Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
1
Role of Underground Mining
Appeal of surface Mining:
Mass production and minimum cost.
Attraction of U/Mining : Variety and Versatility of
methods.
USA: Surface mining, 85 %
Underground Mining, 15 %
Non metallic ore 4%
Metallic ore 13%
Coal 42%
Table 5.1, page 150
2
Role of Underground Mining
Mostly Fluorite, lead, potash, trona (sodium carbonate compound) and
Coal, Salt and Silver are mined by U/M method.
Reasons for U.G mining
Increasing depth
Reduced mobility of large scale surface machinery
Ever tightening environmental controls
Promising advances in U/G rock boring and continuous
mining
3
Uniqueness of Underground access
Preparation for development and exploitation require
certain considerations which otherwise surface mining
does not need.
The most critical are
Ore and rock strength
The presence of ground water
Rock temperature
Rock gradient
Economic-political and environmental factors
4
Uniqueness of Underground access
Further
Skilled labor must be recruited
Financing may be difficult because higher risk is
involved
Subsidence must be controlled.
Limited excavation and relatively small opening
Overall cost may be high
More careful attention may be given to
Survival of life
Construction and scheduling of openings
5
Sequence of development
Adoption of feasibility report as a planning document,
subject to modification as development progresses.
Confirmation of mining method.
Arrangement of financing based on confirmed cost
estimates.
Acquisition of land, including mineral rights and surface as
needed.
Filling of environmental impact statement, obtaining
mining permit including reclamation plan.
Provision of surface access, transportation, communication
and power supply to the mine site.
6
Sequence of development
Planning and constructing of surface plant, including
all support and service facilities and administrative
offices.
Erection of mineral processing plant, if required and
ore handling and shipment facilities and provision of
stockpiling and waste disposal facilities.
Selection of mining equipment for development and
exploitation.
Construction of main access opening to ore body and
such secondary openings.
7
Sequence of development
Recruitment and training of labor force and provision
of support services (housing, transportation,
consumer stores etc).