WAQF Podium

RADIANT ACTIVE SOLUTION


Delivered IBS Mega Projects

Jeddah central park (salam) AL ASILA Center


King Road Tower  Salam Park is located in Jeddah  Al Asila Center is located in Jeddah
 (KRT) is located in Jedddah . This building this shopping Mall is landmark on this business Building consists of one
consist of 3 buildings For Business . Jeddah building
 455 Antennas  221 Antennas  408 Antennas

<Change information classification in footer>


On Going IBS Mega Projects

NAJRAN University Al Batterrji college


King Abdullah University of Science  NAJRAN university located in Najran
 KAUST located in Rabigh . This University  Al batterji medical college is located
campus consists of Multi Buildings for this
consist of male and female university in Jeddah.
stage covering the common Level 0 campuses  342 Antennas
 449 Antennas  Above 3,000 Antennas
Delivered IBS Mega Projects

King ABDULLAZIZ endowment National Guard Health Affairs King Abdullah Medical City
podium  NGHA is located in Jeddah this  KAMC is located in MAKKAH this
 (KAEP) is located in Makkah. This building campus consists of Hospital and campus consists of Multi Medical
consist of common floors up to Level-12 and Buildings
University and facilities Buildings
towers covering B2, Lift & L7 to Ll2  412 Antennas
 1,283 Antennas
 1,498 Antennas
Building-3D View & Final Sectorization Plan

L10+L11+L12 – Radiant Active (SECTOR-C)

(Site-1)

L7+L8+L9 – Radiant Active (SECTOR-B)

L5+L6 – Radiant Active (SECTOR-E)

L3+L3MZ +L4 – Radiant Active (SECTOR-D)


(Site-2)
From B1 to L6)

L1+L2 – Radiant Active (SECTOR-C)

GF – Radiant Active (SECTOR-B)


B1 – Radiant Active (SECTOR-A)
(Site-1) B2+Lifts(SECTOR-A) – Hybrid Solution
KAEP : Sectorization Plan
MAK6108 & mak6094 : Sectorization Plan
SISO Omni/Panel
FLOOR FLOOR AREA iRU Qty. Per Floor DAS Solution iRU Per Floor iRU Per Sector Total NEU (8 Ports) Total IM2U (8 Ports)
Antenna

L12 20948 93

L11 21715 Site-1- SECTOR-C Radiant MIMO 84 272 34 5

L10 21035 95

L9 21956 81

L8 10816 Site-1- SECTOR-B Radiant MIMO 55 224 28 4


High Capacity Mega Site

L7 22230 88

L6 22902.13 103
Site-2-SECTOR-E Radiant MIMO 189 24 3
L5 22902.13 86

L4 22030.33 63

L3-MZ 24623.12 Site-2-SECTOR-D Radiant MIMO 72 215 28 4

L3 26491.3 80

L2 26453.32 77
Site-2-SECTOR-C Radiant MIMO 149 20 3
L1 29140.69 72

GF 26533.48 Site-2-SECTOR-B Radiant MIMO 80 80 10 2

B1 19167.37 Site-2-SECTOR-A Radiant MIMO 101 101 13 2

B2+Lift 32435.75 Site-1- SECTOR-A HPRU SISO 106/162


Technology & KPI
Technology
 GSM 900MHz

 DCS 1800MHz

 LTE 1800-SISO (10MHz)

 UMTS 2100MHz

 UMTS 2100MHz-MIMO (10MHz)

Following are KPI’s


 –75 dBm or better signal for GSM900 in 95% of the targeted coverage area.

 –80 dBm or better signal for DCS1800 in 95% of the targeted coverage area.

 –90 dBm or better signal for LTE1800SISO 95% of the targeted coverage area.

 -85 dBm or better for UMTS 2100 for 95% of the targeted coverage area.

 –90 dBm or better signal for LTE2100MIMO in 95% of the targeted coverage area.
Lift Antenna

FLOOR SET-1 SET-2 SET-3 SET-4 SET-5 SET-6 SET-7 SET-8 SET-9 SET-10 SET-11 SET-12 SET-13 SET-14 SET-27 SET-15 SET-16 SET-17 SET-18 SET-19 SET-20 SET-21 SET-22 SET-23 SET-24 SET-25 SET-26 SET-28

L12
L11
L10
L9
L8
L7
L6
L5
L4
L3-MZ
L3
L2
L1
GF
B1
B2
Antenna in Each Set 6 8 12 3 6 6 8 8 8 4 4 5 8 10 3 4 2 2 2 6 6 4 4 6 8 4 1 4

Total Lift Antenna 152

 Total 152 dedicated panel antenna planned inside lift shaft to provide best coverage inside lift
 Most of the lifts are from BF2 to L12
Sample Coverage Commitment

Duplex Apartment

 No permission to install antenna inside duplex floors so that this was out of coverage commitment from design.
 Duplex floor from L4 to L12.
Sample Master Active Diagram

NEU

MU
POI
LTE Traffic Comparison Hajj 2016 & Hajj 2017 for all IBS sites in MAKKAH

Hajj Peak Day Total PDCP Volume (TB) Hajj Peak Day VoLTE total traffic ( Erlang )
2016 09/15/2016 1.94 2016 09/15/2016 103.17
2017 09/06/2017 4.37 2017 09/04/2017 360.58
Delta Increased 125% Delta Increased 250%

WAQF Podium LTE Traffic during Hajj 2017 as


compare to all other IBS sites in MAKKAH.

Podium alone caring 27% traffic out of 4.37 TB


per day

IBS sites : 71 in 2016 & 83 in 2017


( Active DAS With Intelligent
Antenna system - Radiant System)

Radiant Active Components

1. Intelligent POI
2. Intelligent Master Unit (IM2U)-MIMO
3. Network Extender Unit (NEU)-MIMO
4. iRU (Quad Band)-MIMO
5. Hybrid Fiber Optic Cable
Intelligent POI
Intelligent Master Unit (IM2U)-MIMO
Network Extender Unit (NEU)-MIMO
iRU (Quad Band)-MIMO
Hybrid Fiber Optic Cable
Sample installed iRU Picture
Sample installed NEU Picture

NEU RACK inside Rack


Sample installed NEU & MU Picture

NEU installed inside Rack Located in FDR’s MU installed inside Rack located in GSM room
Sample installed POI Picture

POI installed inside Rack located in GSM room


Summery

 Nokia Flexi for all the technology with 8 sectors are installed inside GSM room located at 7F.

 Single site project is multi million USD.

 To distribute the RF signals, an ‘Active’ Distributed Antenna System (DAS) with the combination of a POI, Master Unit and Radiant
MIMO Unit will be used in the System Design.

 BF1 to L12 are covered by RADIANT active solution. Total 1230 iRU installed from BF1 to L12.

 BF2 and Lift shaft are with high power active solution. Total 106 SISO omni and 162 SISO panel installed for BF2 & Lift Shaft.

 This is multi operator & multi technology Active design for multi operators.

 There is no permission to install antenna inside duplex flats. The corridors antenna are not meeting our coverage requirements inside
room. So only corridors are considered in our coverage commitment.
Thank You!