Sei sulla pagina 1di 19

CQ203 – BULDING WORKS MEASUREMENT 2

Oleh

ZAINURIN BIN ZAINUL

Pensyarah
Jabatan Kejuruteraan Awam
Unit Ukur Bahan
POLIMAS

28-Jan-18
SMM2 Taking Off List Measurement

A B C
5600
Refer to detail 2800 2800

1 C3 C2
Refer to column C3
3500 schedule 1200
C1 C1
2

6200 1800

C3 C2 C3
Refer to detail 3
Note :
-All concrete used should be vibrated
3200
reinforced concrete grade 20.
-Cover between surface of concrete
and reinforcement members should be
C3 25mm.
C3
4
Column Detail Floor Plan

COLUMN SCHADULE

Bil Type Size mm x mm Main bar Link


Length Width
1 C1 150 150 4Y16 R6-200c/c
2 C2 200 200 4Y20 R10-150c/c
3 C3 300 300 4Y20 R10-150c/c

28-Jan-18
SMM 2 Taking Off List Measurement

1
2Y16
w
A 5800 B C

3000 2800 R10 – 225c/c D


2Y20
1 1-1
1 C3 C2 1/A-C & 2/A-C
C3
1200 2
2Y16
C1 C1
R10 – 225c/c

6200 1800 2Y20


2 2-2
A/1-3 & B/1-3
C3 C2 C3
2 3
2Y16

R10 – 225c/c
3200
2Y20 3-3
3
C/1-2 & 3/A-B
ROOF BEAM DETAILS
C3 C3

3
ROOF KEY PLAN

Note :
All concrete used should be vibrated reinforced concrete grade 20. BEAMS SCHADULE
-Cover between surface of concrete and reinforcement members should be
25mm. Bill Type Size (mm)

W D

1 1/A-C & 2/A-C 225 600

2 A/1-3 & B/1-3 225 600

3 C/1-2 & 3/A-B 150 600

28-Jan-18
SMM2 COLUMN BEAM

Taking Off List


Column

1. Concrete grade 20 m3
2. Formwork to sides m2
3. Bar reinforcement
i. 20mm Diamater High Yield kg
ii. 16mm; Ditto kg
iii. 10mm Diamater mild steel link kg
iv. 6mm; Ditto kg
Roof Beam
4. Concrete grade 20 m3
5. Formwork to sides and soffit m2
6. Bar reinforcement
i. 20mm Diamater High Yield kg
ii. 16mm; Ditto kg
iii. 10mm Diamater mild steel stirrup kg

28-Jan-18
SMM 2 Taking Off List Column Drwg.
Measurement
Conc in col

C3
C1
Length
Length
300
150
Width
Width
300
150
High
High
3500
3500
Concrete grade 20 in
column
C2
Length
2
0.15
200 C1
0.15
Width 3.50
2 0.16
200 0.20
0.20 C2
High 3.50
3500 6 0.30 0.28
0.30 C3
3.50
1.89
2.33

28-Jan-18
SMM 2 Taking Off List Column Drwg.
Measurement
Fwk. to col
Formwork to side of column
C1
Length 2
4
150 C1
0.15
High 3.50
2 4.20
3500 4
0.20 C2
3.50
6
C2 4 5.60
Length 0.30 C3
3.50
200 25.20
High 35.00
3500

C3
Length
300
High
3500

28-Jan-18
SMM 2 Taking Off List Column Drwg.
Measurement
4Y16 in column 4Y20 in column

C1 Length Length
C2 Less
Less 3500 3500
& Cover
Cover C3 1/25
1/25 25 25

Add Add
bend bend

1/9D 1/9D
144 1/9/20 180
1/9/16
3619 3655

20mm Diameter High Yield


16mm Diameter High Yield 2 main bar in column
2 main bar in column 4
4 3.66 C2
3.62 C1
6 29.28
28.96 X 16 x 16 x 0.00616kg/m 4
3.66 C3
45.67 kg
87.84

117.12 X 20 x 20 x 0.00616kg/m
288.58 kg
28-Jan-18
SMM 2 Taking Off List Column Drwg.
Measurement
R6 – 200c/c link 6mm Diameter Mild steel
in column 2 link in column
19
C1 Girth
0.67 C1
4 / 150
Less 25.46 X 6 x 6 x 0.00616kg/m
Cover 600
5.65 kg
4/2/25 200

