1 Background
2 Technology Principle
3 Delivery Process
4 Cases
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 2
Micro Site Planning Scenario
Micro F2 Micro F3
Micro F2 Macro F1/F2 Micro F3 Macro F1/F2
Micro F2 Micro F3
Micro F2 Micro F3
Performance
Counter and DT
Lag impact Depend on Expert experience
analysis
Problems are only found by Expert experience is required
customers complain, which for discovering sites with poor
Optimization affects customer experience.
and adjustment coverage and sites that
require more capacities.
Manual
planning Low efficiency
Performance Lower accuracy
Network problems can be
Counter and DT Planning result is low accuracy
analysis located with the help of a
large number of DTs and due to traffic statistics based on
performance counter cell. More accurate geographical
analysis. locations are required for site
Active of
planning.
new sites
Huawei ASP solution provides you a more accurate and smart site planning solution.
1 Background
2 Technology Principle
3 Delivery Process
4 Cases
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 6
ASP Solution Overview
ASP: Accurate site planning
RF engineering Capacity
Determination of Site Priority sequence
parameter configuration
site type location planning of new sites
planning planning
U-NET
Site
Planning
Data
Capacity 6D data processing
Processing MR coverage Map
evaluation + prediction (optional)
Idart
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 7
Network Capacity Audit &Forecast
Apr-11
Oct-11
Apr-12
Oct-12
Jan-11
Jan-12
Jan-13
Jul-11
Jul-12
Key Technical
Number of Subs Growth to end of
2012(K)
Demand of User’s
experience rate
Comparison
Provided Determine the
rate > Y number of carrier
Query required for the sector.
Cell Uu rate
tables
interface capacity (H)
again.
Provided capable
/ average rate for each
user
Number of online N
HSDPA users
Number of carrier
required for the
sector + 1
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 9
Network Audit&ForecastNONHSTCP,CODE,ENU
Subscriber growth factor
Resource Consumption breakdown
15000
10000
5000
Nov-12
Mar-11
May-11
Mar-12
May-12
Jan-11
Nov-11
Jan-12
Jul-12
Jan-13
Jul-11
Sep-11
Sep-12
X
Data growth/sub
3.5000 Overload Ratio per
3.0000 sector.
Resource Consumption per link, 2.5000
2.0000
Get the Resource Consumption per 1.5000
Physical channel 1.0000
0.5000
0.0000
TCP:transmitted carrier power
Apr-11
Apr-12
Apr-13
Oct-11
Oct-12
Oct-13
Jan-11
Jan-12
Jan-13
Jul-11
Jul-12
Jul-13
ENU: equivalent number of user
Page 10
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 10
Network Capacity Evaluation Growth Factor Description
Factor name Description scope unite Default value Remarks
Subscriber growth Subscriber growth multiplier. 1 means no
SubscriberFactor [0,+∞] NA 1
multiplier. change.
Single subscriber CS
Subscriber growth multiplier. 1 means no
CSSigFactor control-plane growth [0,+∞] NA 1
change.
multiplier.
Single subscriber CS user- Subscriber growth multiplier. 1 means no
CSUserFactor [0,+∞] NA 1
plane growth multiplier. change.
Single subscriber PS
Subscriber growth multiplier. 1 means no
PSSigFactor control-plane growth [0,+∞] NA 1
change.
multiplier.
Single subscriber PS user- Subscriber growth multiplier. 1 means no
PSUserFactor [0,+∞] NA 1
plane growth multiplier. change.
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 11
Coverage Hole Identification
Weak coverage grid
MR geographical map Weak grid combination Coverage solution
identification
Input: Identify weak coverage Aggregate close poor Provide new site solution:
Digital map grid by weak coverage grid within a certain Site type:macro, micro;
A-GPS MR data threshold distance Capacity, traffic, coverage
DT data update;
RF parameters.
Complaint data
Output : visible coverage Output: weak Output: weak Output: site addition
and signal level of each cell coverage grid coverage area suggestion
Yellow grid are weak Weak coverage area Site location planning in
RSCP Distribution
coverage. combination weak coverage area
Site addition area Site addition area: macro/micro site
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 12
Hot Spots Identification Based on Capacity
Identify overloading cells Identify hotspots area Output: traffic Output: site addition
in live or future network overloading zone suggestion for capacity
C D 已激活站点,红色表示
容量过载扇区
Overloading cell table Traffic map by grid traffic overloading zone Add site in the centre of overload
zone
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 13
Union site planning of macro µ sites
Planning Procedure based on Coverage
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 14
Micro site planning conditions and planning principles
Scenario
Add site based on coverage Add site based on capacity
Strategy
Only add micro Follow micro site planning
Follow micro site planning principles
site principles
Deployment limited as below. Deployment limited as
First priority to
1)Poor coverage area is too small to below.
add macro site
add macro sites. 1)Macro site cannot be
and then add
2)Macro site cannot be planned due planned due to site
micro site
to site distance limit. distance limit
Micro site planning principles :
1: Micro sites coverage areas should be adaptive based on RSCP
of surrounding macro site
2: Do not allow add micro site if RSCP of surrounding macro site is >-
65dBm.
