Icon steel Building work Shop

Scope
• Prepare work environment to produce two main
product
1. PEB Building & Steel Skeletons
2. Tanks & silos
Fabricated steel production stages
• Preparation is the process of component single
parts production (web ,flanges , end plates ..)
• Pre assembly is process of fabricating the main
part of the assembly which all other single part
are attached to. For example I section of a beam
the connecting of the web and flange is the pre
assembly
• Auto welding (full welding ): is the process of
continues welding along the main part
• Full assembly is the process of attaching the
other component (end plates , shear stiffeners…
) to the main part .
• Full welding is the process of welding the a
attached component
• Painting : the process of painting an coating the
finish product
OBS
production

Technical office Maintenance

Work shop inventory

Board of
purchases Quality control
directors

Marketing HR

Cost accounting

 Each department should be represented by at least one employer


Roles and responsibilities
• Technical office role :
1. Design and detail steel structure and products .
2. Create stander products catalog .
The design should fulfill the following:-
Structure safety
Economic design
Productivity
Technical office Must take into account machines
limitation & best available nesting to reduce raw
material losses.
• Work shop Role :
• Producing design according to the specification &
standers
• Purchases Role : supply work shop with required
material to perform the production processes
• Marketing role : Marketing icon steel products
and Feeding company with good deals
• Cost accounting :monitoring production costs and
define the competitive product’s price .
• Inventory role :
1. monitoring addition and exchange
2. Store raw material
3. Store finish products
4. Product release
• HR role : prepare work contract and dealing
with labors issues
• According to the scope Icon must have two main
production lines :
1. Tanks and cylinder shape production line
2. Beams and I-section production line

 Each production line consist of the same


production process with few different
Tank production lines processes

Auto Full Full


Preparation Rolling welding Painting
welding assembly welding
Beams and I-section production line
processes

Auto Full
Preparation preassembly Full welding Painting
welding assembly
• Work shop should be installed to reduce product
movement as possible and keeping product flow
• Current situation suffering of :
1. No over head cranes
2. Assembly and welding station not available
3. No product flow available
entry
Icon
Radialwork
drilling shop current situation
Cold cutting Bending machine

Simi automatic welding


Welding machines

purlin
entry
Pre-Assembly
+Auto welding
Over head crane
entry

entry
Full welding Full assembly Full welding

Cutting machine
Full Assembly Bending machine

Rolling
Drill

Purlin
machine
entry

entry
Hot rolled Cutting ,Assembly And welding stations