Add 400
Bend
3/9/6 162
Add
Hook
2/9/6 108
670

Nos
200 3500
c/c 17.5 + 1
= 19 nos

28-Jan-18
SMM 2 Taking Off List Column Drwg.
Measurement
R10 – 150c/c
link in column Nos

C2 Girth 150 3500


c/c 23.3 + 1
4 / 200
Less
Cover 800 = 24 nos

4/2/25 200

Add 600
10mm Diameter Mild steel
Bend
2 link in column
3/9/10 270 24
Add 1.05 C2
Hook
6 50.40
2/9/10 180
24
1050 1.45 C3
C3 Girth 208.80
4 / 300 259.20 X 10 x 10 x 0.00616kg/m
Less
Cover 1200 159.67kg
4/2/25 200

Add 1000
Bend
3/9/10 270
Add
Hook
2/9/10 180
28-Jan-18
1450
SMM 2 Taking Off List Beam Drwg.
Measurement
Fwk to roof C/1-2 Length
beam
& 3000
1/A-C Length 3/A-B
& 5800 Width
2/A-C sides 2 / 600
Width 1200
sides 2 / 600 Add soffit 150
1200 1350
Add soffit 225
1425 Formwork to side and soffit
of roof beam
Length
A/1-3 2
5.80 1/A-C & 2/A-C
6200
& 1.43
B/1-3 2 16.59
Width 6.20 A/1-3 & B/1-3
2 / 600 1.43
sides
2 17.73
1200
3.00 C/1-2 & 3/A-B
Add soffit 225 1.35
1425 8.10
42.42

28-Jan-18
SMM 2 Taking Off List Beam Drwg.
Measurement
Conc in roof
beam Concrete grade 20 in roof
beam
Length
1/A-C
5800
&
2
Width 5.80
2/A-C 0.23 1/A-C & 2/A-C
225 0.60
Depth 2 1.60
6.20
0.23 A/1-3 & B/1-3
600 0.60
2 1.71
Length 3.00
0.15 C/1-2 & 3/A-B
A/1-3 6200 0.60
& Width 0.54

B/1-3 225 3.85


Depth
600

Length
C/1-2
3000
&
Width
3/A-B
150
Depth
600
28-Jan-18
SMM 2 Taking Off List Beam Drwg.
Measurement
2Y16 in roof
beam
Top Top

1/A-C Length C/1-2 Length

& Less 5800 & 3000


Less
Cover 3/A-B Cover
2/A-C
2/25 50 2/25 50
Add Add
bend 5750 2950
bend
2/9D 2/9D
2/9/16 288 288
2/9/16
6038 3238

Top 16mm Diameter High Yield


Length 2 main bar in roof beam
A/1-3 2
Less 6200
& 6.04 1/A-C & 2/A-C
Cover
B/1-3 2 24.16
2/25 50 2
Add A/1-3 & B/1-3
6.44
bend 6150 2
25.76
2/9D 2
288 3.24 C/1-2 & 3/A-B
2/9/16
6438 12.96

62.88 X 16 x 16 x 0.00616kg/m
99.16 kg
28-Jan-18
SMM 2 Taking Off List Beam Drwg.
Measurement
2Y20 in roof
beam
Bottom Bottom
Length C/1-2
1/A-C Length
5800 &
& Less Less 3000
Cover 3/A-B Cover
2/A-C
2/25 50
2/25 50
Add
5750 Add
bend 2950
bend
2/9D
2/9D
360
2/9/20 360
2/9/20
6110
3310

Bottom 20mm Diameter High Yield


Length 2 main bar in roof beam
A/1-3 2
Less 6200
& 6.11 1/A-C & 2/A-C
Cover
B/1-3 2 24.44
2/25 50 2
Add A/1-3 & B/1-3
6.51
bend 6150 2
26.07
2/9D 2
360 3.31 C/1-2 & 3/A-B
2/9/20
6510 13.24

