Adi Novriansyah
(Taken From PETE 34)
Horizontal Drilling
Slide 2
Slide 3
Why Drill Horizontal Wells?
• Increase Reserves
Slide 4
Why Drill Horizontal Wells?
• Increase Injectivity
• - (steam, water, polymers, etc.)
Slide 5
Slide 6
Slide 7
Slide 8
Slide 9
Slide 10
Production Rates
Oryx - Austin Chalk
12 507 42
15 215 14
5 107 21
Slide 11
Production Rates
Slide 12
Drilling Costs
Austin Chalk (1993)
Slide 14
Prudhoe Bay
Slide 15
Long Radius (~1,000-3,000 ft) {~2-6 deg/100 ft}
Top Drive
Drill with 90-ft stands instead of 30-ft joints
Circulate while pulling drillpipe out of hole
Rotate drillpipe while pulling out of hole
Slide 17
New Drilling Technology
Mud Motors
Drill without rotating pipe
Change hole direction while
drilling
Steerable systems
Slide 18
Slide 19
Potential Problems in Horizontal Drilling
• Preventing/Remedying differential
sticking
• Excessive torque
Slide 20
Potential Problems in Horizontal Drilling
Slide 22
Summary
Slide 26
Method:
Build Radius: ~ 20 - 40 ft
Slide 30
Method:
Slide 31
Slide 32
Horizontal Well Pair
Slide 33
Horizontal Well Pair
Slide 34
Vertical Injection Wells and
Horizontal Production Well
Slide 35
Slide 36