Sei sulla pagina 1di 39

Delivering Clean Energy Safely

Final Presentation
of Internship Program
FINAL PRESENTATION

Ichsan Dwi Nugraha


2314100068

M. Reinaldo Ongky B.A


2314100096

Chemical Engineering Department


Institut Teknologi Sepuluh Nopember

One Team One Direction VICO Indonesia


VICO Indonesia

VICO Indonesia has been operating the Sanga-Sanga


Production Sharing Contract (PSC), which is located in the Kutai
Basin of East Kalimantan and covers an area of approximately
1,700 square kilometers, for more than 40 years. It has
produced more than 12,6 TCF of gas and 0.4 billion barrels of
liquid from the production fields in Badak, Mutiara, Semberah,
Nilam, Pamaguan, Lampake and Beras.

One Team One Direction VICO Indonesia


VICO Indonesia

Vision of VICO Indonesia is“to deliver clean, sustainable energy safely”


These are the value statements which help drive all VICO Indonesia business
decisions in pursuit of this vision:
•To maintain the integrity of people and plant
•To care for people, communities and the environment
•To deliver the outstanding performance and globally recognized.
Alongside with The Vision and Mission of VICO Indonesia, there are 4 other
value which need to be applied in every single activity:
Vision Comitment
Proaktif Dipercaya
Mencari peluang baru Diandalkan
Mengambil langkah cepat dan tepat Bertanggung jawab
Integrity Outstanding Performance
Transparant Efisiensi dan efektif
Sikap/perilaku etis Melampaui expectasi
Saling menghargai dan kerja sama Professional

One Team One Direction VICO Indonesia


Semberah Field Overview

Semberah
Badak

Nilam

Pamaguan

Mutiara

One Team One Direction VICO Indonesia


VICO Indonesia

Semberah Fields was


discovered in 1974 and
is located in the
northern most area of
the PSC. Semberah also
contains multiple oil and
gas reservoirs. All gas
and oil sent from
Semberah Wells is
directly processed at
Semberah Plant-14. Gas
is delivered to Bontang
and oil is delivered to
Tanjung Santan.

One Team One Direction VICO Indonesia


VICO Indonesia

One Team One Direction VICO Indonesia


Semberah Field Overview

Semberah Field also contains multiple oil and gas reservoirs, with production
from depths of 1000 feet to 10,000 feet. To date 107 wells have been drilled.
The peak oil rate was 14,700 BOPD in 1995 and gas rate at 180 MMSCFD in
2000.

There are 2 Station (Semberah Plant-13 and C-09 Mini Plant) within the
Semberah Operations area. Semberah Plant-13 covers Southern Semberah
Well and C-09 Mini Plant placed in the middle of Semberah Field as a booster to
cover well in area within Plant-13 and Plant-14. Northern Semberah well will
directly flow to Semberah Plant-14 (Central Plant).

One Team One Direction VICO Indonesia


Semberah Field Overview

One Team One Direction VICO Indonesia


Utility System

Utility stations for operations and maintenance activities are to


be installed to provide electrical supplies, pressured air,
nitrogen, and utility water. Electrical supplies should include
110V/220V single phase and 380V 3 phase supplies.

Semberah operation has dedicated power supplied by gas


generators (and diesel generator as a backup) in Semberah
Plant-14, Semberah Plant-13, and C-09 ligature. To ensure the
continuity of the electricity distribution to the production fields,
load shed panels are installed at Badak and Semberah Plant.
Semberah load shed panel is equipped with one load shed
systems while Badak have three load shed systems.