63.72 X 20 x 20 x 0.00616kg/m
157.01kg
28-Jan-18
SMM 2 Taking Off List Beam Drwg.
Measurement
R10 – 225c/c stirrup in Girth
C/1-2
roof beam
150
&
Girth 600
1/A-C 3/A-B
225 2 / 750
& Less
600 Cover 1500
2/A-C
2 / 825 4/2/25 200
Less
Cover 1650 Add 1300
Bend
4/2/25 200
3/9/10 270
Add 1450 Add
Bend Hook
3/9/10 270 2/9/10 180
Add 1750
Hook
180 Nos
2/9/10
1900 225 3000
c/c 13.3 + 1
Nos
5800 = 14 nos
225
c/c 25.8 + 1
10mm Diameter Mild steel
= 27 nos 2 stirrup in roof beam
Nos 27
A/1-3 225 6200 1.90 1/A-C & 2/A-C
& c/c 102.60
27.6 + 1
28-Jan-18 B/1-3 = 29 nos
SMM 2 Taking Off List Beam Drwg.
Measurement

2
a.b.d, stirrup in roof beam

29
1.90 A/1-3 & B/1-3
2
110.20
14
1.75 C/1-2 & 3/A-B
49.00

261.80 X 10 x 10 x 0.00616kg/m
161.27 kg

Sekian

28-Jan-18
Taking Off List Column Drwg. Beam Drwg.

STANDAR METHOD OF MEASUREMENT


(Building Works) SMM 2

Item Description Ulasan keterangan kerja Ulasan Kaedah


(Taking Off List) Pengukuran
1. Concrete in 1. Reinforced in-situ Bahagian yang digaris Di ukur dalam unit M3
isolated concrete grade 20 in
column (Tiang) isolated column or Grade konkrit adalah F.3.15 – Tiang terasing
beam. berdasarkan kepada grade diukur berasingan.
2. Concrete in or yang dinyatakan di dalam
suspended beam 2. Vibrated reinforced lukisan.Kedudukan konkrit
(Rasuk) or roof concrete grade 20 in perlu dinyatakan samaada
beam isolated column di dalam “column” atau
(rasuk bumbung) “beam”
3. Vibrated reinforced
concrete grade 20 in
beam or roof beam

28-Jan-18
Taking Off List Column Drwg. Beam Drwg.

STANDAR METHOD OF MEASUREMENT


(Building Works) SMM 2
Item Description Ulasan keterangan kerja Ulasan Kaedah
(Taking Off List) Pengukuran

1. Formwork to isolated Formwork to sides of Bahagian yang bergaris Diukur di dalam unit M2
column. isolated column. menunjukkan papan acuan F.15.4- Tempat pertemuan
(Papan Acuan Tiang) berada disekeliling tiang dengan rasuk tidak perlu
yang perlu diukur. ditolak.

2. Formwork to sides and Formwork to sides and Bahagian yang bergaris


soffit of suspended soffit of beam menunjukkan papan acuan
beam. berada pada sisi dan
(Papan Acuan Rasuk) Or bawah rasuk yang perlu
diukur.
Formwork to sides and
soffit of roof beam

28-Jan-18
Taking Off List Column Drwg. Beam Drwg.

STANDAR METHOD OF MEASUREMENT


(Building Works) SMM 2
Item Description Ulasan keterangan kerja Ulasan Kaedah
(Taking Off Pengukuran
List)
1. Bar 1. Main bar Besi teteulang ini dibentuk F.9.3 -Tetulang jenis ini
reinforcement. 20mm Diameter High sepertimana didalam lukisan diukur di dalam unit
(besi tetulang) Yield bar reinft. in Bahagian yang digaris merupakan kilogram (kg) @ tonne
column diameter besi tetulang dan perlu Pengukuran perlu dibuat
dinyatakan juga jenis besi yang terlebih dahulu di dalam
2. Link digunakan sebagai cth:- meter linear @ meter
8mm Diameter Mild “Y12” @ T20 @ “R6” dimana panjang dan kemudiannya
Steel links in column. Y (High Yield) & ditukar kepada berat (kg).
T (High Tensile) & R (Mild Steel)
3. Stirrup mengambarkan jenis besi yang
8mm Diameter Mild digunakan manakala angka berikut
Steel stirrup in beam. iaitu 12 & 20 & 6 merupakan
diameter besi yang digunakan.
or Perlu dinyatakan juga sama ada
ianya Main bar @ Link @ Stirrup di
8mm Diameter Mild dalam keterangan kerja dan
Steel stirrup in beam. kedudukan besi itu spt. Cth:-
column @ beam @ roof beam.

Penggunaan istilah
Link :- Hanya untuk column
Stirrup :- Hanya untuk beam
28-Jan-18