AND WORKING OF
COAL HANDLING
5/10/2018
PLANT
1
5/10/2018
PRESENTED BY
Shrikant S.
Khating
2
INDEX
Introduction.
5/10/2018
Availability of Coal in India.
Transportation of Coal.
Analysis of Coal.
3
INTRODUCTION
5/10/2018
What is CHP?
CHP (C- Coal, H- Handling, P- Plant)
Objective of CHP :-
5/10/2018
Grade C.V. % Ash + Moisture
( K Cal / Kg. )
5/10/2018
Available only for
• 1. Railways. TPS nearer to coal
mines
• 2. Ropeways.
• 3. Roadways.
• 4. waterways. Fear of thief
• 5. Airway.
waterway may not be possible
till TPS and Problem of
recalling arises if coal dip in
water
Have to build Runway
near TPS which is very
6
costly.
BY RAIL WAY
80-90% of the requirement is fulfilled by this way.
5/10/2018
Demurrage calculations on coal Rakes:-
We receive the coal wagons in the form of rakes
5/10/2018
Chemical Analysis of Coal:-
Sample of coal is randomly collected from each
rake and detailed chemical analysis, calculation
of calorific value is carried out and is confirmed
whether it is as per agreement with the coal
mines or not.
8
GENERAL LAYOUT OF CHP
5/10/2018
Wagon Tippler Crusher House
Hopper
Feeder Surge
Hopper
Crushers
Tripper Trolley
Bunkers 9
CHP Auxiliaries
5/10/2018
10
OPERATIONAL CYCLE
5/10/2018
Bunkering Cycle
Stacking Cycle
Reclaiming Cycle
11
BUNKERING CYCLE
From W/T
5/10/2018
Crusher House
Surge Hopper
Vibrating
Feeder
Crusher
Bunkering
Belts
12
Bunkers
STACKING CYCLE
From W/T
5/10/2018
Crusher House
Coal Is not required if
bunker is full or Due any
maintenance
By-Passed Coal
Bunkering Stacking Belts
Belts
Crushed 13
Bunkers
Yard
RECLAIMING CYCLE
If Outer Supply of
coal Is Not Present
From W/T
5/10/2018
Crusher House
Non-
Crushed
Yard
Reclaiming Belts
Stacked Coal
Bunkering
Belts
Crushed
Bunkers 14
Yard
WAGON TIPPLER
5/10/2018
hoppers in very less time (e.g. 20 wagons/hr. or more).
15
WAGON TIPPLER DRIVE SYSTEM
5/10/2018
Motor
Thruster
Brake
G/B
Pinion
Spur Gear 16
GENERAL LAYOUT OF W/T
5/10/2018
Wagon tippler
Hopper
Mesh of 250 mm * 250 mm
Vibrating Feeder
Conveyor Belt
17
To crusher
House
EQUIPMENT USED IN W/T
5/10/2018
Water Sprinkler System.
Dust Extraction System.
18
CONVEYOR BELT SYSTEM
5/10/2018
Construction of Conveyor Belt
Conveyor Belt Drive System
Counter Weight
Idlers
Protection System
Interlocking
Magnetic Separator
19
CONSTRUCTION OF CONVEYOR BELT
5/10/2018
Synthetic rubber.
4 ply means 4 nylon net in between 2 mm thick
rubber coating is used.
At KTPS belt of 1000 mm width is used.
Width varies from 500 mm -1400 mm.
Strength = 600 N
1000 mm
Net
20
CONVEYOR BELT DRIVE SYSTEM
Fusible
5/10/2018
Head End
plug Pulley
Motor G/B
Fluid Coupling
Filled with 3/4th oil
Belt Speed 21
oSpeed before crusher 2.4 m/sec
oSpeed After Crusher 2.7 m/sec
COUNTER WEIGHT
Idlers Conveyor
Head End
5/10/2018
Belt
Pulley
Tail End
Pulley
Return Idlers
Take-up Pulley
Railing
Counter Weight
22
IDLERS
5/10/2018
Carry Side Return Side
35° 23
ANGLE OF IDLERS
5/10/2018
Angle Merits Demerits
24
PROTECTION SYSTEM
5/10/2018
Interlocking is used for safety purpose.
If any belt fails all other belts stop working which
are interconnected.
25
CRUSHING MECHANISM IN CHP
5/10/2018
Three Stage Crushing System is used in Plant.
1.Double Roll Crusher
2.Rotary Breaker Crusher
3.Impact Crusher
W / T No.4
600 mm
Impact Stage 3
DRCR RBCR
250 mm 80 mm
Stage 1 Stage 2 26
20-25 mm
DOUBLE ROLL CRUSHER ( DRCR )
5/10/2018
Roller
Teeth
300 mm
27
ROTARY BREAKER CRUSHER ( RBCR )
5/10/2018
250 mm
Striking
Plate
Hole of diameter 100
mm
Stone
shell
28
80 mm
IMPACT CRUSHER
5/10/2018
Coal
Hammer
30 mm Rotor
29
5/10/2018
30