One Team One Direction VICO Indonesia


Laboratory Facilities

A production laboratory located inside the Badak plant facilities


and performs routine and non-routing gas, oil, water sampling
activities. Routine lab result is used as monitoring & quality
control of end product from Badak plant operation. This
laboratory facility does not only serve Badak plant, but also
doing lab test for other Facilities (Semberah, Nilam, Lempake,
Mutiara, Pamaguan)

One Team One Direction VICO Indonesia


Control System and Control Room (CR)

Semberah Operation has two control rooms, one located in


Semberah Plant-13 and the other is main control room located
in Semberah Plant-14. Semberah Plant-13 panel control room
is designed to manage and monitor process condition in
Semberah Plant-13. In Semberah Plant-14, the control room is
rules as main process control system to control and monitor
gas, crude, and produced water treatment in Plant-14.
Sufficient equipment installed to control process within the
safe operating mode & allow any emergency or unplanned
event to be evaluated, monitored and managed by the Plant
Operations team from Control Room.

One Team One Direction VICO Indonesia


Management System

One Team One Direction VICO Indonesia


Pump P-2870

One Team One Direction VICO Indonesia


Negative Positive
It can be negative when It can be positive when
liquid level is below the the liquid level is above the
centerline of the pumps. centerline of the pumps

One Team One Direction VICO Indonesia


TDH
Total Dynamics Head is the total equivalent height that a fluid
is to be pumped, taking into account friction losses in the pipe
or the amount of pressure differential created by a pump as it
operates.

The total dynamic head is the total  pressure when water is


flowing in the system. It includes pressure needed to overcome
elevation differences, and friction losses in the pipes in order
to produce a required operation pressure at the outlets.

One Team One Direction VICO Indonesia


Pump P-2870

One Team One Direction VICO Indonesia


Pump P-2870

One Team One Direction VICO Indonesia


Pump P-2870

One Team One Direction VICO Indonesia


Analysis Study on Pump P-
2870

One Team One Direction VICO Indonesia


Analysis Study on Pump
• Positive Suction

2,2 m
API Separator

2,6 m

Box Control

0,7 m

One Team One Direction VICO Indonesia


Analysis Study on Pump
• Positive Suction
OPERATING CONDITIONS
1. Pump Capacity 1371 BPD
40,0 GPM
0,15 M3/min
9085 Kg/hr
2. Operation hours 24 Hours
3. No of operation TOTAL HEAD
1. Discharge Head 113,84ft
pumps 1 Units 2. Suction pressuse 16,44 ft
4. Fluid Name Water 3. Total Head 97,40 ft
5. Normal Temperature 90 o
F
6. Normal Specific Gravity 1,0000
7. Density 62,30 lb/ft3
8. Maximum Vapor
Pressure 0,70 psi
9. Normal
Viscosity 0,86 cP
10. Line Capacity 1.371 BPD
40,0 GPM
11. % Overdesign 20,00 %
12. Capacity
Overdesign 1.646 BPD
48 GPM

One Team One Direction VICO Indonesia


Analysis Study on Pump
• Negative Suction Condition

3m
API Separator

0.3 m

3m

2,6 m

One Team One Direction VICO Indonesia


Analysis Study on Pump
• Negative Suction Condition
OPERATING CONDITIONS
1. Pump Capacity 1371BPD
40,0GPM
0,15M3/min
9085Kg/hr

2. Operation hours 24 Hours


DIFFERENTIAL PRESSURE
1. Discharge Pressure 37,03
3. No of operation pumps 1 Units 2. Suction
4. Fluid Name Water -5,66
Pressure
5. Normal Temperature 90 oF 3. Special Margin 0,00
6. Normal Specific Gravity 1,0000 4. Differential Pressure 42,69
5. Head 98,87
7. Density 62,30 lb/ft3

8. Maximum Vapor Pressure 0,70 psi

9. Normal Viscosity 0,86 cP

10. Line Capacity 1.371 BPD

40,0 GPM

11. % Overdesign 20,00 %


One12. Capacity
Team One Direction VICO Indonesia
Available Pump on Mini Plant
C-09

One Team One Direction VICO Indonesia


Available Pump on Mini Plant
C-09

One Team One Direction VICO Indonesia


Available Pump on Mini Plant
C-09

One Team One Direction VICO Indonesia


Available Pump on Mini Plant
C-09
TDH (ft)

Flow rate
(GPM)
One Team One Direction VICO Indonesia
Orifice
An orifice plate is a device used for
measuring flow rate, for reducing pressure
or for restricting flow (in the latter two
cases it is often called a restriction plate).
The orifice plate bore can be made in many
configurations to handle various flow
measurement jobs. The flowing conditions
should be checked to see which of the
configurations is suitable for each
measurement job.

