’s at the
suction side of the pumps. This gives a more stable and
better working for the degasser.
•The vacuum degasser will work in any part in the
system, it is just best to have it at a location where
there is a large volume of water flowing, so the return
in a chilled water system is a good place to install a
degasser with respect to reduced condensation.
Auto Refrigerant Leakage Detection and Recovery System
Carbon Dioxide (CO2)
Sensors/Controllers
Supply Air
AHU
Fresh Air
Damper Actuator
EE5 ADVANCE EE PERFORMANCE - BEI 15 POINTS
EE5 ADVANCE EE PERFORMANCE - BEI 15 POINTS
• 10°F=2.4 Usgpm/RT
• 12°F=2.0 Usgpm/RT SAVES
• 14°F=1.7 Usgpm/RT ENERGY
Btuh= 500 x Q (Usgpm) x ∆T (deg F)
kWR= 4.187 x Q (l/s) x ∆T (deg F)
EE5 ADVANCE EE PERFORMANCE - BEI 15 POINTS
EE5 ADVANCE EE PERFORMANCE - BEI 15 POINTS