3:Micro distance to the nearest macro site is larger than distance
threshold(75m).
4:Some clutters are not fit for micro sites.
5:In the same area added sites by capacity,micro sites count is limited
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 15
Key Technology: Iteration Simulation Algorithm
Evaluate coverage
Identify areas to be Evaluate new sites area
Sequencing Accurate site planning and traffic absorption
added with more sites and surrounding area
of new site
Circular calculation
Area 2 with site Area 2 with site According to the simulation and
addition addition prediction, sites added in area 1 can
resolve the capacity problem of site 2.
Area 1 with site Area 1 with site No new sites are required for site 2.
addition
New site planning
addition
for area 1
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 16
Key Technology: Capacity Config Planning for New Sites
Cell traffic absorption relationship
Traffic calculation for
Cell
Traffic of
configuration
new sites
planning
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 17
Key Technology: 6D value model
6D Model dimensions 6D model:K-value can be set by user
6D K Recomm
6D theory: ended value
Coverage K1 1
Complaint First Level: Add site by coverage, capacity and calculate total score for each site Capacity K2 1
Site cost K4 0.1
Terminal K5 0.1
Second Level:: Valued Service K6 0.1
Site If the First value is in a same range(90%), the second evaluation be triggered. VIP K7 0.1
VIP If the score of some sites are greater than the highest score* 90%, then these site
cost will join in second level, at the second level, tool will select the highest value sites.
Complaint K8 0.1
Priority reserved K9 0.1
Site
First Level::Get sites and score by coverage and capacity Custom1 K100 0.1
Second Level::select sites base on 6D evaluation Custom2 K101 0.1
Coverage Custom3 K102 0.1
Inner Circle:
Basic Valued Valued
Evaluation Service User
Outer Circle:
Second
Evaluation
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 18
Contents
1 Background
2 Working Principle
3 Delivery Process
4 Cases
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 19
Project Delivery Process
Engineering parameters
Electronic map
Antenna file
Propagation model (optional)
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 20
Raw data Preparation
Optical or
Data type Data function Data requirement non-integrity data analysis
not
Propagation optical Used for site location Corrected propagation model will improve
model planning simulation simulation accuracy.
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 21
Tools and Function
Name Tool vision Optional Data resource Function
Dense Urban with heavy traffic in Thailand: 10 days one RNC MR data(24.5G), 15 days the RNC raw traffic statistic(2.93G)
MR data pre-process: 4 hours
Capacity evaluation and target net forecast:3 hours
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 22
Delivery Time
Target NetworkAudit RD
Geolocation for
RD
smallcell
SmartCellSitePlaning RD
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 23
Contents
1 Background
2 Working Principle
3 Delivery Process
4 Cases
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR HUAWEI Confidential Page 24
Case 1 in Operator x
Solution planning Micro sites
newly added
Project Background
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 25
Case 1 in Operator x—Evaluate of Traffic absorption
Figure in a square area
surrounding the micro site or
a single sector as a basic unit,
observe the traffic flow N
days in this place appears.
Traffic before and after the
opening of the micro sites
appears the actual traffic flow
and forecast traffic flow for
comparison.
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 26
Case 2 for Site S-- Blind Spot Coverage
The mesh is DT data, among which, red
indicates DT data with weak coverage and
green indicates DR data with common
coverage.
The background is MR location data. The areas
in purple are of weak coverage and those in
blue are of common coverage.
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 27
Case 2 for Site S-- Capacity Hotspots
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 28
Appendix1:MR impact on network
1. At full load in lab, CPU load go up as 2、 X operator UMTS MR Trial test, MR impact on SPU
below: CPU is as below. Because of network low load,
absolute load goes up 0.62%, while relative load goes
CPU comparison AOUa(%) FG2a(%) SPUa(%) DSP(%)
up 9%.
V9R12B014_VDF 49.7214 35.5771 27.2881 45.1481
V9R12B014_VDF 49.4478 35.5025 31.5414 45.3842
+MR
Absolute increase —— —— 4.25 0.23
Relative increase —— —— 15.59 0.52
1、Usually network load control threshold is 60%. If MR has been acted, no need to take care of
load, and directly collect MR data. If MR hasn’t been acted and SPUa load is over 50%, MR data
should be collected by baths:
(60%-SPUa load X)/nX <= 10%,”n” is bath count. Following the formula, bath count can be
calculated.
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 29
Appendix2:AGPS impact to network
1.Impact on CPUa load 3. Access KPI,fluctuation <1%
After AGPS MR activation, AGPS MR SPUa
absolute load increase 2.5%, relative load
increase 8%.
HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 30