One Team One Direction VICO Indonesia


Impeller

An impeller is a rotor used to increase the


pressure and flow of a fluid. Impeller is a
rotating component of a centrifugal pump
which transfer energy from the motor that
drives the pump to the fluid being pumped
by accelerating the fluid outwards from the
center of rotation.

One Team One Direction VICO Indonesia


Available Pump on Mini Plant
C-09

Larger
Impeller
Diameter

One Team One Direction VICO Indonesia


Negative Suction Condition
Calculation of The Distance from the Flame
Center to the Object or Point being considered

in most cases, equipment can safely tolerate


higher degrees of heat density that those defined
for personnel. Any items vurnerable to
overheating problems are involved, such as
construction materials that have low melting
points, heat-sensitive streams, flammable vapor
spaces, or electrical equipment, then the effect of
radiant heat on them may need to be evaluated

One Team One Direction VICO Indonesia


Negative Suction Condition
• Calculation of The Distance from the Flame
Center to the Object or Point being considered

One Team One Direction VICO Indonesia


Calculation of The Distance from the
Flame Center to the Object
• Basis Perhitungan (Oil/Cond)
Flowrate actual yaitu 230 BCPD = 2707,54 lb/hr
Hc dari oil = 17.158,3 Btu/lb
• Basis Perhitungan Gas
Flowrate actual yaitu 5,15 MMSCFD = 10791,41
lb/hr
Hc dari oil = 20.062 Btu/lb

Q1 (Oil) = Flowrate x Hc = 4,6 10^7 btu/hr


Q2 (Gas) = Flowrate x Hc = 2,2 10^8 btu/hr
Q = Q1 + Q2 = 2,6 10^8 btu/hr

One Team One Direction VICO Indonesia


Calculation of The Distance from the
Flame Center to the Object
• Basic Calculation of The Distance of Pump
directly to The Burn Pit
Q = 9,78.10^8 btu/hr
=1
F = 0,1 (Gas dan Pembakaran ideal)
K = 500 btu/hr

D = 64,6919 ft = 19,731 m

One Team One Direction VICO Indonesia


Calculation of The Distance from the
Flame Center to the Object

Burn
Pit

Pum
p
D = 64,6919 ft =
19,731 m

One Team One Direction VICO Indonesia


Conclusion
• The pump P-2870 can be replaced by using pump
available in C-09 mini plant using positive suction.
But, it is necessary to place the pump with the
distance about 19 m far from the burn pit for safety
reason.

One Team One Direction VICO Indonesia


Recommendation
• In order to avoid a similar case in the future, it is
recommended to perform the following:
1. Replace the pump P-2870 using available pump from
C-09 miniplant with positive suction immediately
but we need to focus on prevent atmospheric
pressure and the humidity conditions.
2. Replace the pump P-2870 using available pump from
C-09 miniplant with negative suction immediately
but we need to focus on placing the pump +/- 19 m
away from the burn pit for safety reason.
3. Paint the house of the new pump and skid with good
surface preparation.

One Team One Direction VICO Indonesia


References
• American Petroleum Institute. 1997. Guide for
Pressure-Relieving and Depressuring System.
• Gas Processors Suppliers Association. 2004.
Engineering Data Book.
• Geankoplis, Christie J. 2003. Transport Process and
Unit Operations. New York: Prentice Hall Book
Company
• Karassik, Igor. 2001. Pump Handbook. New York: Mc
Graw Hill Book Company
• Wibisono, Nugroho. 2008. Orifice and Restriction
Orifice.

One Team One Direction VICO Indonesia